Refinery & gas plant register · Refinery
Fawley Refinery: water, effluent and process profile
Fawley Refinery (Esso Refinery, Fawley) - integrated with ExxonMobil Chemical Fawley petrochemical plant. Operator: Esso Petroleum Company, Limited (ExxonMobil affiliate); petrochemical plant within the same EPR installation boundary operated by ExxonMobil Chemical Limited (permit ZP3839MG). Status: operating.
Compiled 25 September 2026 · confidence: medium · what that means here
Water & effluent
- Intake source
- sea (cooling, Southampton Water) + municipal (Southern Water Testwood works, River Test, for process water)
- Cooling
- once-through seawater
- Raw water quality
- Cooling: estuarine seawater from Southampton Water (analysis not public). Process/boiler make-up: Southern Water's Testwood works, which draws from the River Test and also supplies the Esso refinery at Fawley; there is a separate Testwood Industrial Water Supply Works. Treated on site by raw water treatment and RO for demineralised water.
- Effluent treatment
- API/CPI + DAF/IGF (oil separators, dual media filtration, DAF, clarifiers); no biological stage
- Discharge to
- Southampton Water via three outfalls (W1, W2, W3) onto intertidal mudflats close to high water within the Solent and Southampton Water SPA; the refinery also treats wastewater from the ExxonMobil Chemical plant
- Discharge regime
- EPR/BR6996IC (Environmental Permitting (England and Wales) Regulations 2016; IED; Refining BAT Conclusions 2014/738/EU; CWW BREF), consolidated variation V007 2018, V008 2019. W1 (SEPS 1 + sanitary): pH 6-9; HOI 2.5 mg/l annual average; oil 5 mg/l; TN 25 mg/l; NH4-N 5 mg/l; mono-phenols 1 mg/l; TOC 20 mg/l; COD 125 mg/l; TSS 25 mg/l; benzene 0.05 mg/l; Hg 0.3 ug/l; temperature 40 C; dry-weather flow 12,800 m3/h, 307,200 m3/d. W2 (SEPS 2, SEPS 3, Quay Cottage): HOI 2.5 mg/l; NH4-N 3 mg/l; phenols 0.5 mg/l; TOC 30 mg/l; COD 261 mg/l (derogation from BAT-AEL 30-125 mg/l); TSS 25 mg/l; temperature 40 C; dry-weather flow 9,500 m3/h, 228,000 m3/d. W3: phenols 0.5 mg/l; TOC 20 mg/l; COD by TOC x3; temperature 40 C; flow 350 m3/h, 8,400 m3/d. Metals (Cu, Zn, Ni, Pb, Cd, Hg) limits at ug/l level.
- Sources
- assets.publishing.service.gov.uk exxonmobil-fawley.co.uk waterprojectsonline.com assets.publishing.service.gov.uk
Known issues
- COD at W2 above BAT-AEL: derogation to 261 mg/l; EA accepted that a BiOx plant costs more than its benefit; TOC review plan IC40 (2018)
- Mercury at Outfall 1 needs detailed modelling and possible mitigation (IC45, due 30 Sep 2020)
- AOX monitoring at Outfall 2 against the CWW BREF (IC46, due 31 Dec 2019)
- Eel screening at seawater intakes and outfalls (IC37, Eels Regulations 2009)
- Phenol at W1 reduced by reusing stripped sour water as desalter wash water (2010)
- HD10 adds cooling water below 1% of total seawater flow and sends wastewater to the existing SWS (2019)
- Outcome of IC40/IC45/IC46 and any later permit variations (after V008) not found in public sources
Site, ownership & capacity
- Owners
Name Share pct Source Exxon Mobil Corporation (via wholly owned Esso Petroleum Company, Limited) 100 en.wikipedia.org - Country
- United Kingdom (England)
- Region
- Hampshire (New Forest District)
- Town
- Fawley, Southampton SO45 1TX (Marsh Lane); approx. 7.5 km south-east of Southampton
- Lat
- 50.8331
- Lon
- -1.365
- Coastal
- Yes
- Water body
- Southampton Water (Solent estuary); site bounded east and north-east by mudflats, saltmarsh and Southampton Water
- Not public
- Site ground/platform elevation (m AOD) not public; would be answered by an Ordnance Survey level survey or the site flood risk assessment.
