Storm overflow register · South West Water

Horrabridge sewage works: storm overflow spills 2025

Horrabridge sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to River Walkham. In 2025 it recorded 53 spills totalling 985 hours, against 74 spills and 1,491 hours in 2024. By hours spilling, it ranks 116 of 334 South West Water works, where 1 spilled longest.

Works size: 3,106 population equivalent (HORRABRIDGE STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecHorrabridge WwTW6 Jan 2025 11:44 GMT, 124.8 h11 Jan 2025 16:51 GMT, 3.7 h26 Jan 2025 22:01 GMT, 124.1 h23 Feb 2025 20:20 GMT, 127.7 h18 Apr 2025 21:40 GMT, 40.4 h20 Apr 2025 14:30 GMT, 102 min14 Jun 2025 00:59 GMT, 4.5 h14 Jun 2025 08:02 GMT, 5 h19 Oct 2025 11:48 GMT, 5.5 h5 Nov 2025 01:04 GMT, 86 h8 Nov 2025 15:10 GMT, 68 min8 Nov 2025 17:08 GMT, 67 min8 Nov 2025 18:59 GMT, 69 min10 Nov 2025 01:24 GMT, 126.1 h15 Nov 2025 08:07 GMT, 19.6 h16 Nov 2025 04:12 GMT, 75 min16 Nov 2025 06:03 GMT, 66 min16 Nov 2025 08:51 GMT, 88 min16 Nov 2025 10:29 GMT, 4.9 h16 Nov 2025 15:24 GMT, 3.3 h16 Nov 2025 18:48 GMT, 5 h17 Nov 2025 00:00 GMT, 79 min17 Nov 2025 01:41 GMT, 85 min17 Nov 2025 03:42 GMT, 64 min17 Nov 2025 05:53 GMT, 76 min17 Nov 2025 08:23 GMT, 75 min17 Nov 2025 09:53 GMT, 76 min17 Nov 2025 11:30 GMT, 74 min17 Nov 2025 12:54 GMT, 77 min17 Nov 2025 14:18 GMT, 73 min17 Nov 2025 15:47 GMT, 73 min17 Nov 2025 17:41 GMT, 73 min17 Nov 2025 20:22 GMT, 72 min17 Nov 2025 22:03 GMT, 76 min18 Nov 2025 00:33 GMT, 76 min18 Nov 2025 02:48 GMT, 79 min18 Nov 2025 07:21 GMT, 96 min18 Nov 2025 09:56 GMT, 82 min18 Nov 2025 13:54 GMT, 93 min18 Nov 2025 20:48 GMT, 78 min2 Dec 2025 14:34 GMT, 97 min2 Dec 2025 16:49 GMT, 99 min6 Dec 2025 18:22 GMT, 79.7 h10 Dec 2025 03:31 GMT, 105 min10 Dec 2025 07:29 GMT, 13.3 h10 Dec 2025 20:49 GMT, 3.6 h11 Dec 2025 00:35 GMT, 2.4 h11 Dec 2025 03:27 GMT, 2.5 h11 Dec 2025 08:02 GMT, 32.5 h12 Dec 2025 17:34 GMT, 2.7 h12 Dec 2025 21:50 GMT, 2.7 h13 Dec 2025 01:17 GMT, 2.7 h20 Dec 2025 04:38 GMT, 124.5 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

010k20k30k40kJan 2025: 251 h spilling ≈ 13,331 m³ (range 5,310–33,469 m³)JanFeb 2025: 126 h spilling ≈ 6,695 m³ (range 2,667–16,808 m³)FebMar 2025: 4.0 h spilling ≈ 213 m³ (range 85–534 m³)MarApr 2025: 42 h spilling ≈ 2,241 m³ (range 892–5,625 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 9.4 h spilling ≈ 500 m³ (range 199–1,256 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 5.5 h spilling ≈ 293 m³ (range 117–735 m³)OctNov 2025: 277 h spilling ≈ 14,721 m³ (range 5,863–36,956 m³)NovDec 2025: 271 h spilling ≈ 14,444 m³ (range 5,753–36,262 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
23 Feb 2025, 20:20Horrabridge WwTW5.3 days2,706 – 17,055 m³
10 Nov 2025, 01:24Horrabridge WwTW5.3 days2,673 – 16,848 m³
6 Jan 2025, 11:44Horrabridge WwTW5.2 days2,646 – 16,677 m³
20 Dec 2025, 04:38Horrabridge WwTW5.2 days2,640 – 16,639 m³
26 Jan 2025, 22:01Horrabridge WwTW5.2 days2,631 – 16,585 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate52,443 m³range 20,889 – 131,659 m³
In litres52.4 millionrange 20.9 million – 131.7 million L
Olympic swimming pools21at 2,500 m³ each
Organic load, as people's raw sewage78,664person-days of untreated BOD

Assumed spill rate while spilling: 5.9 – 37.1 L/s (central 14.8 L/s), from a dry-weather flow of 5.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 836 kg4,720 kg26,332 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 2,193 kg22,288 kg94,926 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 40 kg330 kg1,224 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 25 kg136 kg711 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 2.1 trillion organisms52.4 trillion organisms1.3 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Horrabridge WwTW

Storm tank at sewage works · discharges to River Walkham

Spills 2025
53 (985 hours) · down 28% on 2024
Spills 2024
74 (1,491 hours)
Long-term average
110.3 spills a year (monitored since 2018)
Monitor uptime
97% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Walkham (GB108047007870)
Outlet location
SX49777043 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00598 · 302126 · company name: HORRABRIDGE STW_SSO_HORRABRIDGE

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.