Storm overflow register · South West Water

Bratton Clovelly sewage works: storm overflow spills 2025

Bratton Clovelly sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to Trib of River Thrushel. In 2025 it recorded 104 spills totalling 574 hours, against 115 spills and 639 hours in 2024. By hours spilling, it ranks 161 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBratton Clovelly WwTW…3 spills, 3.2 h, 1 Jan to 1 Jan2 spills, 69 h, 4 Jan to 7 Jan4 spills, 6.2 h, 23 Jan to 24 Jan6 spills, 55.9 h, 26 Jan to 29 Jan31 Jan 2025 03:54 GMT, 90 min6 spills, 10 h, 19 Feb to 21 Feb23 Feb 2025 11:42 GMT, 27.9 h3 spills, 8.5 h, 26 Feb to 26 Feb28 Mar 2025 04:22 GMT, 6 min13 Apr 2025 05:28 GMT, 18 min8 spills, 15.1 h, 15 Apr to 16 Apr6 spills, 3.5 h, 18 Apr to 18 Apr2 spills, 0.9 h, 22 Apr to 22 Apr2 spills, 0.3 h, 11 May to 12 May2 spills, 0.7 h, 24 May to 24 May2 spills, 3.4 h, 27 May to 27 May6 Jun 2025 03:06 GMT, 44 min7 Jun 2025 11:16 GMT, 2.3 h3 spills, 4.8 h, 12 Jun to 12 Jun5 spills, 7.5 h, 13 Jun to 14 Jun14 Jul 2025 09:18 GMT, 8 min20 Jul 2025 00:21 GMT, 27 min4 Aug 2025 11:56 GMT, 62 min2 spills, 0.3 h, 7 Aug to 7 Aug14 Aug 2025 00:15 GMT, 7 min2 spills, 2.7 h, 28 Aug to 29 Aug2 spills, 0.3 h, 30 Aug to 31 Aug1 Sep 2025 12:17 GMT, 20 min7 spills, 4.3 h, 2 Sep to 4 Sep2 spills, 1 h, 7 Sep to 7 Sep2 spills, 0.8 h, 8 Sep to 8 Sep11 spills, 2.7 h, 9 Sep to 12 Sep7 spills, 3 h, 14 Sep to 15 Sep3 spills, 1.4 h, 20 Sep to 20 Sep27 Sep 2025 20:37 GMT, 6 min8 spills, 4.1 h, 2 Oct to 4 Oct14 spills, 11.3 h, 19 Oct to 21 Oct14 spills, 14.1 h, 22 Oct to 25 Oct26 Oct 2025 21:53 GMT, 10 min2 spills, 2.4 h, 29 Oct to 29 Oct2 spills, 1.8 h, 30 Oct to 31 Oct3 spills, 1.3 h, 2 Nov to 2 Nov4 Nov 2025 13:07 GMT, 22.8 h14 spills, 76 h, 9 Nov to 15 Nov18 Nov 2025 14:19 GMT, 17 min9 spills, 12.5 h, 22 Nov to 24 Nov5 spills, 10.6 h, 29 Nov to 29 Nov7 spills, 24.1 h, 1 Dec to 2 Dec5 spills, 2.5 h, 4 Dec to 4 Dec5 spills, 34.7 h, 5 Dec to 7 Dec2 spills, 37.6 h, 8 Dec to 10 Dec2 spills, 3.3 h, 12 Dec to 12 Dec15 Dec 2025 02:11 GMT, 33.5 h4 spills, 38.9 h, 17 Dec to 19 Dec3 spills, 2 h, 20 Dec to 21 Dec

Hours spilling by month, 2025

050100150200Jan 2025: 136 hours spillingJanFeb 2025: 46 hours spillingFebMar 2025: 0.1 hours spillingMarApr 2025: 20 hours spillingAprMay 2025: 4.4 hours spillingMayJun 2025: 15 hours spillingJunJul 2025: 0.6 hours spillingJulAug 2025: 4.4 hours spillingAugSep 2025: 14 hours spillingSepOct 2025: 34 hours spillingOctNov 2025: 124 hours spillingNovDec 2025: 177 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
4 Jan 2025, 20:01Bratton Clovelly WwTW CSO2.8 days
8 Dec 2025, 21:48Bratton Clovelly WwTW CSO1.5 days
17 Dec 2025, 17:55Bratton Clovelly WwTW CSO1.4 days
15 Dec 2025, 02:11Bratton Clovelly WwTW CSO1.4 days
23 Feb 2025, 11:42Bratton Clovelly WwTW CSO1.2 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate9,840 m³range 3,920 - 24,704 m³
In litres9.8 millionrange 3.9 million - 24.7 million L
Olympic swimming pools3.9at 2,500 m³ each
Organic load, as people's raw sewage14,760person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 157 kg886 kg4,941 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 412 kg4,182 kg17,812 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 7.4 kg62 kg230 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 4.7 kg26 kg133 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 392.0 billion organisms9.8 trillion organisms247.0 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Bratton Clovelly WwTW CSO

Inlet overflow at sewage works · discharges to Trib of River Thrushel

Spills 2025
104 (574 hours) · down 10% on 2024
Spills 2024
115 (639 hours)
Long-term average
110.8 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Thrushel (GB108047008010)
Outlet location
SX46749172 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00146 · NRA-SW-1061 · company name: BRATTON CLOVELLY STW_SO_BRATTON CLOVELY

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.