Storm overflow register · Southern Water

Chickenhall Eastleigh sewage works: storm overflow spills 2025

Chickenhall Eastleigh sewage treatment works, run by Southern Water, has 1 monitored storm overflow discharging to The River Itchen. In 2025 it recorded 31 spills totalling 436 hours, against 73 spills and 1,000 hours in 2024. By hours spilling, it ranks 59 of 215 Southern Water works, where 1 spilled longest.

Works size: 104,496 population equivalent (EASTLEIGH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecChickenhall Eastleigh…5 Jan 2025 02:44 GMT, 46.9 h7 Jan 2025 06:41 GMT, 15.8 h8 Jan 2025 09:10 GMT, 64 min8 Jan 2025 17:26 GMT, 4.9 h26 Jan 2025 22:02 GMT, 49.9 h22 Feb 2025 01:06 GMT, 13.5 h24 Feb 2025 01:25 GMT, 45.5 h26 Feb 2025 10:42 GMT, 13.2 h19 Oct 2025 20:50 GMT, 26.1 h14 Nov 2025 14:45 GMT, 7.1 h5 Dec 2025 20:41 GMT, 10.5 h6 Dec 2025 08:32 GMT, 10.1 h7 Dec 2025 10:38 GMT, 16.5 h8 Dec 2025 08:06 GMT, 10.5 h8 Dec 2025 22:27 GMT, 49.4 h11 Dec 2025 08:16 GMT, 30 min11 Dec 2025 09:21 GMT, 64 min11 Dec 2025 10:32 GMT, 5 min11 Dec 2025 10:54 GMT, 11 min11 Dec 2025 11:29 GMT, 7 min11 Dec 2025 12:04 GMT, 6 min11 Dec 2025 13:22 GMT, 2 min11 Dec 2025 13:39 GMT, 2 min11 Dec 2025 18:29 GMT, 2 min11 Dec 2025 19:02 GMT, 3 min11 Dec 2025 19:22 GMT, 2 min11 Dec 2025 20:59 GMT, 7 min11 Dec 2025 21:16 GMT, 31 min11 Dec 2025 22:01 GMT, 2 min12 Dec 2025 09:18 GMT, 2.7 h12 Dec 2025 12:05 GMT, 11.9 h18 Dec 2025 10:55 GMT, 64.8 h21 Dec 2025 04:29 GMT, 2.6 h21 Dec 2025 07:17 GMT, 7 min21 Dec 2025 08:38 GMT, 18.1 h22 Dec 2025 10:35 GMT, 12 h22 Dec 2025 22:48 GMT, 11 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0250k500k750k1MJan 2025: 119 h spilling ≈ 212,172 m³ (range 84,512–532,666 m³)JanFeb 2025: 72 h spilling ≈ 129,273 m³ (range 51,492–324,544 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 26 h spilling ≈ 46,732 m³ (range 18,614–117,321 m³)OctNov 2025: 7.1 h spilling ≈ 12,712 m³ (range 5,064–31,915 m³)NovDec 2025: 212 h spilling ≈ 380,119 m³ (range 151,409–954,303 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
18 Dec 2025, 10:55Chickenhall Eastleigh WwTW2.7 days46,214 – 291,281 m³
26 Jan 2025, 22:02Chickenhall Eastleigh WwTW2.1 days35,552 – 224,079 m³
8 Dec 2025, 22:27Chickenhall Eastleigh WwTW2.1 days35,255 – 222,206 m³
5 Jan 2025, 02:44Chickenhall Eastleigh WwTW2.0 days33,448 – 210,819 m³
24 Feb 2025, 01:25Chickenhall Eastleigh WwTW1.9 days32,426 – 204,376 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate781,007 m³range 311,091 – 2.0 million m³
In litres781.0 millionrange 311.1 million – 2.0 billion L
Olympic swimming pools312at 2,500 m³ each
Organic load, as people's raw sewage1.2 millionperson-days of untreated BOD

Assumed spill rate while spilling: 198.1 – 1,248.6 L/s (central 497.4 L/s), from a dry-weather flow of 198.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 12,444 kg70,291 kg392,150 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 32,665 kg331,928 kg1.4 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 591 kg4,920 kg18,235 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 373 kg2,031 kg10,588 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 31.1 trillion organisms781.0 trillion organisms2.0 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Chickenhall Eastleigh WwTW

Storm tank at sewage works · discharges to The River Itchen

Spills 2025
31 (436 hours) · down 58% on 2024
Spills 2024
73 (1,000 hours)
Long-term average
42.6 spills a year (monitored since 2016)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - GW inundation
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
River Itchen (GB107042022580)
Outlet location
SU4681017880 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00174 · A00154 · company name: CHICKENHALL EASTLEIGH SSO - 115771

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Southern Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.