Storm overflow register · South West Water

Trebullett sewage works: storm overflow spills 2025

Trebullett sewage treatment works, run by South West Water, has 1 monitored storm overflow discharging to The River Inny. In 2025 it recorded 95 spills totalling 1,319 hours, against 113 spills and 1,707 hours in 2024. By hours spilling, it ranks 80 of 334 South West Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecTrebullett STW4 Jan 2025 21:15 GMT, 136.8 h10 Jan 2025 14:15 GMT, 21.2 h11 Jan 2025 11:30 GMT, 15 min11 Jan 2025 12:00 GMT, 30 min11 Jan 2025 23:45 GMT, 78 min12 Jan 2025 01:15 GMT, 12 min12 Jan 2025 01:30 GMT, 15 min12 Jan 2025 02:00 GMT, 2.2 h12 Jan 2025 04:15 GMT, 15 min12 Jan 2025 04:45 GMT, 15 min12 Jan 2025 05:15 GMT, 15 min23 Jan 2025 10:15 GMT, 15 min24 Jan 2025 02:45 GMT, 5 min24 Jan 2025 03:00 GMT, 6.6 h24 Jan 2025 09:45 GMT, 59 min24 Jan 2025 11:00 GMT, 23 min24 Jan 2025 13:45 GMT, 15 min24 Jan 2025 15:30 GMT, 15 min24 Jan 2025 16:15 GMT, 30 min24 Jan 2025 17:00 GMT, 22 min24 Jan 2025 18:00 GMT, 15 min24 Jan 2025 18:30 GMT, 15 min24 Jan 2025 19:15 GMT, 90 min24 Jan 2025 22:45 GMT, 15 min25 Jan 2025 00:30 GMT, 15 min25 Jan 2025 01:15 GMT, 30 min25 Jan 2025 02:45 GMT, 15 min25 Jan 2025 03:15 GMT, 30 min25 Jan 2025 05:30 GMT, 8 min25 Jan 2025 05:45 GMT, 15 min25 Jan 2025 06:30 GMT, 16 min25 Jan 2025 07:30 GMT, 30 min25 Jan 2025 08:45 GMT, 45 min25 Jan 2025 09:45 GMT, 21 min25 Jan 2025 11:00 GMT, 15 min25 Jan 2025 13:00 GMT, 15 min25 Jan 2025 21:45 GMT, 15 min26 Jan 2025 08:30 GMT, 78.2 h29 Jan 2025 14:45 GMT, 19.8 h30 Jan 2025 13:15 GMT, 30 min30 Jan 2025 14:00 GMT, 47 min30 Jan 2025 15:00 GMT, 5 min30 Jan 2025 15:15 GMT, 15 min30 Jan 2025 15:45 GMT, 85 min30 Jan 2025 17:15 GMT, 17.3 h31 Jan 2025 10:45 GMT, 15 min31 Jan 2025 14:15 GMT, 15 min31 Jan 2025 14:45 GMT, 14 min31 Jan 2025 17:45 GMT, 57 min31 Jan 2025 18:45 GMT, 20 min31 Jan 2025 19:15 GMT, 24 min31 Jan 2025 19:45 GMT, 26 min31 Jan 2025 20:15 GMT, 7.9 h1 Feb 2025 04:15 GMT, 2.1 h1 Feb 2025 06:30 GMT, 40 min1 Feb 2025 07:15 GMT, 24 min1 Feb 2025 07:45 GMT, 98 min1 Feb 2025 09:30 GMT, 30 min1 Feb 2025 17:45 GMT, 15 min2 Feb 2025 09:15 GMT, 15 min21 Feb 2025 09:00 GMT, 31 min21 Feb 2025 09:45 GMT, 26 min21 Feb 2025 10:15 GMT, 24.3 h22 Feb 2025 11:00 GMT, 26 min22 Feb 2025 11:45 GMT, 15 min22 Feb 2025 14:15 GMT, 15 min22 Feb 2025 15:00 GMT, 15 min22 Feb 2025 16:00 GMT, 15 min22 Feb 2025 16:45 GMT, 15 min22 Feb 2025 19:00 GMT, 15 min22 Feb 2025 20:00 GMT, 30 min22 Feb 2025 20:45 GMT, 12 min22 Feb 2025 21:15 GMT, 15 min22 Feb 2025 23:45 GMT, 15 min23 Feb 2025 01:45 GMT, 6.1 h23 Feb 2025 08:00 GMT, 15 min23 Feb 2025 09:15 GMT, 15 min23 Feb 2025 09:45 GMT, 30 min23 Feb 2025 10:30 GMT, 96.5 h27 Feb 2025 11:15 GMT, 30 min27 Feb 2025 13:00 GMT, 15 min27 Feb 2025 13:30 GMT, 20.9 h28 Feb 2025 17:45 GMT, 30 min28 Feb 2025 18:30 GMT, 30 min28 Feb 2025 19:15 GMT, 30 min28 Feb 2025 20:00 GMT, 15 min28 Feb 2025 20:30 GMT, 15 min28 Feb 2025 21:00 GMT, 15 min28 Feb 2025 21:30 GMT, 34 min28 Feb 2025 22:15 GMT, 21 min28 Feb 2025 22:45 GMT, 23 min28 Feb 2025 23:30 GMT, 83 min1 Mar 2025 01:00 GMT, 15 min1 Mar 2025 01:30 GMT, 3.8 h1 Mar 2025 05:30 GMT, 38 min1 Mar 2025 06:30 GMT, 45 min1 Mar 2025 07:30 GMT, 13 min1 Mar 2025 07:45 GMT, 20 min1 Mar 2025 08:15 GMT, 8 min1 Mar 2025 08:30 GMT, 30 min1 Mar 2025 09:30 