- Notes
- Lat/lon converted from Wikipedia 50deg49'59"N 1deg21'54"W. Installation area 613 ha, NGR SU 455043 (EA permit); operator states 3,250 acres.
- Sources
- en.wikipedia.org assets.publishing.service.gov.uk corporate.exxonmobil.com
Capacity
- Crude bpd
- 270,000
- Crude bpd notes
- Sources disagree: 270,000 b/d (Wikipedia; Reuters via Inspectioneering 2022; OGJ 2021; Bloomberg via Energy Voice 2024); OGJ 2024 gives 262,000 b/sd (246,900 b/cd); the 2011 Esso brochure and Solent Forum give up to 330,000 b/d (15 Mt/y). EA permit limits the two crude distillation units at PS1 3,600 kt/y and PS3 8,600 kt/y (12,200 kt/y combined). 270,000 b/d taken as the current nameplate figure.
- Crude distillation permit limit kt per y
- 12,200
- Not public
- Nelson complexity index not published; would be answered by the OGJ Worldwide Refining Survey unit capacities (paywalled) or an operator disclosure.
- Sources
- en.wikipedia.org ogj.com exxonmobil-fawley.co.uk solentforum.org assets.publishing.service.gov.uk
Process units
| Unit | Capacity | Source | Not public | Year | Licensor |
|---|---|---|---|---|---|
| CDU | Pipestill PS1: 3,600 kt/y annual throughput (permit limit); combined with vacuum unit PV1 (LCP 150) | assets.publishing.service.gov.uk | |||
| CDU | Pipestill PS3: 8,600 kt/y annual throughput (permit limit); combined with vacuum unit PV3 (LCP 151) | assets.publishing.service.gov.uk | |||
| CDU | Wikipedia lists 3 atmospheric distillation units; a PS2 emission point appears in the permit air tables. Current status of the third unit not confirmed. | en.wikipedia.org | Status and capacity of PS2 not public in fetched sources. | ||
| VDU | PV1 and PV3 in current permit; Wikipedia: 3 vacuum distillation units, 1 shut in 2012 | en.wikipedia.org | 2012 | ||
| FCC | FCCU (emission point A22); multistage cyclones on regenerator flue gas, DeSOx catalyst additive; dust derogation to 130 mg/Nm3 against BAT-AEL 10-50 mg/Nm3 | assets.publishing.service.gov.uk | |||
| reformer | Two Powerformers (PH1 LCP 147, PH2 LCP 148, plus PH1-F4); also supply refinery hydrogen | assets.publishing.service.gov.uk | ExxonMobil (Powerforming is an Exxon process name) | ||
| HDS/HDT | Hydrotreatment units named in permit: SCAN, HD3, HD4, HD5, HD6, HD7, HD8, RESID (residfiner), ENSR (lubes hydrofiner, LCP 145). Wikipedia: 6 hydrofiners, 1 added 2013. | assets.publishing.service.gov.uk | 2013 | ||
| HDS/HDT | Residfiner: fourth reactor added and hot coker feed export enabled (variation V006, issued 18 Jul 2018) | assets.publishing.service.gov.uk | 2018 | ||
| HDS/HDT | HD10 high-pressure diesel hydrofiner (Block 36B), about 570 million US gal/y ULSD; inferred approx. 37,000 b/d (570e6 / 42 / 365, basis: inferred). Feed: three gas oil streams from distillation plus one from FCC; 12 MWth furnace (A32). Part of 'FAST' project, first diesel Q1 2025, full production 2025. | assets.publishing.service.gov.uk | Licensor not public. | 2025 | |
| HDS/HDT | HD7 jet hydrofiner: new larger reactor replacing existing low-sulphur reactor (Block 7); throughput unchanged, lower product sulphur | assets.publishing.service.gov.uk | Commissioning year of HD7 reactor replacement not confirmed (permitted March 2019). | ||
| isomerisation | ISOM light naphtha isomeriser; WISR wax isomeriser (lubes) | assets.publishing.service.gov.uk | |||
| fractionation | LESR light ends unit; LPG odorising (C3/C4 stenching) | assets.publishing.service.gov.uk | |||
| SRU | Claus SRU trains SU3 and SU4, tail-gas unit, tail-gas incinerator, sulphur storage for export | assets.publishing.service.gov.uk | |||
| amine | Amine systems and amine recovery unit | assets.publishing.service.gov.uk | |||
