Storm overflow register · Dwr Cymru Welsh Water

Tattenhall sewage works: storm overflow spills 2025

Tattenhall sewage treatment works, run by Dwr Cymru Welsh Water, has 1 monitored storm overflow discharging to Golborne Brook. In 2025 it recorded 66 spills totalling 336 hours, against 97 spills and 758 hours in 2024. By hours spilling, it ranks 10 of 26 Dwr Cymru Welsh Water works, where 1 spilled longest.

Works size: 2,290 population equivalent (TATTENHALL WWTW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCSO at Tattenhall STW1 Jan 2025 05:30 GMT, 11 h1 Jan 2025 16:45 GMT, 90 min1 Jan 2025 18:30 GMT, 3 h1 Jan 2025 21:45 GMT, 45 min5 Jan 2025 05:15 GMT, 79.3 h8 Jan 2025 12:45 GMT, 105 min8 Jan 2025 14:45 GMT, 30 min8 Jan 2025 15:30 GMT, 15 min8 Jan 2025 16:00 GMT, 30 min8 Jan 2025 16:45 GMT, 15 min8 Jan 2025 17:15 GMT, 15 min8 Jan 2025 18:00 GMT, 15 min8 Jan 2025 18:30 GMT, 15 min8 Jan 2025 19:15 GMT, 15 min8 Jan 2025 20:15 GMT, 30 min20 Jan 2025 21:45 GMT, 75 min23 Jan 2025 12:15 GMT, 2 h24 Jan 2025 02:00 GMT, 13.3 h24 Jan 2025 15:30 GMT, 105 min24 Jan 2025 18:00 GMT, 15 min24 Jan 2025 18:45 GMT, 15 min26 Jan 2025 23:45 GMT, 13.8 h27 Jan 2025 14:15 GMT, 45 min27 Jan 2025 15:15 GMT, 15 min27 Jan 2025 16:30 GMT, 30 min27 Jan 2025 17:30 GMT, 30 min27 Jan 2025 18:15 GMT, 30 min27 Jan 2025 19:00 GMT, 30 min27 Jan 2025 19:45 GMT, 15 min27 Jan 2025 20:15 GMT, 15 min27 Jan 2025 20:45 GMT, 15 min27 Jan 2025 21:15 GMT, 15 min23 Feb 2025 20:00 GMT, 45 min26 Feb 2025 07:00 GMT, 45 min12 Mar 2025 09:15 GMT, 15 min21 Apr 2025 16:00 GMT, 30 min21 Apr 2025 17:30 GMT, 45 min23 Apr 2025 00:15 GMT, 3.5 h24 May 2025 00:30 GMT, 45 min24 May 2025 17:30 GMT, 60 min27 May 2025 11:45 GMT, 105 min27 May 2025 15:45 GMT, 15 min28 May 2025 01:15 GMT, 60 min28 May 2025 04:15 GMT, 4 h29 May 2025 01:00 GMT, 45 min29 May 2025 02:00 GMT, 75 min30 May 2025 13:30 GMT, 15 min3 Jun 2025 06:00 GMT, 90 min5 Jun 2025 06:45 GMT, 30 min5 Jun 2025 08:45 GMT, 30 min5 Jun 2025 12:15 GMT, 90 min6 Jun 2025 04:00 GMT, 15 min13 Jun 2025 22:45 GMT, 15 min13 Jun 2025 23:30 GMT, 90 min14 Jun 2025 06:45 GMT, 30 min6 Jul 2025 04:45 GMT, 2.3 h21 Jul 2025 00:45 GMT, 2.8 h24 Jul 2025 01:45 GMT, 15 min7 Aug 2025 12:15 GMT, 30 min28 Aug 2025 14:00 GMT, 30 min7 Sep 2025 11:30 GMT, 2.3 h14 Sep 2025 14:45 GMT, 60 min17 Sep 2025 04:30 GMT, 45 min17 Sep 2025 06:00 GMT, 4 h20 Sep 2025 13:00 GMT, 14.5 h28 Sep 2025 02:00 GMT, 30 min3 Oct 2025 14:45 GMT, 15 min4 Oct 2025 10:30 GMT, 15 min19 Oct 2025 14:45 GMT, 45 min5 Nov 2025 04:15 GMT, 30 min11 Nov 2025 19:30 GMT, 2.8 h12 Nov 2025 15:30 GMT, 45 min14 Nov 2025 08:15 GMT, 29.3 h18 Nov 2025 20:00 GMT, 6.3 h19 Nov 2025 04:00 GMT, 5.8 h19 Nov 2025 10:30 GMT, 75 min22 Nov 2025 03:45 GMT, 45 min22 Nov 2025 10:15 GMT, 15 min23 Nov 2025 04:30 GMT, 15 min28 Nov 2025 12:45 GMT, 30 min29 Nov 2025 03:30 GMT, 45 min29 Nov 2025 05:00 GMT, 105 min29 Nov 2025 07:15 GMT, 15 min1 Dec 2025 19:00 GMT, 75 min4 Dec 2025 08:30 GMT, 90 min4 Dec 2025 10:15 GMT, 15 min4 Dec 2025 10:45 GMT, 45 min4 Dec 2025 11:45 GMT, 5.3 h4 Dec 2025 17:45 GMT, 15 min5 Dec 2025 15:45 GMT, 3.3 h5 Dec 2025 19:45 GMT, 60 min5 Dec 2025 21:30 GMT, 15 min5 Dec 2025 22:15 GMT, 15 min5 Dec 2025 23:30 GMT, 15 min8 Dec 2025 15:30 GMT, 45 min9 Dec 2025 03:30 GMT, 18.5 h9 Dec 2025 22:15 GMT, 45 min9 Dec 2025 23:15 GMT, 30 min10 Dec 2025 07:45 GMT, 15 min12 Dec 2025 06:00 GMT, 60 min12 Dec 2025 09:30 GMT, 30 min15 Dec 2025 05:45 GMT, 25 h16 Dec 2025 07:00 GMT, 30 min16 Dec 2025 07:45 GMT, 60 min16 Dec 2025 09:15 GMT, 30 min16 Dec 2025 10:00 GMT, 60 min17 Dec 2025 08:00 GMT, 3.5 h17 Dec 2025 11:45 GMT, 75 min17 Dec 2025 13:15 GMT, 30 min17 Dec 2025 14:15 GMT, 15 min17 Dec 2025 14:45 GMT, 15 min17 Dec 2025 15:30 GMT, 15 min17 Dec 2025 16:00 GMT, 15 min17 Dec 2025 16:30 GMT, 15 min17 Dec 2025 17:15 GMT, 15 min17 Dec 2025 19:00 GMT, 15 min17 Dec 2025 19:45 GMT, 11.8 h18 Dec 2025 08:00 GMT, 75 min18 Dec 2025 09:30 GMT, 15 min18 Dec 2025 10:00 GMT, 60 min18 Dec 2025 11:30 GMT, 15 min18 Dec 2025 12:00 GMT, 15 min18 Dec 2025 13:00 GMT, 15 min18 Dec 2025 14:15 GMT, 2 h18 Dec 2025 16:30 GMT, 45 min18 Dec 2025 17:30 GMT, 30 min18 Dec 2025 18:15 GMT, 15 min18 Dec 2025 19:00 GMT, 60 min18 Dec 2025 20:15 GMT, 75 min18 Dec 2025 22:45 GMT, 30 min19 Dec 2025 00:15 GMT, 15 min22 Dec 2025 00:00 GMT, 15 min22 Dec 2025 01:45 GMT, 15 min22 Dec 2025 02:15 GMT, 15 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