GMT, 15 min1 Mar 2025 14:30 GMT, 15 min19 Mar 2025 10:15 GMT, 15 min15 Apr 2025 18:30 GMT, 15 min18 Apr 2025 10:15 GMT, 15 min18 Apr 2025 11:45 GMT, 45 min18 Apr 2025 14:30 GMT, 60 min18 Apr 2025 16:00 GMT, 30 min18 Apr 2025 17:15 GMT, 75 min18 Apr 2025 18:45 GMT, 2.5 h18 Apr 2025 21:30 GMT, 75 min18 Apr 2025 23:00 GMT, 75 min19 Apr 2025 00:45 GMT, 2.5 h19 Apr 2025 03:30 GMT, 2.5 h19 Apr 2025 06:15 GMT, 75 min19 Apr 2025 07:45 GMT, 75 min19 Apr 2025 09:15 GMT, 75 min19 Apr 2025 10:45 GMT, 75 min19 Apr 2025 12:15 GMT, 60 min19 Apr 2025 17:15 GMT, 30 min19 Apr 2025 18:30 GMT, 15 min19 Apr 2025 19:00 GMT, 15 min19 Apr 2025 19:30 GMT, 2.5 h19 Apr 2025 22:30 GMT, 60 min20 Apr 2025 00:00 GMT, 60 min20 Apr 2025 01:30 GMT, 15 min20 Apr 2025 02:00 GMT, 30 min20 Apr 2025 03:15 GMT, 45 min20 Apr 2025 04:45 GMT, 30 min20 Apr 2025 06:00 GMT, 30 min20 Apr 2025 07:00 GMT, 15 min20 Apr 2025 07:30 GMT, 45 min20 Apr 2025 08:30 GMT, 30 min20 Apr 2025 09:15 GMT, 15 min21 Apr 2025 08:00 GMT, 15 min22 Apr 2025 20:45 GMT, 30 min22 Apr 2025 21:30 GMT, 60 min23 Apr 2025 07:00 GMT, 15 min23 Apr 2025 08:15 GMT, 15 min27 May 2025 09:00 GMT, 15 min7 Jun 2025 12:15 GMT, 15 min29 Aug 2025 08:30 GMT, 15 min3 Sep 2025 09:00 GMT, 30 min8 Sep 2025 15:00 GMT, 11 min9 Sep 2025 19:00 GMT, 36 min9 Sep 2025 19:45 GMT, 15 min9 Sep 2025 22:15 GMT, 15 min10 Sep 2025 13:15 GMT, 15 min15 Sep 2025 12:45 GMT, 15 min17 Sep 2025 17:45 GMT, 15 min17 Sep 2025 19:45 GMT, 15 min19 Sep 2025 09:00 GMT, 15 min20 Sep 2025 09:45 GMT, 17 min20 Sep 2025 10:15 GMT, 14 min20 Sep 2025 10:30 GMT, 2 h20 Sep 2025 12:45 GMT, 44 min22 Sep 2025 07:00 GMT, 15 min27 Sep 2025 22:00 GMT, 15 min1 Oct 2025 20:15 GMT, 15 min4 Oct 2025 06:45 GMT, 15 min16 Oct 2025 12:45 GMT, 15 min30 Oct 2025 20:30 GMT, 53 min30 Oct 2025 21:30 GMT, 30 min3 Nov 2025 10:30 GMT, 15 min4 Nov 2025 13:00 GMT, 73.7 h7 Nov 2025 14:45 GMT, 14.5 h8 Nov 2025 05:15 GMT, 73 min8 Nov 2025 06:45 GMT, 15 min8 Nov 2025 07:30 GMT, 20 min8 Nov 2025 08:00 GMT, 88 min8 Nov 2025 10:00 GMT, 24 min9 Nov 2025 10:00 GMT, 15 min9 Nov 2025 12:00 GMT, 22.9 h10 Nov 2025 11:00 GMT, 15 min10 Nov 2025 14:45 GMT, 2 min10 Nov 2025 15:00 GMT, 4.7 h10 Nov 2025 19:45 GMT, 25 min10 Nov 2025 21:15 GMT, 12 min10 Nov 2025 22:15 GMT, 15 min10 Nov 2025 22:45 GMT, 31 min10 Nov 2025 23:30 GMT, 34 min11 Nov 2025 01:00 GMT, 15 min11 Nov 2025 02:15 GMT, 15 min11 Nov 2025 05:15 GMT, 23 min11 Nov 2025 05:45 GMT, 15 min11 Nov 2025 06:45 GMT, 15 min11 Nov 2025 07:15 GMT, 15 min11 Nov 2025 07:45 GMT, 30 min11 Nov 2025 11:00 GMT, 15 min11 Nov 2025 15:45 GMT, 138.4 h17 Nov 2025 10:15 GMT, 11 min17 Nov 2025 16:00 GMT, 15 min17 Nov 2025 22:15 GMT, 15 min24 Nov 2025 10:30 GMT, 15 min29 Nov 2025 04:30 GMT, 23 min29 Nov 2025 16:15 GMT, 15 min29 Nov 2025 17:30 GMT, 15 min30 Nov 2025 22:45 GMT, 324 h14 Dec 2025 11:00 GMT, 15 min14 Dec 2025 11:30 GMT, 45 min14 Dec 2025 14:30 GMT, 15 min14 Dec 2025 15:00 GMT, 15 min14 Dec 2025 16:45 GMT, 15 min14 Dec 2025 22:00 GMT, 15 min15 Dec 2025 00:45 GMT, 202.3 h23 Dec 2025 11:30 GMT, 12 min23 Dec 2025 11:45 GMT, 20 min23 Dec 2025 12:15 GMT, 28 min23 Dec 2025 12:45 GMT, 18 min23 Dec 2025 13:30 GMT, 45 min23 Dec 2025 15:00 GMT, 15 min23 Dec 2025 15:45 GMT, 4 min23 Dec 2025 16:45 GMT, 30 min23 Dec 2025 17:30 GMT, 30 min23 Dec 2025 20:30 GMT, 15 min23 Dec 2025 22:00 GMT, 15 min

