Storm overflow register · South West Water

Sheepwash sewage works: storm overflow spills 2025

Sheepwash sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to River Torridge. In 2025 it recorded 139 spills totalling 1,519 hours, against 131 spills and 1,450 hours in 2024. By hours spilling, it ranks 66 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSheepwash WwTW1 Jan 2025 09:07 GMT, 17.9 h2 Jan 2025 10:15 GMT, 46 min4 Jan 2025 17:07 GMT, 107.1 h9 Jan 2025 07:59 GMT, 96 min9 Jan 2025 09:55 GMT, 91 min23 Jan 2025 10:07 GMT, 4.2 h23 Jan 2025 14:24 GMT, 7 min23 Jan 2025 23:59 GMT, 10 h24 Jan 2025 10:25 GMT, 3.5 h24 Jan 2025 20:56 GMT, 65 min26 Jan 2025 09:35 GMT, 24.5 h27 Jan 2025 10:14 GMT, 49.6 h29 Jan 2025 12:21 GMT, 37 min29 Jan 2025 13:00 GMT, 3.1 h31 Jan 2025 02:43 GMT, 3.4 h4 Feb 2025 11:16 GMT, 6 min5 Feb 2025 08:50 GMT, 50 min5 Feb 2025 09:55 GMT, 9 min5 Feb 2025 10:15 GMT, 7 min5 Feb 2025 12:06 GMT, 7 min7 Feb 2025 10:29 GMT, 9 min14 Feb 2025 09:55 GMT, 63 min15 Feb 2025 03:41 GMT, 18 min15 Feb 2025 04:06 GMT, 66 min19 Feb 2025 20:49 GMT, 23 min20 Feb 2025 11:46 GMT, 32 min20 Feb 2025 15:04 GMT, 66 min21 Feb 2025 08:28 GMT, 92 min21 Feb 2025 10:03 GMT, 29.8 h23 Feb 2025 12:02 GMT, 73 h26 Feb 2025 13:09 GMT, 46 h28 Feb 2025 12:21 GMT, 70.7 h3 Mar 2025 19:44 GMT, 18.6 h5 Mar 2025 07:05 GMT, 3.3 h15 Apr 2025 09:07 GMT, 68 min15 Apr 2025 12:36 GMT, 16 min15 Apr 2025 13:23 GMT, 42 min15 Apr 2025 14:35 GMT, 65 min15 Apr 2025 16:28 GMT, 100 min15 Apr 2025 22:36 GMT, 24.5 h18 Apr 2025 10:41 GMT, 71 min18 Apr 2025 15:27 GMT, 98 min18 Apr 2025 18:13 GMT, 6 min18 Apr 2025 19:16 GMT, 4.3 h22 Apr 2025 20:56 GMT, 2.5 h11 May 2025 11:15 GMT, 15 min21 May 2025 05:47 GMT, 12 min24 May 2025 23:27 GMT, 24 min26 May 2025 23:16 GMT, 28 min27 May 2025 08:29 GMT, 5.5 h3 Jun 2025 05:25 GMT, 21 min3 Jun 2025 08:16 GMT, 41 min5 Jun 2025 02:00 GMT, 8 min6 Jun 2025 02:13 GMT, 26 min7 Jun 2025 12:21 GMT, 6 min7 Jun 2025 13:05 GMT, 19 min12 Jun 2025 05:24 GMT, 69 min12 Jun 2025 08:09 GMT, 6.8 h13 Jun 2025 13:16 GMT, 18 min13 Jun 2025 14:55 GMT, 9.9 h14 Jun 2025 08:37 GMT, 2.5 h22 Jun 2025 09:13 GMT, 18 min22 Jun 2025 22:33 GMT, 18 min14 Jul 2025 09:31 GMT, 14 min20 Jul 2025 00:46 GMT, 27 min21 Jul 2025 09:18 GMT, 48 min21 Jul 2025 11:24 GMT, 40 min21 Jul 2025 18:05 GMT, 14 min4 Aug 2025 12:29 GMT, 39 min4 Aug 2025 13:12 GMT, 5 min27 Aug 2025 07:21 GMT, 16 min28 Aug 2025 22:40 GMT, 103 min1 Sep 2025 08:56 GMT, 22 min2 Sep 2025 12:46 GMT, 14 min3 Sep 2025 00:27 GMT, 26 min3 Sep 2025 05:36 GMT, 29 min4 Sep 2025 02:22 GMT, 43 min7 Sep 2025 11:13 GMT, 27 min9 Sep 2025 20:29 GMT, 25 min10 Sep 2025 13:37 GMT, 25 min11 Sep 2025 09:03 GMT, 15 min11 Sep 2025 19:13 GMT, 38 min11 Sep 2025 22:33 GMT, 71 min12 Sep 2025 02:50 GMT, 16 min12 Sep 2025 03:41 GMT, 7 min12 Sep 2025 10:59 GMT, 17 min12 Sep 2025 12:53 GMT, 17 min13 Sep 2025 03:08 GMT, 23 min13 Sep 2025 03:47 GMT, 26 min13 Sep 2025 05:06 GMT, 27 min13 Sep 2025 05:53 GMT, 42 min13 Sep 2025 07:42 GMT, 2.1 h13 Sep 2025 15:06 GMT, 26 min13 Sep 2025 18:23 GMT, 93 min14 Sep 2025 11:13 GMT, 29 h15 Sep 2025 16:29 GMT, 74 min15 Sep 2025 17:49 GMT, 78 min15 Sep 2025 19:23 GMT, 21 min15 Sep 2025 20:02 GMT, 24 min15 Sep 2025 21:31 GMT, 16 min16 Sep 2025 08:04 GMT, 13 min16 Sep 2025 08:45 GMT, 10 min17 Sep 2025 02:34 GMT, 2.4 h17 Sep 2025 06:46 GMT, 2.1 h20 Sep 2025 10:29 GMT, 14 min20 Sep 2025 11:08 GMT, 46 min20 Sep 2025 14:23 GMT, 46 min3 Oct 2025 01:36 GMT, 15 min3 Oct 2025 10:42 GMT, 30 min3 Oct 2025 18:36 GMT, 31 min3 Oct 2025 19:34 GMT, 2.2 h19 Oct 2025 06:58 GMT, 72 min19 Oct 2025 13:58 GMT, 10 min20 Oct 2025 03:44 GMT, 21 min20 Oct 2025 06:38 GMT, 6.8 h20 Oct 2025 19:09 GMT, 19 min22 Oct 2025 17:09 GMT, 64 min23 Oct 2025 08:40 GMT, 59 min23 Oct 2025 16:28 GMT, 72 min24 Oct 2025 07:44 GMT, 17 min24 Oct 2025 08:21 GMT, 3.2 h24 Oct 2025 11:59 GMT, 33 min24 Oct 2025 14:48 GMT, 27.4 h25 Oct 2025 19:15 GMT, 26 min25 Oct 2025 23:49 GMT, 28 min26 Oct 2025 17:43 GMT, 5.1 h26 Oct 2025 23:05 GMT, 11 min28 Oct 2025 04:18 GMT, 7.3 h29 Oct 2025 09:04 GMT, 13 h30 Oct 2025 10:01 GMT, 24 min30 Oct 2025 20:51 GMT, 2.7 h31 Oct 2025 21:19 GMT, 70.9 h4 Nov 2025 09:39 GMT, 85 min4 Nov 2025 13:59 GMT, 6.8 h5 Nov 2025 00:27 GMT, 2.2 h5 Nov 2025 03:22 GMT, 80 min5 Nov 2025 06:03 GMT, 4.7 h9 Nov 2025 14:59 GMT, 52 min10 Nov 2025 15:18 GMT, 3.5 h11 Nov 2025 16:43 GMT, 45.2 h13 Nov 2025 18:34 GMT, 14 min13 Nov 2025 19:14 GMT, 72.9 h16 Nov 2025 20:19 GMT, 16 min17 Nov 2025 07:53 GMT, 3.3 h18 Nov 2025 08:31 GMT, 4.8 h18 Nov 2025 13:56 GMT, 25.2 h19 Nov 2025 15:54 GMT, 57 min19 Nov 2025 17:31 GMT, 42.1 h22 Nov 2025 07:04 GMT, 28.2 h23 Nov 2025 20:13 GMT, 64 min23 Nov 2025 21:40 GMT, 21 min23 Nov 2025 22:39 GMT, 2 h24 Nov 2025 02:45 GMT, 22.2 h27 Nov 2025 17:31 GMT, 65 min29 Nov 2025 02:26 GMT, 41.6 h30 Nov 2025 20:33 GMT, 13 min30 Nov 2025 21:20 GMT, 13.1 h1 Dec 2025 10:43 GMT, 94 min1 Dec 2025 12:25 GMT, 8 min1 Dec 2025 12:37 GMT, 194.7 h9 Dec 2025 15:24 GMT, 44.5 h11 Dec 2025 14:31 GMT, 100 min12 Dec 2025 02:27 GMT, 9.1 h14 Dec 2025 10:13 GMT, 38 min15 Dec 2025 02:25 GMT, 36.4 h16 Dec 2025 15:22 GMT, 24.2 h17 Dec 2025 17:56 GMT, 122.7 h22 Dec 2025 20:58 GMT, 58 min23 Dec 2025 04:25 GMT, 4.1 h23 Dec 2025 09:03 GMT, 97 min

