Refinery & gas plant register · Refinery

Basrah Refinery: water, effluent and process profile

Basrah Refinery (Shuaiba refinery). Operator: South Refineries Company (SRC), state company under the Iraqi Ministry of Oil, founded 1969, headquartered at Shuaiba, Basra. Status: operating.

Compiled 25 September 2026 · confidence: medium

Water & effluent

Intake source
river
Intake note
Inferred: the Shatt al-Arab is the main raw-water source for Basra; the refinery's own intake point is not published.
Not public (cooling)
Existence of a 'cooling water plant' in the FCC complex is published; whether the older units use towers or once-through is not.
Raw water quality
Shatt al-Arab has become saline from seawater intrusion: 25,000-40,000 TDS reported over 120 km of the river (2025); Nov 2025 report: Faw 30,000 ppm, central Basra 15,000 ppm, Qurna 3,000 ppm. Basra municipal RO plants are designed for 2,000-30,000 mg/l feed salinity. Refinery-specific intake analysis not public.
Effluent treatment
API/CPI
Effluent treatment note
Existing system type not described beyond removing oil/grease and TSS without 'integrated treatment units' (inferred primary oil separation only). New FCC complex includes its own WWTP (type not published).
Discharge to
Shatt Al-Basrah canal (per academic discharge studies)
Not public (discharge)
Iraqi effluent limits are referenced in the studies ('Iraqi limiting criteria') but the refinery permit and numerical limits are not public; the governing instrument (Iraqi river-maintenance regulation) must be confirmed.
Sources
researchgate.net ; researchgate.net ; thenewregion.com ; thenewregion.com ; constructionweekonline.com ; nsenergybusiness.com

Known issues

  • 2009-2010 monitoring: turbidity, TDS, sulphide, sulphate, COD, oil and grease and phenols exceeded Iraqi limits at discharge
  • Duckweed phytotreatment trial on refinery wastewater: BOD5 -49.6%, COD -32.7%, oil and grease -43%, phenols -40% (indicates residual organics after existing treatment)
  • Raw-water salinity crisis on the Shatt al-Arab (2018 and 2025) makes any fresh-water-based wash water, boiler feed or cooling make-up a desalination duty

Site, ownership & capacity

Owners
NameShare pctSourceBasis
Republic of Iraq, Ministry of Oil (via South Refineries Company)100src.gov.iqstate company; 100% inferred from state ownership, no share figure published
Country
Iraq
Region
Basra Governorate
Town
Shuaiba, Basra
Coastal
No
Water body
Shatt al-Arab / Shatt Al-Basrah canal system (effluent studies refer to discharge to the Shatt Al-Basrah canal)
Not public
Plant coordinates, elevation and the exact raw-water intake point are not published; coastal=false is inferred (Shuaiba is inland of the Gulf coast) and should be confirmed from satellite imagery.
Sources
src.gov.iq ; researchgate.net

Capacity

Crude bpd
280,000
Notes
280,000 bpd after the fourth 70,000 bpd distillation unit (inaugurated 23 Dec 2023). Argus (29 Oct 2025) still quotes 210,000 b/d, so nameplate reporting is inconsistent. Nelson complexity not published (gap).
Sources
iraqoilreport.com ; mees.com ; argusmedia.com

Process units

UnitCapacityYearSource
CDU70,000 bpd (Refinery 1 / first refining unit)1974src.gov.iq
CDU70,000 bpd (second refining unit; SRC site prints '700,000', which is a typo: total became 140,000)1979src.gov.iq
CDU70,000 bpd (Refinery 3; construction from 2011)2014src.gov.iq
CDU70,000 bpd plus LPG 167 t/d (fourth refining unit; contractor Techno Export (Czech), later replaced)2023en.964media.com
HDS/HDTRefinery 3 hydrotreating ('hydrogenation') unit, capacity not published2015src.gov.iq
reformerRefinery 3 'gasoline improvement' unit, capacity not published2015src.gov.iq
HDS/HDT2 x 29,000 bpd light-distillate hydrotreating units (undated older listing)abarrelfull.wikidot.com
reformer2 x 8,000 bpd 'gasoline improvement' units (undated older listing)abarrelfull.wikidot.com
HDS/HDT1 x 12,000 bpd gas-oil hydrotreating unit (undated older listing)abarrelfull.wikidot.com
fractionation2 x 200 t/d LPG production units (undated older listing)abarrelfull.wikidot.com
VDUVacuum and solvent (lube base oil) units, capacity not published1986abarrelfull.wikidot.com
fractionationWax unit 100,000 t/yr (established 1982, operational 1996)1996abarrelfull.wikidot.com
CDU4 x 10,000 bpd mobile (packaged) refining units, operated Feb-Sep 19971997abarrelfull.wikidot.com
FCC34,500 bpd (FCC complex, JGC EPCC). Iraqi government releases (Oct 2025) quote '107,000 bpd' for the FCC strategic unit, probably complex-level throughput; unreconciled2025jgc.com ; en.964media.com
VDU55,000 bpd (new, FCC complex)2025jgc.com
HDS/HDT40,000 bpd diesel desulphurisation unit (new, FCC complex)2025jgc.com
HDS/HDTHydrotreating facility and light gas oil hydrotreater (FCC complex), capacity not published2025nsenergybusiness.com
hydrogen plantnot published (FCC complex)2025nsenergybusiness.com
SRUnot published (FCC complex)2025nsenergybusiness.com
sour water strippernot published (FCC complex)2025nsenergybusiness.com
amineamine regeneration unit, not published (FCC complex)2025nsenergybusiness.com
fractionationVisbreaking unit and LPG oligomerisation unit, not published (FCC complex)2025nsenergybusiness.com

