Storm overflow register · South West Water

Crockernwell sewage works: storm overflow spills 2025

Crockernwell sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to Scotley Brook(S). In 2025 it recorded 104 spills totalling 459 hours, against 84 spills and 260 hours in 2024. By hours spilling, it ranks 178 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCrockernwell Sewage…5 spills, 1 h, 1 Jan to 1 Jan10 spills, 73.8 h, 4 Jan to 8 Jan9 Jan 2025 11:18 GMT, 44 min2 spills, 0.2 h, 11 Jan to 11 Jan12 Jan 2025 09:58 GMT, 2 min4 spills, 6.9 h, 23 Jan to 24 Jan7 spills, 63.9 h, 26 Jan to 30 Jan11 spills, 2.9 h, 13 Feb to 15 Feb2 spills, 0.4 h, 16 Feb to 16 Feb15 spills, 12 h, 19 Feb to 21 Feb21 spills, 51.8 h, 23 Feb to 28 Feb28 Mar 2025 08:18 GMT, 5.9 h11 spills, 7.8 h, 15 Apr to 16 Apr14 spills, 35 h, 18 Apr to 20 Apr3 spills, 1.2 h, 22 Apr to 23 Apr2 spills, 0.4 h, 21 May to 21 May3 spills, 0.3 h, 27 May to 27 May3 Jun 2025 08:54 GMT, 18 min4 Jun 2025 12:52 GMT, 3 min7 spills, 2.6 h, 6 Jun to 7 Jun6 spills, 3.9 h, 12 Jun to 12 Jun11 spills, 18.8 h, 13 Jun to 14 Jun7 spills, 1.5 h, 19 Jul to 20 Jul19 Aug 2025 12:17 GMT, 17 min27 Aug 2025 08:39 GMT, 4 min4 spills, 2.8 h, 28 Aug to 29 Aug2 spills, 0.1 h, 31 Aug to 31 Aug11 spills, 2.1 h, 2 Sep to 4 Sep3 spills, 1.2 h, 9 Sep to 9 Sep11 Sep 2025 10:43 GMT, 5 min12 Sep 2025 11:24 GMT, 12 min7 spills, 1.1 h, 14 Sep to 15 Sep3 spills, 0.5 h, 20 Sep to 20 Sep2 spills, 0.2 h, 3 Oct to 4 Oct2 spills, 0.9 h, 19 Oct to 19 Oct3 spills, 0.5 h, 20 Oct to 20 Oct10 spills, 2.6 h, 22 Oct to 24 Oct9 spills, 1.9 h, 30 Oct to 31 Oct2 Nov 2025 10:49 GMT, 11 min7 spills, 1.1 h, 4 Nov to 5 Nov6 Nov 2025 10:17 GMT, 18 min7 Nov 2025 13:38 GMT, 18 min5 spills, 1.7 h, 9 Nov to 9 Nov9 spills, 8 h, 11 Nov to 12 Nov12 spills, 8.1 h, 13 Nov to 15 Nov18 Nov 2025 16:33 GMT, 5 min7 spills, 1.4 h, 23 Nov to 24 Nov5 spills, 0.9 h, 28 Nov to 29 Nov9 spills, 7 h, 1 Dec to 2 Dec5 spills, 1.4 h, 4 Dec to 4 Dec22 spills, 47.8 h, 5 Dec to 10 Dec6 spills, 1.2 h, 11 Dec to 12 Dec33 spills, 73.1 h, 15 Dec to 22 Dec23 Dec 2025 03:20 GMT, 37 min

Hours spilling by month, 2025

050100150Jan 2025: 146 hours spillingJanFeb 2025: 67 hours spillingFebMar 2025: 5.9 hours spillingMarApr 2025: 44 hours spillingAprMay 2025: 0.7 hours spillingMayJun 2025: 26 hours spillingJunJul 2025: 1.5 hours spillingJulAug 2025: 3.2 hours spillingAugSep 2025: 5.2 hours spillingSepOct 2025: 6.1 hours spillingOctNov 2025: 22 hours spillingNovDec 2025: 131 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
4 Jan 2025, 17:21Crockernwell Sewage Treatment Works3.0 days
26 Jan 2025, 12:46Crockernwell Sewage Treatment Works2.4 days
23 Feb 2025, 11:26Crockernwell Sewage Treatment Works1.7 days
8 Dec 2025, 22:02Crockernwell Sewage Treatment Works1.6 days
18 Dec 2025, 10:12Crockernwell Sewage Treatment Works1.2 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate7,861 m³range 3,131 - 19,736 m³
In litres7.9 millionrange 3.1 million - 19.7 million L
Olympic swimming pools3.1at 2,500 m³ each
Organic load, as people's raw sewage11,792person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 125 kg708 kg3,947 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 329 kg3,341 kg14,230 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 5.9 kg50 kg184 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 3.8 kg20 kg107 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 313.1 billion organisms7.9 trillion organisms197.4 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Crockernwell Sewage Treatment Works

Inlet overflow at sewage works · discharges to Scotley Brook(S)

Spills 2025
104 (459 hours) · up 24% on 2024
Spills 2024
84 (260 hours)
Long-term average
86.5 spills a year (monitored since 2022)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Scotley Brook (GB108046008600)
Outlet location
SX75579242 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00323 · 203889 · company name: CROCKERNWELL STW_SO_TEDBURN

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.