| sour water stripper | Sour water stripper units; stripped water reused as desalter wash water (V002, 2010); spare capacity confirmed for HD10 load (2019) | assets.publishing.service.gov.uk | 2010 | ||
| hydrogen plant | New steam methane reformer, +55 MMscfd hydrogen; ZnO desulphurisation, PSA purification, 130 MWth furnace (A31), 50 m stack. Previously no hydrogen import: H2 came from the 2 Powerformers and a plant on the adjacent chemical plant. | ogj.com | Licensor not public. | 2025 | |
| GTG | SP4 Unit 3 GTG/WHB 196 MWth (LCP 146); Unit 5 Cogen GTG/WHB 451 MWth (LCP 144), up to 230 t/h steam, net power exporter; plus 2 x 400 MWth boilers (SP4 Units 1 and 2, combined <500 MW by interlock) | assets.publishing.service.gov.uk | |||
| other | Lubricating oil complex; polymerisation plant; bitumen plant (shut 2009) | en.wikipedia.org | 2009 | ||
| alkylation | assets.publishing.service.gov.uk | No alkylation unit named in the permit or Wikipedia unit list; presence not confirmed. |
Known equipment
| Item | Detail | Source |
|---|---|---|
| desalter | Crude desalters with a wash water tank; sour water stripper effluent reused as desalter wash water to reduce phenol to outfall W1 (variation V002, 24 Aug 2010). Number, size, transformer rating not public. | assets.publishing.service.gov.uk |
| WWTP unit | Oil separators (SEPS 1, SEPS 2, SEPS 3 and Quay Cottage effluent treatment), dual media filtration, dissolved air flotation, clarifiers (sedimentation), general filtration, reverse osmosis plant, sludge tanker loading. Clean and dirty waters treated separately. No biological oxidation (BiOx) plant: EA accepted that a BiOx plant cost more than its benefit (BAT 12 derogation); gas stripper reconfiguration adopted instead to treat high-TOC streams. | assets.publishing.service.gov.uk |
| WWTP unit | Spent caustic collection and neutralisation (changed from batch to continuous, V002 2010); ballast water receipt and oil recovery treatment | assets.publishing.service.gov.uk |
| WWTP unit | Raw water treatment for steam raising; export of demineralised water to the refinery | assets.publishing.service.gov.uk |
| exchanger | Once-through seawater cooling: up to 1.8 million tonnes/day of seawater drawn from Southampton Water, mostly for cooling. Intakes and outfalls subject to eel screening review (IC37, Eels (England and Wales) Regulations 2009). | exxonmobil-fawley.co.uk |
| flare | Sour and sweet gas flares (emission points A24-A27), hydrocarbon gas recovery compressor, knock-out pots; flaring reduction study IC43 (due 31 Mar 2020) | assets.publishing.service.gov.uk |
| column | A large steel tower on an LPG duty partly collapsed on 8 Nov 2022 from corrosion known since 2010; about 2,400 kg LPG released over 33 hours | press.hse.gov.uk |
| separator | Marine terminal: about 1.5 km (1 mile) long, 9 berths (5 ocean-going 10.2-14.9 m depth, 4 coastal), VLCC up to 244,000 t, about 2,000 ship movements/year, 22 Mt/y; crude tanks about 21,000 m3 each | en.wikipedia.org |
Feed
- Crude slate
- North Sea
- West Africa
- South America
- Russia (as of 2011; likely stopped after the 2022-23 UK import bans, not confirmed for Fawley)
- Over 20 crude grades a year (2011)
- Gas composition
- Mercury
- Mercury is a parameter at outfall W1 (0.3 ug/l and 0.001 mg/l limits); further mercury assessment required (IC45)
- Not public
- Current crude slate, API, sulphur, TAN and salt content not public; would be answered by the operator's crude assay list or tanker-tracking data (Kpler/Vortexa). The permit monitors average FCCU feed sulphur yearly but does not publish it.