Known equipment

ItemDetailNot publicVendorSourceNote
desalterNo public record of the desalter make, stages, count or transformer rating at any of the four distillation units.SRC tender portal (src.gov.iq) and Iraqi Ministry of Oil tender bulletins; a site visit or SRC data request for desalter nameplates.
electrostatic transformerNot found in public sources for this site.Same as desalter; transformer kVA/voltage is on the desalter datasheets.
WWTP unitFCC complex offsites include a waste water treatment plant, water treatment plant, cooling water plant, three steam generators, flare gas recovery units, nitrogen and instrument-air generation.JGC (EPCC)nsenergybusiness.com
WWTP unitExisting refinery wastewater treatment system (studied 2009-2010) reduced oil and grease and TSS but 'lacks integrated treatment units'; turbidity, TDS, sulphide, sulphate, COD, oil and grease and phenols exceeded Iraqi limits.researchgate.netFull text returned HTTP 403; detail taken from search-result abstracts only.
cooling towerCooling water plant listed in FCC complex offsites; type (towers vs once-through) not stated.nsenergybusiness.com

Feed

Crude slate
  • Southern Iraqi field crude (Rumaila/Zubair area) by pipeline; exact grade to the refinery not published
Reference grades
Basrah medium
Api
27.93
Sulphur wt pct
3.45
Tan
0.11
Note
assay summary via search result; date not seen
Sources
scribd.com
Basrah medium salt ptb
Value
291.1
Basis
OIES Table 6, Nov 2020 assay spec; column mapping to Basrah Medium inferred from table order and OIES text that Medium has 'higher-than-acceptable salt'. Basrah Light 36.7 and Basrah Heavy 34.6 lb/1000 bbl on the same basis.
Sources
oxfordenergy.org
Basrah heavy
Api
23.7
Sulphur wt pct
4.12
Tan
0.3
V ppm
93
Ni ppm
24
Fe ppm
50
Assay date
2015-06-04 (BP)
Sources
ogj.com
Not public
Which grade (or unsegregated field blend) SRC actually charges is not public; ask SRC for the charge assay and desalter inlet/outlet salt (PTB). Field desalting upstream is in progress (ROO installing dehydrators and desalters per OIES).
Sources
iraqoilreport.com ; en.wikipedia.org

Chemistry & corrosion risks

  • high salt crude
  • chloride/overhead corrosion
  • H2S/SSC
  • emulsions
  • scaling
  • fouling
  • naphthenic acid corrosion

High salt: Basrah Medium spec salt 291.1 lb/1000 bbl (OIES, basis inferred) drives desalter duty and overhead chloride. H2S/SSC: reference grades carry 3.45-4.12 wt% sulphur. Naphthenic acid: listed for completeness but LOW on published TAN (0.11-0.30 mg KOH/g, below the usual ~0.5 threshold). Emulsions: basis inferred from high salt and water content in the reference grades; no site emulsion data found. Scaling/fouling: saline Shatt al-Arab make-up water.

