Storm overflow register · South West Water

Monkleigh sewage works: storm overflow spills 2025

Monkleigh sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to River Torridge. In 2025 it recorded 62 spills totalling 68 hours, against 72 spills and 89 hours in 2024. By hours spilling, it ranks 268 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecMonkleigh Sewage…4 Jan 2025 21:02 GMT, 8 min4 Jan 2025 21:28 GMT, 16 min4 Jan 2025 21:46 GMT, 8 min4 Jan 2025 22:30 GMT, 20 min5 Jan 2025 06:58 GMT, 22 min5 Jan 2025 08:24 GMT, 3.1 h5 Jan 2025 11:48 GMT, 60 min5 Jan 2025 12:50 GMT, 12 min5 Jan 2025 19:44 GMT, 2 h5 Jan 2025 21:48 GMT, 6 min5 Jan 2025 22:02 GMT, 16 min5 Jan 2025 22:22 GMT, 4 min5 Jan 2025 22:48 GMT, 92 min6 Jan 2025 00:22 GMT, 3.5 h6 Jan 2025 04:02 GMT, 26 min6 Jan 2025 04:50 GMT, 26 min6 Jan 2025 05:26 GMT, 12 min6 Jan 2025 08:44 GMT, 26 min23 Jan 2025 10:32 GMT, 14 min26 Jan 2025 22:10 GMT, 24 min28 Jan 2025 23:34 GMT, 4 min23 Feb 2025 17:48 GMT, 22 min23 Feb 2025 18:52 GMT, 10 min23 Feb 2025 19:06 GMT, 48 min26 Feb 2025 05:36 GMT, 2 min26 Feb 2025 05:40 GMT, 22 min15 Mar 2025 08:10 GMT, 26 min30 Mar 2025 16:14 GMT, 14 min30 Mar 2025 16:40 GMT, 4 min3 Apr 2025 14:42 GMT, 116 min4 Apr 2025 14:22 GMT, 10 min15 Apr 2025 14:50 GMT, 36 min15 Apr 2025 15:40 GMT, 6 min15 Apr 2025 22:02 GMT, 82 min15 Apr 2025 23:48 GMT, 114 min16 Apr 2025 01:44 GMT, 7.7 h16 Apr 2025 09:30 GMT, 112 min16 Apr 2025 11:26 GMT, 32 min16 Apr 2025 13:10 GMT, 2 min3 May 2025 15:58 GMT, 24 min7 May 2025 16:02 GMT, 2 h9 May 2025 07:44 GMT, 32 min9 May 2025 18:38 GMT, 14 min13 May 2025 06:26 GMT, 6 min14 May 2025 17:06 GMT, 32 min17 May 2025 18:02 GMT, 14 min22 May 2025 10:02 GMT, 14 min25 May 2025 07:50 GMT, 6 min9 Jun 2025 17:32 GMT, 12 min12 Jun 2025 10:02 GMT, 26 min19 Jun 2025 08:54 GMT, 66 min20 Jun 2025 08:30 GMT, 32 min20 Jun 2025 10:00 GMT, 4 min21 Jun 2025 18:26 GMT, 46 min29 Jun 2025 20:54 GMT, 22 min29 Jun 2025 21:34 GMT, 28 min2 Jul 2025 17:38 GMT, 24 min7 Jul 2025 10:48 GMT, 40 min20 Jul 2025 00:58 GMT, 4 min22 Jul 2025 04:52 GMT, 4 min24 Jul 2025 03:08 GMT, 2.2 h26 Jul 2025 05:46 GMT, 30 min27 Jul 2025 12:58 GMT, 8 min23 Aug 2025 01:24 GMT, 50 min23 Aug 2025 04:32 GMT, 2 min24 Aug 2025 12:44 GMT, 34 min30 Aug 2025 15:58 GMT, 6 min1 Sep 2025 08:44 GMT, 6 min3 Sep 2025 09:58 GMT, 8 min10 Sep 2025 13:28 GMT, 12 min11 Sep 2025 05:48 GMT, 6 min11 Sep 2025 09:24 GMT, 10 min11 Sep 2025 09:52 GMT, 10 min11 Sep 2025 23:04 GMT, 4 min14 Sep 2025 11:20 GMT, 14 min14 Sep 2025 12:16 GMT, 10 min14 Sep 2025 12:52 GMT, 12 min14 Sep 2025 14:34 GMT, 6 min14 Sep 2025 14:50 GMT, 20 min14 Sep 2025 15:22 GMT, 22 min15 Sep 2025 08:18 GMT, 14 min20 Sep 2025 14:26 GMT, 22 min19 Oct 2025 08:22 GMT, 2 min19 Oct 2025 16:26 GMT, 6 min24 Oct 2025 17:20 GMT, 2 min24 Oct 2025 18:10 GMT, 4 min24 Oct 2025 19:46 GMT, 6 min25 Oct 2025 00:36 GMT, 16 min28 Oct 2025 04:20 GMT, 8 min2 Nov 2025 05:10 GMT, 10 min3 Nov 2025 17:40 GMT, 2.1 h12 Nov 2025 04:48 GMT, 72 min14 Nov 2025 14:20 GMT, 34 min14 Nov 2025 15:00 GMT, 2 min14 Nov 2025 15:08 GMT, 42 min23 Nov 2025 19:16 GMT, 8 min29 Nov 2025 03:06 GMT, 10 min29 Nov 2025 10:42 GMT, 10 min1 Dec 2025 15:04 GMT, 58 min1 Dec 2025 16:56 GMT, 4 h1 Dec 2025 21:40 GMT, 4 min1 Dec 2025 21:48 GMT, 6 min1 Dec 2025 22:00 GMT, 8 min4 Dec 2025 03:00 GMT, 12 min4 Dec 2025 03:32 GMT, 10 min5 Dec 2025 12:32 GMT, 6 min5 Dec 2025 17:12 GMT, 18 min6 Dec 2025 00:12 GMT, 18 min6 Dec 2025 02:00 GMT, 2 min6 Dec 2025 02:18 GMT, 12 min6 Dec 2025 03:28 GMT, 12 min6 Dec 2025 09:10 GMT, 10 min6 Dec 2025 10:28 GMT, 14 min6 Dec 2025 14:34 GMT, 8 min7 Dec 2025 06:50 GMT, 10 min7 Dec 2025 09:38 GMT, 20 min7 Dec 2025 10:08 GMT, 8 min7 Dec 2025 10:36 GMT, 4 min9 Dec 2025 01:36 GMT, 32 min9 Dec 2025 02:22 GMT, 8 min9 Dec 2025 02:32 GMT, 8 min9 Dec 2025 07:06 GMT, 26 min9 Dec 2025 09:00 GMT, 20 min9 Dec 2025 10:18 GMT, 38 min15 Dec 2025 11:44 GMT, 28 min18 Dec 2025 10:56 GMT, 22 min

