Storm overflow register · South West Water

Bere Alston sewage works: storm overflow spills 2025

Bere Alston sewage treatment works, run by South West Water, has 2 monitored storm overflows discharging to Tidal River Tamar, (E)Tidal River Tamar. In 2025 they recorded 173 spills totalling 2,010 hours, against 263 spills and 3,170 hours in 2024. By hours spilling, it ranks 39 of 334 South West Water works, where 1 spilled longest.

Works size: 2,294 population equivalent (BERE ALSTON STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBere Alston STW2 spills, 0.4 h, 1 Jan to 1 Jan6 spills, 95.6 h, 4 Jan to 8 Jan5 spills, 6.2 h, 23 Jan to 24 Jan5 spills, 78 h, 26 Jan to 29 Jan31 Jan 2025 05:44 GMT, 14 min14 Feb 2025 08:38 GMT, 3 min16 spills, 6.5 h, 19 Feb to 21 Feb18 spills, 66 h, 23 Feb to 26 Feb21 Mar 2025 19:12 GMT, 27 min5 spills, 5.9 h, 15 Apr to 15 Apr12 spills, 13.1 h, 18 Apr to 19 Apr22 Apr 2025 19:03 GMT, 3.4 h3 Jun 2025 08:58 GMT, 11 min5 Jun 2025 08:17 GMT, 5 min8 spills, 3.9 h, 6 Jun to 7 Jun3 spills, 3.8 h, 12 Jun to 12 Jun3 spills, 2.9 h, 13 Jun to 13 Jun2 spills, 0.4 h, 19 Jul to 20 Jul2 spills, 2.7 h, 28 Aug to 28 Aug3 spills, 1.3 h, 30 Aug to 30 Aug5 spills, 1.1 h, 31 Aug to 1 Sep9 spills, 3.4 h, 2 Sep to 4 Sep4 spills, 1.5 h, 9 Sep to 10 Sep14 Sep 2025 11:31 GMT, 23 min17 Sep 2025 02:37 GMT, 11 min2 spills, 0.4 h, 20 Sep to 20 Sep2 spills, 0.2 h, 27 Sep to 27 Sep3 Oct 2025 20:25 GMT, 11 min8 spills, 4.5 h, 19 Oct to 20 Oct2 spills, 1 h, 22 Oct to 22 Oct30 Oct 2025 21:00 GMT, 17 min4 spills, 7.8 h, 4 Nov to 5 Nov7 Nov 2025 13:01 GMT, 55 min6 spills, 157.1 h, 9 Nov to 16 Nov3 spills, 12.6 h, 22 Nov to 23 Nov24 Nov 2025 09:55 GMT, 33.8 h2 spills, 19.7 h, 29 Nov to 30 Nov2 spills, 307.4 h, 30 Nov to 13 Dec3 spills, 187.9 h, 15 Dec to 23 DecBere Alston STW2 spills, 2.1 h, 1 Jan to 1 Jan14 spills, 127.3 h, 4 Jan to 10 Jan5 spills, 12.9 h, 23 Jan to 24 Jan9 spills, 95.5 h, 26 Jan to 31 Jan4 Feb 2025 11:56 GMT, 105 min14 Feb 2025 08:40 GMT, 11 min62 spills, 178.9 h, 19 Feb to 1 Mar21 Mar 2025 19:12 GMT, 10 min4 spills, 7.3 h, 15 Apr to 16 Apr5 spills, 36.8 h, 18 Apr to 20 Apr22 Apr 2025 18:59 GMT, 4.2 h7 Jun 2025 12:29 GMT, 2.3 h12 Jun 2025 09:16 GMT, 4.1 h5 spills, 6.5 h, 13 Jun to 13 Jun20 Jul 2025 00:17 GMT, 11 min2 spills, 1.3 h, 28 Aug to 29 Aug2 spills, 0.9 h, 30 Aug to 30 Aug1 Sep 2025 10:24 GMT, 5 min4 spills, 1.7 h, 3 Sep to 4 Sep7 spills, 4.1 h, 19 Oct to 20 Oct22 Oct 2025 16:49 GMT, 26 min23 Oct 2025 11:52 GMT, 19 min5 spills, 9.6 h, 4 Nov to 5 Nov6 spills, 121.4 h, 9 Nov to 15 Nov2 spills, 3.6 h, 22 Nov to 23 Nov5 spills, 45.9 h, 1 Dec to 4 Dec2 spills, 171.9 h, 5 Dec to 12 Dec3 spills, 137.7 h, 15 Dec to 21 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

025k50k75k100kJan 2025: 418 h spilling ≈ 16,438 m³ (range 6,548-41,268 m³)JanFeb 2025: 252 h spilling ≈ 9,889 m³ (range 3,939-24,828 m³)FebMar 2025: 2.4 h spilling ≈ 94 m³ (range 38-237 m³)MarApr 2025: 71 h spilling ≈ 2,775 m³ (range 1,105-6,967 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 24 h spilling ≈ 928 m³ (range 369-2,329 m³)JunJul 2025: 0.6 h spilling ≈ 24 m³ (range 9.4-59 m³)JulAug 2025: 6.4 h spilling ≈ 252 m³ (range 100-632 m³)AugSep 2025: 8.7 h spilling ≈ 342 m³ (range 136-859 m³)SepOct 2025: 11 h spilling ≈ 421 m³ (range 168-1,056 m³)OctNov 2025: 367 h spilling ≈ 14,425 m³ (range 5,746-36,216 m³)NovDec 2025: 850 h spilling ≈ 33,418 m³ (range 13,311-83,898 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
1 Dec 2025, 00:34Bere Alston STW12.8 days4,805 - 30,283 m³
15 Dec 2025, 01:48Bere Alston STW7.5 days2,836 - 17,876 m³
7 Dec 2025, 01:27Bere Alston STW5.7 days2,131 - 13,430 m³
15 Dec 2025, 03:29Bere Alston STW5.1 days1,903 - 11,996 m³
11 Nov 2025, 17:04Bere Alston STW4.1 days1,542 - 9,717 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate79,006 m³range 31,470 - 198,347 m³
In litres79.0 millionrange 31.5 million - 198.3 million L
Olympic swimming pools32at 2,500 m³ each
Organic load, as people's raw sewage118,509person-days of untreated BOD

Assumed spill rate while spilling: 4.3 - 27.4 L/s (central 10.9 L/s), from a dry-weather flow of 4.3 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,259 kg7,111 kg39,669 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 3,304 kg33,577 kg143,008 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 60 kg498 kg1,845 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 38 kg205 kg1,071 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 3.1 trillion organisms79.0 trillion organisms2.0 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Bere Alston STW

Inlet overflow at sewage works · discharges to Tidal River Tamar

Spills 2025
91 (1,031 hours) · down 32% on 2024
Spills 2024
134 (1,658 hours)
Long-term average
140.1 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Not part of a WFD catchment
Outlet location
SX42716630 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00099 · NRA-SW-3792 · company name: BERE ALSTON STW_SO_BERE ALSTON

Bere Alston STW

Storm tank at sewage works · discharges to (E)Tidal River Tamar

Spills 2025
82 (979 hours) · down 36% on 2024
Spills 2024
129 (1,512 hours)
Long-term average
149.1 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
UWWTR improvement completed, Operational improvement ongoing
WFD catchment
Not part of a WFD catchment
Outlet location
SX42716630 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00098 · NRA-SW-3791 · company name: BERE ALSTON STW_SSO_BERE ALSTON

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.