Site conditions

Climate
Hot desert; extreme summer heat
Ambient max c
53.9
Ambient note
53.9 C recorded at Basra, 21-22 July 2016 (Iraqi Meteorological Department). A 56 C Basra airport claim (2013) is less well sourced.
Not public (seismic)
Iraqi seismic code zone for Basra not retrieved.
Ground
Basra soils: gypsum, high salinity, shallow water table; sulphate attack is the main cause of concrete foundation deterioration; groundwater evaporation increases salinisation. Site-specific geotechnical data not public.
Not public (flood)
No site-specific flood data found.
Not public (hazardous area)
Not published; JGC-built FCC complex likely to IEC/IECEx practice but unconfirmed - ask SRC for the area classification drawings and certification requirement.
Sources
gulfnews.com ; plantmaps.com ; faculty.uobasrah.edu.iq ; researchgate.net

History

YearEventDetailSource
1969ownership changeSouth Refineries Company established as a state company under the Ministry of Oil.src.gov.iq
1974commissioningFirst refining unit (70,000 bpd) started production 4 July 1974. (NS Energy gives 1973 commissioning and 170,000 bpd original capacity; SRC's own figures preferred.)src.gov.iq
1976expansionConstruction of the second 70,000 bpd refining unit began.src.gov.iq
1979expansionSecond unit on stream; refinery capacity 140,000 bpd.src.gov.iq
1980outageProduction stopped by the Iran-Iraq war for eight years.src.gov.iq
1982expansionWax unit (100,000 t/yr) established; operational 1996.abarrelfull.wikidot.com
1986expansionVacuum and solvent units added.abarrelfull.wikidot.com
1989revampRestarted after about two years of reconstruction by Iraqi staff.src.gov.iq
1991incidentRefinery destroyed by coalition bombing in the Gulf War (SRC dates it 1990) and restarted in 1991.src.gov.iq
1997expansionFour 10,000 bpd mobile refining units operated February-September 1997.abarrelfull.wikidot.com
2011upgradeShaw awarded a feasibility study for refinery rehabilitation; construction of the third 70,000 bpd unit began.abarrelfull.wikidot.com ; src.gov.iq
2012upgradeBasrah Refinery Upgrading Project (FCC complex) launched with JICA ODA financing.iraq-businessnews.com
2014expansionThird refining unit on stream; capacity 210,000 bpd.src.gov.iq
2015expansionThird hydrotreating and gasoline improvement unit operating. Technip and UNICO International appointed PMC for the upgrade (April 2015). Techno Export contracted mid-2015 for the fourth unit.src.gov.iq ; nsenergybusiness.com ; en.964media.com
2018expansionMinistry of Oil announced work on the 70,000 bpd expansion (target 280,000 bpd by end-2018; delivered 2023).hydrocarbonprocessing.com
2020outageApril 2020: two-thirds of 210,000 bpd capacity shut in as COVID-19 cut demand.iraqoilreport.com
2020upgradeJGC awarded EPCC for FCC complex (FCC 34,500, VDU 55,000, DDU 40,000 bpd), about JPY 400 bn, August 2020.jgc.com
2023expansionFourth 70,000 bpd refining unit inaugurated 23 Dec 2023 (167 t/d LPG); Techno Export removed, legal dispute unresolved; capacity 280,000 bpd.en.964media.com ; iraqoilreport.com
2025upgradeFCC complex inaugurated by PM al-Sudani 25 Oct 2025; commissioning phase from Oct 2025; commercial operation expected Dec 2025; JGC technology transfer to Dec 2026.en.964media.com ; argusmedia.com
2026outageFCC unit stood down under preservation when JGC suspended work after Japan raised its security risk assessment (regional military developments); JGC lifted force majeure and returned 10 Aug 2026 to finish commissioning.tradingview.com,2026-07-31:newsml_Zaw7XyxFX:0-iraq-s-basra-fcc-unit-ready-for-restart-pending-return-of-japanese-contractor/ ; mees.com

Performance

Throughput recent
Jan 2024: refinery 'receiving up to 300,000 bpd' of crude from southern fields after pipeline completion. Before its 2026 stoppage the FCC was making about 1.5 million litres/day gasoline.
Notes
No audited recent crude runs published; utilisation not calculable. Target products from FCC complex: about 5 million l/d gasoline, 7 million l/d diesel, 400 t/d LPG (Ministry of Oil, Aug 2026).
Not public
Monthly crude runs from Ministry of Oil statistics or JODI.
Sources
iraqoilreport.com ; tradingview.com,2026-07-31:newsml_Zaw7XyxFX:0-iraq-s-basra-fcc-unit-ready-for-restart-pending-return-of-japanese-contractor/ ; iraqinews.com