- Sources
- exxonmobil-fawley.co.uk
Chemistry & corrosion risks
- chloride/overhead corrosion: crude desalting with stripped sour water as wash water; many different crudes (over 20 grades a year in 2011) changes the salt load (inferred from permit and brochure)
- H2S/SSC: hydrotreating (HD3-HD10, residfiner), amine, SWS and 2 Claus SRU trains
- amine degradation: amine systems and amine recovery unit on site
- external/atmospheric corrosion in a marine environment: 2008 fatal corroded pipe; 2022 LPG tower partial collapse from corrosion known since 2010
- mercury: outfall W1 mercury flagged for further assessment (IC45)
- fouling: once-through estuarine seawater cooling (biofouling on intakes and exchangers, inferred); FCC catalyst fines
- biocide/consent conflict: seawater cooling returns to a SPA/SAC/SSSI with metals limits at ug/l level; the biocide regime is not public (inferred risk)
- emulsions: effluent includes ballast water and spent caustic neutralisation; COD/TOC loads are high (W2 COD derogation 261 mg/l)
- naphthenic acid corrosion: not assessed; crude TAN not public
Site conditions
- Climate
- Temperate oceanic. Southampton (Mayflower Park) 1991-2020: July mean max 22.6 C, February mean min 3.0 C, annual precipitation 818.6 mm; record high 35.6 C (June), record low -16.6 C (January).
- Ambient max c
- 35.6
- Not public (seismic)
- No site seismic data fetched; UK seismicity is generally low, but confirm the design basis from the site or BGS hazard maps before structural design.
- Not public (ground)
- Ground investigation not public. The site is bounded by estuarine mudflats and saltmarsh (EA permit), so soft alluvial ground is likely near the shoreline (inferred). Historical contamination is confirmed: Biogenie Site Remediation operates a remediation, treatment and biopile facility (EPR/ZP3133RH) inside the refinery boundary.
- Flood or coastal risk
- Tidal. EA Southampton Water flood alerts (Feb and Apr 2024) list 'outbuildings at Fawley Refinery' as at risk; Ashlett Creek (Fawley) floods at high tide. The adjacent Fawley Waterside (former power station) site is 68% Flood Zone 1, 4% FZ2, 9% FZ3a and 19% FZ3b (JBA/NFNPA SFRA via WSP 2018). Refinery platform level not public.
- Hazardous area regime
- ATEX
- Hazardous area notes
- GB: DSEAR 2002 zoning, with equipment to UKEX (UKCA Ex) or ATEX. Site is a COMAH establishment (the 2015 LPG release was prosecuted under COMAH 2015). Upper tier status is inferred and not confirmed. Zone drawings not public.
- Environmental designations
- Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Hythe to Calshot Marshes SSSI (saltmarsh bordering the site), River Itchen SAC, Portsmouth Harbour SPA
- Sources
- en.wikipedia.org floodassist.co.uk newforestnpa.gov.uk assets.publishing.service.gov.uk assets.publishing.service.gov.uk assets.publishing.service.gov.uk advertiserandtimes.co.uk
History
| Year | Event | Detail | Source |
|---|---|---|---|
| 1921 | commissioning | First refinery built by Atlantic, Gulf and West Indies Oil Company (AGWI) on 270 ha | en.wikipedia.org |
| 1925 | ownership change | Taken over by Anglo-American Oil Company (Esso affiliate); British-Mexican Petroleum had acquired it in 1923 | en.wikipedia.org |
| 1935 | incident | Major oil tank fire lasting several days | en.wikipedia.org |
| 1939 | outage | About 12,000 b/d before WWII; refining stopped during the war and the site was used for storage | en.wikipedia.org |
| 1951 | expansion | New Esso refinery opened by PM Clement Attlee on 14 Sep 1951, about 157,000 b/d; 1,200 ha added from 1949 | en.wikipedia.org |