Hours spilling by month, 2025

0200400600Jan 2025: 305 hours spillingJanFeb 2025: 168 hours spillingFebMar 2025: 8.2 hours spillingMarApr 2025: 32 hours spillingAprMay 2025: 0.2 hours spillingMayJun 2025: 0.2 hours spillingJunJul 2025: 0.0 hours spillingJulAug 2025: 0.2 hours spillingAugSep 2025: 6.8 hours spillingSepOct 2025: 2.1 hours spillingOctNov 2025: 266 hours spillingNovDec 2025: 531 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
30 Nov 2025, 22:45Trebullett STW13.5 days
15 Dec 2025, 00:45Trebullett STW8.4 days
11 Nov 2025, 15:45Trebullett STW5.8 days
4 Jan 2025, 21:15Trebullett STW5.7 days
23 Feb 2025, 10:30Trebullett STW4.0 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate22,604 m³range 9,004 – 56,748 m³
In litres22.6 millionrange 9.0 million – 56.7 million L
Olympic swimming pools9.0at 2,500 m³ each
Organic load, as people's raw sewage33,906person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 360 kg2,034 kg11,350 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 945 kg9,607 kg40,915 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 17 kg142 kg528 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 11 kg59 kg306 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 900.4 billion organisms22.6 trillion organisms567.5 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Trebullett STW

Inlet overflow at sewage works · discharges to The River Inny

Spills 2025
95 (1,319 hours) · down 16% on 2024
Spills 2024
113 (1,707 hours)
Long-term average
70.8 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Lower River Inny (GB108047007890)
Outlet location
SX32257715 (OS grid reference) · View on Apple Maps
EA ID / permit
SBB01272 · NRA-SW-5050 · company name: TREBULLETT STW_SO_TREBULLETT

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All South West Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.