Tiverton sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to River Exe. In 2025 it recorded 160 spills totalling 3,152 hours, against 171 spills and 3,439 hours in 2024. By hours spilling, it ranks 9 of 334 South West Water works, where 1 spilled longest.

Works size: 23,667 population equivalent (TIVERTON STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecTiverton STW127 spills, 305.1 h, 2 Jan to 16 Jan2 spills, 619.5 h, 23 Jan to 18 Feb11 spills, 306.6 h, 19 Feb to 5 Mar6 spills, 215.1 h, 15 Apr to 25 Apr12 spills, 85 h, 12 Jun to 15 Jun10 spills, 23.7 h, 20 Jul to 21 Jul3 spills, 177.1 h, 29 Aug to 5 Sep9 Sep 2025 23:03 GMT, 322 h30 spills, 150.4 h, 22 Oct to 29 Oct21 spills, 35.5 h, 30 Oct to 1 Nov9 Nov 2025 17:21 GMT, 258.8 h15081 spills, 760.2 h, 21 Nov to 29 Dec88 spills, 2.1 h, 30 Dec to 31 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

0200k400k600k800kJan 2025: 507 h spilling ≈ 205,761 m³ (range 81,959-516,571 m³)JanFeb 2025: 634 h spilling ≈ 256,978 m³ (range 102,360-645,154 m³)FebMar 2025: 90 h spilling ≈ 36,497 m³ (range 14,537-91,627 m³)MarApr 2025: 215 h spilling ≈ 87,227 m³ (range 34,745-218,988 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 85 h spilling ≈ 34,469 m³ (range 13,730-86,536 m³)JunJul 2025: 24 h spilling ≈ 9,570 m³ (range 3,812-24,027 m³)JulAug 2025: 70 h spilling ≈ 28,265 m³ (range 11,258-70,960 m³)AugSep 2025: 429 h spilling ≈ 174,090 m³ (range 69,344-437,060 m³)SepOct 2025: 170 h spilling ≈ 68,776 m³ (range 27,395-172,666 m³)OctNov 2025: 478 h spilling ≈ 193,961 m³ (range 77,258-486,945 m³)NovDec 2025: 559 h spilling ≈ 226,727 m³ (range 90,310-569,206 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
23 Jan 2025, 13:40Tiverton STW25.8 days100,042 - 630,545 m³
9 Sep 2025, 23:03Tiverton STW13.4 days52,004 - 327,769 m³
19 Feb 2025, 23:24Tiverton STW12.6 days48,857 - 307,934 m³
22 Nov 2025, 12:54Tiverton STW12.0 days46,679 - 294,207 m³
4 Jan 2025, 08:18Tiverton STW12.0 days46,531 - 293,274 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate1.3 million m³range 509,118 - 3.2 million m³
In litres1.3 billionrange 509.1 million - 3.2 billion L
Olympic swimming pools511at 2,500 m³ each
Organic load, as people's raw sewage1.9 millionperson-days of untreated BOD

Assumed spill rate while spilling: 44.9 - 282.8 L/s (central 112.6 L/s), from a dry-weather flow of 44.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 20,365 kg115,034 kg641,774 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 53,457 kg543,218 kg2.3 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 967 kg8,052 kg29,843 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 611 kg3,323 kg17,328 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 50.9 trillion organisms1.3 × 10¹⁵ organisms3.2 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Tiverton STW

Storm tank at sewage works · discharges to River Exe

Spills 2025
160 (3,152 hours) · down 6% on 2024
Spills 2024
171 (3,439 hours)
Long-term average
89.8 spills a year (monitored since 2019)
Monitor uptime
92% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Exe (Barle to Culm) (GB108045015050)
Outlet location
SS95301030 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB01247 · 201437 · company name: TIVERTON STW_SSO_TIVERTON

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.