Hours spilling by month, 2025

05101520Jan 2025: 15 hours spillingJanFeb 2025: 1.7 hours spillingFebMar 2025: 0.7 hours spillingMarApr 2025: 16 hours spillingAprMay 2025: 4.4 hours spillingMayJun 2025: 3.9 hours spillingJunJul 2025: 4.0 hours spillingJulAug 2025: 1.5 hours spillingAugSep 2025: 2.9 hours spillingSepOct 2025: 0.7 hours spillingOctNov 2025: 5.3 hours spillingNovDec 2025: 11 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
16 Apr 2025, 01:44Monkleigh Sewage Treatment Works7.7 h
1 Dec 2025, 16:56Monkleigh Sewage Treatment Works4.0 h
6 Jan 2025, 00:22Monkleigh Sewage Treatment Works3.5 h
5 Jan 2025, 08:24Monkleigh Sewage Treatment Works3.1 h
24 Jul 2025, 03:08Monkleigh Sewage Treatment Works2.2 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate1,160 m³range 462 – 2,912 m³
In litres1.2 millionrange 462,053 – 2.9 million L
Olympic swimming pools0.5at 2,500 m³ each
Organic load, as people's raw sewage1,740person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 18 kg104 kg582 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 49 kg493 kg2,100 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 0.9 kg7.3 kg27 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 0.6 kg3.0 kg16 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 46.2 billion organisms1.2 trillion organisms29.1 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Monkleigh Sewage Treatment Works

Inlet overflow at sewage works · discharges to River Torridge

Spills 2025
62 (68 hours) · down 14% on 2024
Spills 2024
72 (89 hours)
Long-term average
59.6 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Torridge (Lew to Estuary) (GB108050014660)
Outlet location
SS45822045 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB00797 · DRA 1149 · company name: MONKLEIGH STW_SO_MONKLEIGH

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.