Storm overflow register · South West Water

Shute sewage works: storm overflow spills 2025

Shute sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to Trib of River Creedy. In 2025 it recorded 43 spills totalling 175 hours, against 44 spills and 174 hours in 2024. By hours spilling, it ranks 240 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecShute WwTW4 Jan 2025 19:33 GMT, 56 min4 Jan 2025 20:47 GMT, 30 min4 Jan 2025 21:29 GMT, 12.8 h5 Jan 2025 10:37 GMT, 6 min5 Jan 2025 10:51 GMT, 84 min5 Jan 2025 12:19 GMT, 18 min5 Jan 2025 19:43 GMT, 4 min5 Jan 2025 19:49 GMT, 16 min5 Jan 2025 20:15 GMT, 30 min5 Jan 2025 20:55 GMT, 34 min5 Jan 2025 21:33 GMT, 64 min5 Jan 2025 22:47 GMT, 12 min5 Jan 2025 23:01 GMT, 11.1 h6 Jan 2025 10:15 GMT, 16 min23 Jan 2025 10:43 GMT, 30 min26 Jan 2025 09:41 GMT, 3.1 h26 Jan 2025 13:01 GMT, 2.6 h26 Jan 2025 19:33 GMT, 8 min26 Jan 2025 20:01 GMT, 42.7 h28 Jan 2025 21:25 GMT, 16 min23 Feb 2025 21:25 GMT, 108 min26 Feb 2025 06:27 GMT, 88 min26 Feb 2025 09:37 GMT, 8 min15 Apr 2025 14:23 GMT, 20 min16 Apr 2025 00:17 GMT, 48 min18 Apr 2025 16:11 GMT, 50 min18 Apr 2025 19:15 GMT, 3.5 h23 Apr 2025 16:27 GMT, 8 min12 Jun 2025 09:57 GMT, 10 min12 Jun 2025 10:47 GMT, 6 min12 Jun 2025 11:33 GMT, 10 min13 Jun 2025 19:47 GMT, 14 min14 Jun 2025 18:29 GMT, 20 min20 Jul 2025 02:57 GMT, 2 min28 Aug 2025 23:29 GMT, 4 min29 Aug 2025 00:55 GMT, 10 min31 Aug 2025 10:43 GMT, 8 min3 Sep 2025 10:43 GMT, 20 min9 Sep 2025 15:43 GMT, 6 min9 Sep 2025 16:37 GMT, 30 min9 Sep 2025 17:15 GMT, 24 min9 Sep 2025 22:01 GMT, 4 min9 Sep 2025 22:15 GMT, 20 min20 Oct 2025 04:29 GMT, 6 min9 Nov 2025 15:23 GMT, 2 min9 Nov 2025 20:15 GMT, 4 min12 Nov 2025 05:01 GMT, 28 min13 Nov 2025 19:13 GMT, 2.1 h14 Nov 2025 14:01 GMT, 40 min14 Nov 2025 17:21 GMT, 4.3 h15 Nov 2025 22:21 GMT, 37.6 h24 Nov 2025 03:45 GMT, 32 min24 Nov 2025 06:37 GMT, 22 min29 Nov 2025 04:27 GMT, 4 min1 Dec 2025 16:35 GMT, 24 min4 Dec 2025 04:13 GMT, 18 min5 Dec 2025 15:01 GMT, 16 min5 Dec 2025 15:31 GMT, 58 min9 Dec 2025 02:11 GMT, 18 min9 Dec 2025 10:13 GMT, 88 min12 Dec 2025 05:19 GMT, 22 min15 Dec 2025 15:15 GMT, 14 min15 Dec 2025 18:09 GMT, 11.5 h17 Dec 2025 12:27 GMT, 36 min17 Dec 2025 21:15 GMT, 14 min18 Dec 2025 10:33 GMT, 18.8 h20 Dec 2025 22:45 GMT, 28 min22 Dec 2025 00:13 GMT, 82 min

Hours spilling by month, 2025

020406080Jan 2025: 79 hours spillingJanFeb 2025: 3.4 hours spillingFebMar 2025: 0.0 hours spillingMarApr 2025: 5.6 hours spillingAprMay 2025: 0.0 hours spillingMayJun 2025: 1.0 hours spillingJunJul 2025: 0.0 hours spillingJulAug 2025: 0.4 hours spillingAugSep 2025: 1.7 hours spillingSepOct 2025: 0.1 hours spillingOctNov 2025: 46 hours spillingNovDec 2025: 37 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
26 Jan 2025, 20:01Shute WwTW1.8 days
15 Nov 2025, 22:21Shute WwTW1.6 days
18 Dec 2025, 10:33Shute WwTW18.8 h
4 Jan 2025, 21:29Shute WwTW12.8 h
15 Dec 2025, 18:09Shute WwTW11.5 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate2,997 m³range 1,194 – 7,524 m³
In litres3.0 millionrange 1.2 million – 7.5 million L
Olympic swimming pools1.2at 2,500 m³ each
Organic load, as people's raw sewage4,495person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 48 kg270 kg1,505 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 125 kg1,274 kg5,425 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 2.3 kg19 kg70 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1.4 kg7.8 kg41 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 119.4 billion organisms3.0 trillion organisms75.2 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Shute WwTW

Inlet overflow at sewage works · discharges to Trib of River Creedy

Spills 2025
43 (175 hours) · down 2% on 2024
Spills 2024
44 (174 hours)
Long-term average
36.0 spills a year (monitored since 2022)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Jackmoor Brook (GB108045009080)
Outlet location
SS89540008 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB01087 · 203276 · company name: SHUTE STW_SO_SHUTE

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.