| 1958 | expansion | Chemical plant created | en.wikipedia.org |
| 1969 | incident | Major refinery fire | en.wikipedia.org |
| 1973 | expansion | Peak capacity about 400,000 b/d (19.5 Mt/y) | en.wikipedia.org |
| 1992 | upgrade | Refining and combustion authorised under IPC from 1992; EPR permit BR6996IC applied for 2006 | assets.publishing.service.gov.uk |
| 2007 | incident | July 2007 steam plant fire; partial shutdown | en.wikipedia.org |
| 2008 | incident | Sailor killed by a corroded pipe failure; GBP 100,000 fine | en.wikipedia.org |
| 2009 | closure | Bitumen plant shut | en.wikipedia.org |
| 2010 | incident | June 2010: about 20 bbl vacuum gas oil spilled; GBP 10,000 fine | en.wikipedia.org |
| 2010 | upgrade | Permit V002 (24 Aug 2010): ENSR lubes hydrofiner recommissioned; spent caustic neutralisation made continuous; SWS effluent reused as desalter wash water to cut phenol at W1 | assets.publishing.service.gov.uk |
| 2011 | incident | Fatal worker accident | en.wikipedia.org |
| 2012 | closure | One of three vacuum distillation units shut | en.wikipedia.org |
| 2013 | upgrade | One hydrofiner added; chemical plant steam cracker shut and dismantled; New Forest AQMA for SO2 revoked | en.wikipedia.org |
| 2015 | incident | 15 Nov 2015: 15-21 t LPG released over about 5 h at a valve near the road tanker roadway after a relief valve procedure change; COMAH 2015 guilty plea, GBP 500,000 fine (14 Dec 2021) | advertiserandtimes.co.uk |
| 2017 | upgrade | Permit V005 (effective 1 Apr 2017): IED Large Combustion Plant ELVs; Cogen CHP consolidated into the permit | assets.publishing.service.gov.uk |
| 2018 | expansion | Permit V006 (18 Jul 2018): fourth residfiner reactor and hot coker feed export. V007: permit review against Refining BAT; derogations for COD (BAT 12), FCC dust (BAT 25), marine loading VOC (BAT 52) | assets.publishing.service.gov.uk |
| 2019 | upgrade | Permit V008 (4 Mar 2019): new SMR hydrogen plant, HD10 diesel hydrofiner and HD7 jet reactor replacement authorised | assets.publishing.service.gov.uk |
| 2021 | outage | Planned maintenance from 27 Feb 2021, about 3 weeks, on part of the process units | ogj.com |
| 2022 | upgrade | March 2022: PM/EPC consortium Kent, Taylor Woodrow (VINCI) and BGEN appointed for the HD10 and hydrogen plant project | ogj.com |
| 2022 | incident | 8 Nov 2022: steel tower partly collapsed from long-standing corrosion; about 2,400 kg LPG released over 33 h; unit isolated, flaring. HSWA s3(1) guilty plea, GBP 1m fine plus GBP 12,277 costs, Southampton Magistrates, 12 Jun 2026 | press.hse.gov.uk |
| 2023 | expansion | Nov 2023: main construction of the GBP 800m+ ($1bn) low-sulphur diesel project confirmed: +40% ULSD, about a quarter less UK diesel import; GBP 6m DfT funding for SAF feasibility study | corporate.exxonmobil.com |
| 2025 | expansion | HD10 and new hydrogen plant: bulk of new diesel supply in Q1 2025, full production 2025. The jet pipeline expansion to the West London terminal near Heathrow was already complete by Apr 2024. | energyvoice.com |
Performance
- Throughput recent
- About 270,000 b/d quoted in 2024 (Bloomberg via Energy Voice); 22 Mt/y crude and products over the marine terminal
- Notes
- Refinery-level utilisation not published; DESNZ publishes UK totals only. Distribution: about 70% by pipeline (80% per 2011 brochure), 25% by sea, 5% rail/road; jet fuel piped to Heathrow and Gatwick. Refinery is a net power exporter (Cogen). About 2,500 staff and contractors.
- Not public
- Actual 2024-2026 crude runs and utilisation; would be answered by operator disclosure or paid data (Wood Mackenzie, Kpler).
