Horns Cross sewage works: storm overflow spills 2025

Horns Cross sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to Tributary of River Yeo. In 2025 it recorded 230 spills totalling 2,035 hours, against 229 spills and 1,603 hours in 2024. By hours spilling, it ranks 35 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecHorns Cross Sewage…78 spills, 133.8 h, 1 Jan to 18 Jan5 spills, 0.3 h, 19 Jan to 20 Jan92 spills, 175 h, 23 Jan to 11 Feb12 Feb 2025 07:56 GMT, 4 min4 spills, 0.6 h, 15 Feb to 15 Feb115 spills, 144.8 h, 18 Feb to 9 Mar15 spills, 0.9 h, 10 Mar to 12 Mar2 spills, 0.1 h, 13 Mar to 14 Mar17 Mar 2025 12:08 GMT, 3 min2 spills, 0.2 h, 18 Mar to 18 Mar20 Mar 2025 09:03 GMT, 7 min2 spills, 0.3 h, 25 Mar to 25 Mar2 spills, 0.6 h, 28 Mar to 28 Mar1 Apr 2025 09:05 GMT, 7 min45 spills, 133.8 h, 15 Apr to 23 Apr24 Apr 2025 14:46 GMT, 4 min10 spills, 5.9 h, 25 Apr to 26 Apr13 May 2025 08:29 GMT, 8 min20 May 2025 08:45 GMT, 5 min24 May 2025 07:19 GMT, 5 min7 spills, 6.4 h, 27 May to 28 May3 spills, 0.4 h, 1 Jun to 2 Jun8 spills, 3.8 h, 3 Jun to 3 Jun11 spills, 7.5 h, 5 Jun to 7 Jun4 spills, 8 h, 12 Jun to 12 Jun7 spills, 8.7 h, 13 Jun to 14 Jun24 Jun 2025 05:33 GMT, 12 min26 Jun 2025 06:05 GMT, 27 min30 Jun 2025 11:49 GMT, 4 min4 spills, 0.6 h, 5 Jul to 5 Jul3 spills, 1.8 h, 6 Jul to 6 Jul5 spills, 0.9 h, 7 Jul to 7 Jul8 Jul 2025 08:47 GMT, 6 min14 Jul 2025 04:27 GMT, 7 min4 spills, 0.5 h, 14 Jul to 15 Jul2 spills, 0.8 h, 20 Jul to 20 Jul3 spills, 1.3 h, 21 Jul to 21 Jul23 Jul 2025 08:38 GMT, 8 min26 Jul 2025 05:58 GMT, 7 min29 Jul 2025 08:57 GMT, 8 min4 spills, 2.5 h, 4 Aug to 4 Aug5 Aug 2025 08:53 GMT, 8 min12 Aug 2025 08:34 GMT, 10 min19 Aug 2025 08:42 GMT, 8 min21 Aug 2025 08:23 GMT, 8 min26 Aug 2025 09:08 GMT, 8 min6 spills, 1.9 h, 28 Aug to 29 Aug4 spills, 1.9 h, 30 Aug to 30 Aug9 spills, 3.3 h, 31 Aug to 2 Sep7 spills, 2.3 h, 3 Sep to 4 Sep5 Sep 2025 07:09 GMT, 27 min6 spills, 4 h, 7 Sep to 7 Sep36 spills, 10.7 h, 9 Sep to 13 Sep37 spills, 209.5 h, 14 Sep to 26 Sep3 spills, 1 h, 27 Sep to 27 Sep30 Sep 2025 08:18 GMT, 12 min19 spills, 11.8 h, 3 Oct to 4 Oct3 spills, 0.2 h, 5 Oct to 5 Oct6 Oct 2025 13:38 GMT, 3 min2 spills, 0.2 h, 7 Oct to 7 Oct3 spills, 2.1 h, 19 Oct to 19 Oct229 spills, 468.1 h, 20 Oct to 19 Nov8 spills, 0.7 h, 20 Nov to 21 Nov132 spills, 674.1 h, 22 Nov to 28 Dec4 spills, 0.3 h, 29 Dec to 29 Dec6 spills, 0.6 h, 30 Dec to 30 Dec

Hours spilling by month, 2025

0200400600800Jan 2025: 289 hours spillingJanFeb 2025: 160 hours spillingFebMar 2025: 8.0 hours spillingMarApr 2025: 140 hours spillingAprMay 2025: 6.6 hours spillingMayJun 2025: 29 hours spillingJunJul 2025: 6.4 hours spillingJulAug 2025: 7.3 hours spillingAugSep 2025: 231 hours spillingSepOct 2025: 137 hours spillingOctNov 2025: 421 hours spillingNovDec 2025: 600 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
12 Dec 2025, 19:40Horns Cross Sewage Treatment Works11.6 days
30 Nov 2025, 19:22Horns Cross Sewage Treatment Works8.7 days
12 Nov 2025, 12:54Horns Cross Sewage Treatment Works4.9 days
26 Jan 2025, 07:52Horns Cross Sewage Treatment Works4.5 days
1 Nov 2025, 12:35Horns Cross Sewage Treatment Works4.1 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate34,875 m³range 13,892 - 87,556 m³
In litres34.9 millionrange 13.9 million - 87.6 million L
Olympic swimming pools14at 2,500 m³ each
Organic load, as people's raw sewage52,313person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 556 kg3,139 kg17,511 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 1,459 kg14,822 kg63,128 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 26 kg220 kg814 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 17 kg91 kg473 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 1.4 trillion organisms34.9 trillion organisms875.6 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Horns Cross Sewage Treatment Works

Inlet overflow at sewage works · discharges to Tributary of River Yeo

Spills 2025
230 (2,035 hours) · no change on 2024
Spills 2024
229 (1,603 hours)
Long-term average
170.5 spills a year (monitored since 2022)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
Operational improvement ongoing
WFD catchment
Upper River Yeo (Bideford) (GB108050014470)
Outlet location
SS38852320 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00597 · 200403 · company name: HORNS CROSS STW_SO_HORNS CROSS

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.