Projects

ProjectStatusEpc or licensorYearSource
Basrah Refinery Upgrading Project - FCC complex (33 units incl. FCC, VDU, DDU, H2, SRU, SWS, amine, WWTP), USD 4.8 bnMechanically complete; commissioning resumed after JGC returned 10 Aug 2026JGC (EPCC) with Hyundai E&C JV; Technip/UNICO PMC; JICA ODA loans2026mees.com ; tradingview.com,2026-07-31:newsml_Zaw7XyxFX:0-iraq-s-basra-fcc-unit-ready-for-restart-pending-return-of-japanese-contractor/
JICA 6th-phase loan, USD 388 m, for the Basrah Refinery Upgrading Projectsigned Nov 2024JICA2024iraq-businessnews.com
SRC limited tender 522/2025: control rooms for hydrotreating and reforming units of Basra Refinery 3tendered 20252025turkishmarketer.com
'FCC unit' USD 125 m, Japanese loan, about 75% complete (Jan 2024), equipment from China via Umm Qasrreported Jan 2024; relation to the JGC complex unclear (cost figure inconsistent with USD 4.8 bn)2024iraqoilreport.com

Sources & confidence

This profile is compiled from public documents only. Figures are quoted as published, and any inferred value is labelled as inferred. If you can correct or add to it, please contact us.

  1. https://src.gov.iq/en/about.aspx
  2. https://www.src.gov.iq/en/tenders
  3. https://www.jgc.com/en/news/2020/20200812_1.html
  4. https://www.nsenergybusiness.com/projects/basrah-oil-refinery-upgrade/
  5. https://www.jica.go.jp/english/overseas/iraq/information/press/2021/press211004.html
  6. https://www.iraq-businessnews.com/2024/11/19/japan-signs-388m-loan-for-basrah-refinery-upgrade/
  7. https://en.964media.com/6540/
  8. https://en.964media.com/41633/
  9. https://www.iina.news/iraq-launches-fcc-unit-at-al-shuaiba-refinery/
  10. https://www.iraqoilreport.com/news/qa-hossam-hussein-wali-director-general-of-the-south-refineries-company-3-46248/
  11. https://www.iraqoilreport.com/news/iraq-slashing-allocations-to-largest-refinery-as-demand-plummets-42654/
  12. https://www.argusmedia.com/en/news-and-insights/latest-market-news/2747938-iraq-s-basra-refinery-completes-upgrades
  13. https://www.mees.com/2026/8/21/news-in-brief/jgc-resumes-basrah-fcc-project/b8a43830-9d80-11f1-bff0-09de6803a7fa
  14. https://www.tradingview.com/news/reuters.com,2026-07-31:newsml_Zaw7XyxFX:0-iraq-s-basra-fcc-unit-ready-for-restart-pending-return-of-japanese-contractor/
  15. https://www.iraqinews.com/iraq/iraq-resumes-basra-fcc-project-jgc-japan-fuel-production-2026/
  16. https://www.hydrocarbonprocessing.com/news/2018/04/iraq-starts-work-on-70-mbpd-expansion-of-southern-oil-refinery
  17. http://abarrelfull.wikidot.com/basrah-refinery
  18. https://www.oxfordenergy.org/wpcms/wp-content/uploads/2021/04/The-second-split-Basrah-Medium-and-the-challenge-of-Iraqi-crude-quality.pdf
  19. https://www.ogj.com/refining-processing/petrochemicals/article/17209679/guide-to-world-crudes-bp-issues-assay-for-basrah-heavy
  20. https://www.scribd.com/document/870748395/Basrah-Medium
  21. https://en.wikipedia.org/wiki/Rumaila_oil_field
  22. https://www.researchgate.net/publication/310606824_Physiochemical_Properties_of_Basrah_oil_refinery_discharges_and_its_potential_effects_on_Shatt_Al-Basrah_Canal
  23. https://www.researchgate.net/publication/267423289_Efficiency_of_Duckweed_LemnaMinor_L_in_Phytotreatment_of_wastewater_pollutants_from_Basrah_oil_refinery
  24. https://thenewregion.com/posts/3461
  25. https://thenewregion.com/posts/3740
  26. https://www.constructionweekonline.com/projects-tenders/water-treatment-plant-on-the-banks-of-basras-shatt-al-arab-river-completed
  27. https://gulfnews.com/world/mena/iraq-records-hottest-day-of-the-year-in-basra-1.1867221
  28. https://www.plantmaps.com/en/iq/climate/extremes/c/iraq-record-high-low-temperatures
  29. https://www.faculty.uobasrah.edu.iq/uploads/publications/1780790728.pdf
  30. https://www.researchgate.net/publication/324013310_Effect_of_groundwater_salinity_level_on_soil_using_remote_sensing_and_gis_techniques_Case_study_of_southwest_of_Basra_Province
  31. https://turkishmarketer.com/adminrequestpost/2198?title=iraq-south-refineries-company-src-basra-refinery-tender-for-the-construction-of-control-rooms-for-3-hydrogenation-and-recycling-units-522-2025
  32. https://www.gov.uk/government/publications/iraq-sanctions-guidance
  33. https://www.legislation.gov.uk/id/uksi/2020/707