Storm overflow register · Dwr Cymru Welsh Water

Weobley sewage works: storm overflow spills 2025

Weobley sewage treatment works, run by Dwr Cymru Welsh Water, has 1 monitored storm overflow discharging to Newbridge Brook. In 2025 it recorded 62 spills totalling 517 hours, against 108 spills and 70 hours in 2024. By hours spilling, it ranks 6 of 26 Dwr Cymru Welsh Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWeobley Wastewater…3 spills, 1.8 h, 1 Jan to 1 Jan8 spills, 140.3 h, 5 Jan to 11 Jan2 spills, 17.5 h, 23 Jan to 24 Jan6 spills, 209.3 h, 26 Jan to 4 Feb9 Feb 2025 11:30 GMT, 2.3 h2 spills, 0.8 h, 15 Feb to 15 Feb6 spills, 7.5 h, 23 Feb to 24 Feb2 spills, 0.8 h, 26 Feb to 26 Feb21 Mar 2025 10:15 GMT, 15 min3 spills, 0.8 h, 22 Mar to 23 Mar22 Apr 2025 23:30 GMT, 11.3 h12 May 2025 15:30 GMT, 4.8 h3 Jun 2025 07:30 GMT, 75 min12 Jun 2025 13:30 GMT, 15 min7 Sep 2025 11:00 GMT, 30 min3 spills, 3.3 h, 14 Sep to 14 Sep2 spills, 0.8 h, 20 Sep to 20 Sep3 Oct 2025 14:00 GMT, 45 min2 spills, 1.5 h, 19 Oct to 19 Oct22 Oct 2025 22:15 GMT, 75 min24 Oct 2025 17:45 GMT, 15 min3 spills, 2.5 h, 30 Oct to 31 Oct2 spills, 1 h, 4 Nov to 4 Nov12 Nov 2025 09:15 GMT, 15 min16 spills, 42 h, 14 Nov to 16 Nov3 spills, 2.8 h, 29 Nov to 29 Nov1 Dec 2025 18:15 GMT, 15 min4 Dec 2025 08:15 GMT, 60 min19 spills, 8.5 h, 5 Dec to 7 Dec30 spills, 9.3 h, 9 Dec to 10 Dec4 spills, 1 h, 12 Dec to 12 Dec60 spills, 40.5 h, 15 Dec to 20 Dec4 spills, 1 h, 21 Dec to 22 Dec

Hours spilling by month, 2025

0100200300Jan 2025: 289 hours spillingJanFeb 2025: 91 hours spillingFebMar 2025: 1.0 hours spillingMarApr 2025: 11 hours spillingAprMay 2025: 4.8 hours spillingMayJun 2025: 1.5 hours spillingJunJul 2025: 0.0 hours spillingJulAug 2025: 0.0 hours spillingAugSep 2025: 4.5 hours spillingSepOct 2025: 6.2 hours spillingOctNov 2025: 46 hours spillingNovDec 2025: 62 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
26 Jan 2025, 11:30Weobley Wastewater Treatment Works4.0 days
5 Jan 2025, 15:00Weobley Wastewater Treatment Works3.9 days
31 Jan 2025, 13:15Weobley Wastewater Treatment Works1.9 days
9 Jan 2025, 13:15Weobley Wastewater Treatment Works1.9 days
14 Nov 2025, 08:30Weobley Wastewater Treatment Works1.4 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate8,855 m³range 3,527 - 22,231 m³
In litres8.9 millionrange 3.5 million - 22.2 million L
Olympic swimming pools3.5at 2,500 m³ each
Organic load, as people's raw sewage13,283person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 141 kg797 kg4,446 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 370 kg3,763 kg16,029 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 6.7 kg56 kg207 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 4.2 kg23 kg120 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 352.7 billion organisms8.9 trillion organisms222.3 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Weobley Wastewater Treatment Works

Storm tank at sewage works · discharges to Newbridge Brook

Spills 2025
62 (517 hours) · down 43% on 2024
Spills 2024
108 (70 hours)
Long-term average
56.5 spills a year (monitored since 2022)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Stretford Bk - source to conf R Arrow (GB109055036580)
Outlet location
SO3959552085 (OS grid reference) · View on Apple Maps
EA ID / permit
DCW00007 · AL1003501 · company name: Weobley

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Dwr Cymru Welsh Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.