- Sources
- energyvoice.com
Projects
| Project | Status | Epc or licensor | Year | Source |
|---|---|---|---|---|
| FAST: HD10 high-pressure diesel hydrotreater (about 570 M gal/y) + 55 MMscfd SMR hydrogen plant, GBP 800m+ | Started up; first diesel Q1 2025, full production 2025. Post-start-up performance not published. | Kent PLC, Taylor Woodrow (VINCI Construction UK), BGEN Ltd consortium (PM, engineering, procurement, module fabrication, logistics, completions, commissioning) | 2025 | ogj.com |
| HD10 reconfiguration option to conventional jet or HEFA SAF from vegetable oils | Option stated by plant head (2024) | energyvoice.com | ||
| Solent SAF plant: gasification of refuse-derived fuel to methanol, then ExxonMobil Methanol-to-Jet; 179,000 t/y SAF | Feasibility (GBP 6m DfT Advanced Fuels Fund, Nov 2023); target 2030 operation if approved | ExxonMobil MtJ (proprietary) | 2030 | corporate.exxonmobil.com |
| Solent Cluster CCS / hydrogen hub: capture at Fawley with offshore storage (English Channel Carbon Storage); region emits about 3.2 Mt/y CO2 from energy-intensive industry | Concept / consortium (founded 2022); no FID found | issuu.com |
Sources & confidence
High for permit data (EA documents, but the latest consolidated permit fetched is V007 2018 plus V008 2019; later variations were not retrieved). Medium for capacity (sources conflict: 262k-330k b/d). Low for crude slate (2011 brochure only). Solent Cluster emissions figure is taken from a search summary of a University of Southampton magazine and was not fetched directly.
This profile is compiled from public documents only. Figures are quoted as published, and any inferred value is labelled as inferred. If you can correct or add to it, please contact us.
- https://en.wikipedia.org/wiki/Fawley_Refinery
- https://assets.publishing.service.gov.uk/media/5bacbcdbed915d25b12500a4/Variation_Notice_BR6996IC_V007.pdf
- https://assets.publishing.service.gov.uk/media/5c7d56eaed915d4063af98e9/Decision_document.pdf
- https://assets.publishing.service.gov.uk/media/5a80f07840f0b62305b8e015/Application_New_Bespoke_-_Decision_Document__pdf_.pdf
- https://corporate.exxonmobil.com/locations/united-kingdom/uk-newsroom/20231128_exxonmobil-fawley-investment-will-strengthen-britains-energy-security
- https://corporate.exxonmobil.com/locations/united-kingdom/fawley
- https://corporate.exxonmobil.com/locations/united-kingdom/uk-newsroom/20231117_solent-cluster-wins-6-million-in-uk-government-funding-for-fawley-saf-feasibility-study
- https://www.ogj.com/refining-processing/refining/capacities/article/55017953/exxonmobils-fawley-refining-complex-adding-new-production-units-capacities
- https://www.ogj.com/refining-processing/refining/optimization/article/14199159/planned-maintenance-under-way-at-exxonmobils-uk-refinery
- https://www.energyvoice.com/oilandgas/petroleum-refining/551428/exxon-on-track-with-uk-refinery-expansion-just-as-others-shut-capacity/
- https://www.exxonmobil-fawley.co.uk/wp-content/uploads/2018/09/Fawley_Refinery.pdf
- https://www.exxonmobil-fawley.co.uk/epub2/files/basic-html/page10.html
- https://www.solentforum.org/solent/our_economy_and_industries/petrochemical_industry/
- https://waterprojectsonline.com/wp-content/uploads/case_studies/2003/Testwood-WTW-2003.pdf
- https://press.hse.gov.uk/2026/06/15/esso-fined-1-million-after-major-gas-leak-at-fawley-refinery/
- https://inspectioneering.com/news/2022-11-09/10355/exxonmobil-shuts-unit-at-britains-fawley-oil-refinery
- https://www.advertiserandtimes.co.uk/news/500-000-fine-over-hazardous-gas-leak-at-fawley-refinery-9230491/
- https://en.wikipedia.org/wiki/Southampton
- https://floodassist.co.uk/flood-warnings/flood-area-info/hampshire/065wac151/southampton-water-and-hamble
- https://www.newforestnpa.gov.uk/wp-content/uploads/2018/07/Fawley-Waterside-Sequential-test.pdf
- https://issuu.com/university_of_southampton/docs/reaction_magazine_spring_2023_issuu/s/21784876