Storm overflow register · Southern Water

Thornham sewage works: storm overflow spills 2025

Thornham sewage treatment works, run by Southern Water, has 3 monitored storm overflows discharging to Chichester Hbr via Little Deep. In 2025 they recorded 37 spills totalling 361 hours, against 63 spills and 682 hours in 2024. By hours spilling, it ranks 72 of 215 Southern Water works, where 1 spilled longest.

Works size: 21,027 population equivalent (THORNHAM STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecThornham WwTW5 Jan 2025 02:57 GMT, 56.4 h8 Jan 2025 17:47 GMT, 3.7 h27 Jan 2025 14:32 GMT, 24 h28 Jan 2025 14:37 GMT, 50 min24 Feb 2025 09:59 GMT, 14 h25 Feb 2025 09:04 GMT, 14 min29 Aug 2025 07:08 GMT, 85 min3 Sep 2025 02:11 GMT, 8.7 h4 Sep 2025 06:30 GMT, 88 min22 Oct 2025 20:54 GMT, 4 h23 Oct 2025 09:00 GMT, 3.2 h23 Oct 2025 12:37 GMT, 65 min2 Dec 2025 19:39 GMT, 18.7 h3 Dec 2025 16:43 GMT, 7.1 h4 Dec 2025 08:26 GMT, 16.5 h5 Dec 2025 10:26 GMT, 103 min5 Dec 2025 16:02 GMT, 3 min5 Dec 2025 16:05 GMT, 10 min5 Dec 2025 16:28 GMT, 16 min5 Dec 2025 16:45 GMT, 2 min5 Dec 2025 17:09 GMT, 7 min5 Dec 2025 17:37 GMT, 24.8 h7 Dec 2025 08:33 GMT, 16.1 h18 Dec 2025 14:29 GMT, 30.6 h19 Dec 2025 21:15 GMT, 21 min19 Dec 2025 21:54 GMT, 22 min19 Dec 2025 22:26 GMT, 44 min19 Dec 2025 23:22 GMT, 26 minThornham WwTW29 Aug 2025 06:10 GMT, 2.6 h3 Sep 2025 02:52 GMT, 3.6 h3 Sep 2025 08:21 GMT, 16 min2 Dec 2025 19:47 GMT, 17.5 h3 Dec 2025 22:38 GMT, 3 min4 Dec 2025 08:40 GMT, 15.9 h5 Dec 2025 18:12 GMT, 24 h6 Dec 2025 18:26 GMT, 15 min7 Dec 2025 08:59 GMT, 16.4 h9 Dec 2025 09:03 GMT, 59 min9 Dec 2025 14:49 GMT, 3.3 h9 Dec 2025 19:22 GMT, 104 min18 Dec 2025 14:34 GMT, 31.1 h19 Dec 2025 23:02 GMT, 64 minThornham WwTW2 Dec 2025 17:09 GMT, 4 min2 Dec 2025 21:15 GMT, 2 min2 Dec 2025 21:18 GMT, 12 min2 Dec 2025 21:32 GMT, 2 min4 Dec 2025 09:36 GMT, 47 min4 Dec 2025 10:41 GMT, 2 min7 Dec 2025 13:06 GMT, 44 min18 Dec 2025 14:29 GMT, 4 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300kJan 2025: 85 h spilling ≈ 30,588 m³ (range 12,184–76,793 m³)JanFeb 2025: 14 h spilling ≈ 5,116 m³ (range 2,038–12,844 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 4.0 h spilling ≈ 1,441 m³ (range 574–3,618 m³)AugSep 2025: 14 h spilling ≈ 5,044 m³ (range 2,009–12,663 m³)SepOct 2025: 8.2 h spilling ≈ 2,954 m³ (range 1,177–7,417 m³)OctNov 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)NovDec 2025: 236 h spilling ≈ 85,063 m³ (range 33,883–213,555 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 02:57Thornham WwTW2.3 days8,092 – 50,999 m³
18 Dec 2025, 14:34Thornham WwTW1.3 days4,461 – 28,115 m³
18 Dec 2025, 14:29Thornham WwTW1.3 days4,391 – 27,678 m³
5 Dec 2025, 17:37Thornham WwTW1.0 days3,557 – 22,417 m³
27 Jan 2025, 14:32Thornham WwTW1.0 days3,444 – 21,708 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate130,207 m³range 51,864 – 326,890 m³
In litres130.2 millionrange 51.9 million – 326.9 million L
Olympic swimming pools52at 2,500 m³ each
Organic load, as people's raw sewage195,311person-days of untreated BOD

Assumed spill rate while spilling: 39.9 – 251.3 L/s (central 100.1 L/s), from a dry-weather flow of 39.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,075 kg11,719 kg65,378 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 5,446 kg55,338 kg235,688 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 99 kg820 kg3,040 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 62 kg339 kg1,765 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 5.2 trillion organisms130.2 trillion organisms3.3 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Thornham WwTW

Storm tank at sewage works · discharges to Chichester Hbr via Little Deep

Spills 2025
21 (237 hours) · down 60% on 2024
Spills 2024
52 (602 hours)
Long-term average
33.8 spills a year (monitored since 2016)
Monitor uptime
100% of the year
Investigation
UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing, Bathing Water and/or Shellfish Water improvement ongoing
Shellfish water
Chichester Harbour (Chichester Channel); Chichester Harbour (Emsworth Channel); Chichester Harbour (Thornham Channel); Langstone Harbour
WFD catchment
Great Deep (GB610070074000)
Outlet location
SU7582004730 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00872 · W00354 · company name: THORNHAM SSO - 115369

Thornham WwTW

Inlet overflow at sewage works · discharges to Chichester Hbr via Little Deep

Spills 2025
12 (119 hours) · up 100% on 2024
Spills 2024
6 (52 hours)
Long-term average
2.2 spills a year (monitored since 2016)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Shellfish water
Chichester Harbour (Chichester Channel); Chichester Harbour (Emsworth Channel); Chichester Harbour (Thornham Channel); Langstone Harbour
WFD catchment
Great Deep (GB610070074000)
Outlet location
SU7582004730 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00871 · W00354 · company name: THORNHAM INLET CEO - 115371

Thornham WwTW

Inlet overflow at sewage works · discharges to Chichester Hbr via Little Deep

Spills 2025
4 (5.9 hours) · down 20% on 2024
Spills 2024
5 (28 hours)
Long-term average
3.7 spills a year (monitored since 2016)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Shellfish water
Chichester Harbour (Chichester Channel); Chichester Harbour (Emsworth Channel); Chichester Harbour (Thornham Channel); Langstone Harbour
WFD catchment
Great Deep (GB610070074000)
Outlet location
SU7582004730 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00870 · W00354 · company name: THORNHAM FORMULA A CSO - 115370

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Southern Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.