05,00010k15kJan 2025: 137 h spilling ≈ 5,368 m³ (range 2,138–13,476 m³)JanFeb 2025: 1.5 h spilling ≈ 59 m³ (range 23–148 m³)FebMar 2025: 0.2 h spilling ≈ 7.8 m³ (range 3.1–20 m³)MarApr 2025: 4.8 h spilling ≈ 188 m³ (range 75–473 m³)AprMay 2025: 11 h spilling ≈ 432 m³ (range 172–1,084 m³)MayJun 2025: 6.5 h spilling ≈ 255 m³ (range 102–640 m³)JunJul 2025: 5.2 h spilling ≈ 204 m³ (range 81–512 m³)JulAug 2025: 1.0 h spilling ≈ 39 m³ (range 16–99 m³)AugSep 2025: 23 h spilling ≈ 902 m³ (range 359–2,266 m³)SepOct 2025: 1.2 h spilling ≈ 47 m³ (range 19–118 m³)OctNov 2025: 51 h spilling ≈ 2,001 m³ (range 797–5,024 m³)NovDec 2025: 94 h spilling ≈ 3,681 m³ (range 1,466–9,240 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 05:15CSO at Tattenhall STW3.3 days1,239 – 7,807 m³
14 Nov 2025, 08:15CSO at Tattenhall STW1.2 days457 – 2,881 m³
15 Dec 2025, 05:45CSO at Tattenhall STW1.0 days391 – 2,463 m³
9 Dec 2025, 03:30CSO at Tattenhall STW18.5 h289 – 1,822 m³
20 Sep 2025, 13:00CSO at Tattenhall STW14.5 h227 – 1,428 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate13,184 m³range 5,251 – 33,099 m³
In litres13.2 millionrange 5.3 million – 33.1 million L
Olympic swimming pools5.3at 2,500 m³ each
Organic load, as people's raw sewage19,776person-days of untreated BOD

Assumed spill rate while spilling: 4.3 – 27.4 L/s (central 10.9 L/s), from a dry-weather flow of 4.3 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 210 kg1,187 kg6,620 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 551 kg5,603 kg23,864 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 10.0 kg83 kg308 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 6.3 kg34 kg179 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 525.1 billion organisms13.2 trillion organisms331.0 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

CSO at Tattenhall STW

Inlet overflow at sewage works · discharges to Golborne Brook

Spills 2025
66 (336 hours) · down 32% on 2024
Spills 2024
97 (758 hours)
Long-term average
80.7 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Aldford Brook (GB111067052120)
Outlet location
SJ4789059190 (OS grid reference) · View on Apple Maps
EA ID / permit
DCW00037 · CM0105502 · company name: Tattenhall

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Dwr Cymru Welsh Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.