Hours spilling by month, 2025

0200400600Jan 2025: 229 hours spillingJanFeb 2025: 168 hours spillingFebMar 2025: 81 hours spillingMarApr 2025: 39 hours spillingAprMay 2025: 6.8 hours spillingMayJun 2025: 23 hours spillingJunJul 2025: 2.4 hours spillingJulAug 2025: 2.7 hours spillingAugSep 2025: 52 hours spillingSepOct 2025: 79 hours spillingOctNov 2025: 383 hours spillingNovDec 2025: 453 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
1 Dec 2025, 12:37Sheepwash WwTW8.1 days
17 Dec 2025, 17:56Sheepwash WwTW5.1 days
4 Jan 2025, 17:07Sheepwash WwTW4.5 days
23 Feb 2025, 12:02Sheepwash WwTW3.0 days
13 Nov 2025, 19:14Sheepwash WwTW3.0 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate26,019 m³range 10,364 – 65,321 m³
In litres26.0 millionrange 10.4 million – 65.3 million L
Olympic swimming pools10at 2,500 m³ each
Organic load, as people's raw sewage39,028person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 415 kg2,342 kg13,064 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 1,088 kg11,058 kg47,096 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 20 kg164 kg607 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 12 kg68 kg353 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 1.0 trillion organisms26.0 trillion organisms653.2 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Sheepwash WwTW

Storm tank at sewage works · discharges to River Torridge

Spills 2025
139 (1,519 hours) · up 6% on 2024
Spills 2024
131 (1,450 hours)
Long-term average
116.3 spills a year (monitored since 2019)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Torridge (Combe Lake to Lew) (GB108050013930)
Outlet location
SS48480595 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB01076 · SWWA 496 · company name: SHEEPWASH STW_SO_SHEEPWASH

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.