Overton sewage treatment works, run by Southern Water, has 1 monitored storm overflow discharging to Groundwater. In 2025 it recorded 36 spills totalling 211 hours, against 144 spills and 2,955 hours in 2024. By hours spilling, it ranks 107 of 215 Southern Water works, where 1 spilled longest.

Works size: 4,591 population equivalent (OVERTON STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecOverton Wastewater…5 Jan 2025 02:19 GMT, 21.4 h6 Jan 2025 02:52 GMT, 75 min6 Jan 2025 06:44 GMT, 5.9 h6 Jan 2025 19:15 GMT, 20 min23 Jan 2025 15:11 GMT, 92 min24 Jan 2025 08:31 GMT, 86 min26 Jan 2025 13:59 GMT, 14.7 h27 Jan 2025 09:07 GMT, 6 h27 Jan 2025 18:44 GMT, 4 h28 Jan 2025 06:26 GMT, 5.9 h28 Jan 2025 14:03 GMT, 66 min28 Jan 2025 17:38 GMT, 4.2 h31 Jan 2025 09:21 GMT, 110 min9 Feb 2025 12:44 GMT, 15 min9 Feb 2025 18:39 GMT, 4.3 h10 Feb 2025 07:50 GMT, 3.1 h10 Feb 2025 19:21 GMT, 62 min15 Feb 2025 11:49 GMT, 2 h16 Feb 2025 11:42 GMT, 2.4 h20 Feb 2025 12:34 GMT, 26 min20 Feb 2025 19:24 GMT, 42 min21 Feb 2025 08:59 GMT, 2.3 h21 Feb 2025 16:18 GMT, 11.2 h22 Feb 2025 08:57 GMT, 3.8 h23 Feb 2025 10:42 GMT, 10.3 h23 Feb 2025 22:51 GMT, 15.3 h24 Feb 2025 18:01 GMT, 2.8 h25 Feb 2025 02:25 GMT, 2.6 h25 Feb 2025 07:21 GMT, 5 h25 Feb 2025 18:39 GMT, 3.4 h26 Feb 2025 08:22 GMT, 14.9 h27 Feb 2025 08:12 GMT, 2.6 h27 Feb 2025 11:57 GMT, 42 min27 Feb 2025 18:51 GMT, 2.2 h28 Feb 2025 08:13 GMT, 2.6 h28 Feb 2025 12:50 GMT, 15 min1 Mar 2025 10:18 GMT, 2.4 h2 Mar 2025 10:59 GMT, 2.1 h2 Mar 2025 14:44 GMT, 15 min2 Mar 2025 18:27 GMT, 3.1 h3 Mar 2025 09:49 GMT, 26 min3 Mar 2025 19:13 GMT, 91 min4 Mar 2025 08:18 GMT, 2.2 h4 Mar 2025 19:11 GMT, 4.1 h5 Mar 2025 10:02 GMT, 15 min5 Mar 2025 19:01 GMT, 102 min7 Mar 2025 12:08 GMT, 3.5 h7 Mar 2025 19:20 GMT, 51 min8 Mar 2025 10:58 GMT, 95 min8 Mar 2025 19:26 GMT, 15 min9 Mar 2025 11:25 GMT, 107 min11 Mar 2025 14:49 GMT, 106 min11 Mar 2025 18:59 GMT, 101 min12 Mar 2025 19:18 GMT, 2 h13 Mar 2025 09:18 GMT, 91 min13 Mar 2025 19:17 GMT, 104 min16 Mar 2025 19:11 GMT, 23 min18 Dec 2025 13:04 GMT, 12.2 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

05,00010k15k20kJan 2025: 70 h spilling ≈ 5,475 m³ (range 2,181–13,745 m³)JanFeb 2025: 94 h spilling ≈ 7,410 m³ (range 2,952–18,604 m³)FebMar 2025: 35 h spilling ≈ 2,761 m³ (range 1,100–6,932 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)NovDec 2025: 12 h spilling ≈ 960 m³ (range 382–2,409 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 02:19Overton Wastewater Treatment Works21.4 h672 – 4,233 m³
23 Feb 2025, 22:51Overton Wastewater Treatment Works15.3 h478 – 3,012 m³
26 Feb 2025, 08:22Overton Wastewater Treatment Works14.9 h467 – 2,943 m³
26 Jan 2025, 13:59Overton Wastewater Treatment Works14.7 h461 – 2,903 m³
18 Dec 2025, 13:04Overton Wastewater Treatment Works12.2 h381 – 2,403 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate16,606 m³range 6,615 – 41,690 m³
In litres16.6 millionrange 6.6 million – 41.7 million L
Olympic swimming pools6.6at 2,500 m³ each
Organic load, as people's raw sewage24,909person-days of untreated BOD

Assumed spill rate while spilling: 8.7 – 54.9 L/s (central 21.9 L/s), from a dry-weather flow of 8.7 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 265 kg1,495 kg8,338 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 695 kg7,058 kg30,059 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 13 kg105 kg388 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 7.9 kg43 kg225 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 661.5 billion organisms16.6 trillion organisms416.9 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Overton Wastewater Treatment Works

Storm tank at sewage works · discharges to Groundwater

Spills 2025
36 (211 hours) · down 75% on 2024
Spills 2024
144 (2,955 hours)
Long-term average
38.0 spills a year (monitored since 2019)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
UWWTR investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
R. Test (Upper) (GB107042022710)
Outlet location
SU5046050100 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00633 · NPSWQD010441 · company name: OVERTON SSO - 115916

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Southern Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.