Storm overflow register · Southern Water

Tunbridge Wells South sewage works: storm overflow spills 2025

Tunbridge Wells South sewage treatment works, run by Southern Water, has 2 monitored storm overflows discharging to The River Grom. In 2025 they recorded 102 spills totalling 703 hours, against 160 spills and 1,539 hours in 2024. By hours spilling, it ranks 25 of 215 Southern Water works, where 1 spilled longest.

Works size: 31,503 population equivalent (TUNBRIDGE WELLS South STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecTunbridge Wells South…1 Jan 2025 15:17 GMT, 23.7 h5 Jan 2025 02:03 GMT, 51.9 h7 Jan 2025 06:15 GMT, 5.3 h7 Jan 2025 11:45 GMT, 3.3 h7 Jan 2025 15:45 GMT, 2.5 h7 Jan 2025 19:00 GMT, 3 h7 Jan 2025 23:00 GMT, 2 h8 Jan 2025 09:30 GMT, 45 min8 Jan 2025 11:15 GMT, 105 min8 Jan 2025 14:30 GMT, 90 min8 Jan 2025 17:15 GMT, 6.8 h9 Jan 2025 01:00 GMT, 105 min9 Jan 2025 04:30 GMT, 75 min9 Jan 2025 06:45 GMT, 3 h9 Jan 2025 10:15 GMT, 3 h9 Jan 2025 14:15 GMT, 2 h9 Jan 2025 17:30 GMT, 105 min9 Jan 2025 20:30 GMT, 105 min9 Jan 2025 23:45 GMT, 45 min23 Jan 2025 15:16 GMT, 16 min24 Jan 2025 06:05 GMT, 17.8 h26 Jan 2025 14:17 GMT, 36.2 h28 Jan 2025 03:02 GMT, 21.3 h29 Jan 2025 01:17 GMT, 90 min29 Jan 2025 08:38 GMT, 4.5 h29 Jan 2025 14:09 GMT, 101 min29 Jan 2025 17:25 GMT, 83 min29 Jan 2025 19:46 GMT, 2.4 h29 Jan 2025 22:59 GMT, 103 min31 Jan 2025 09:10 GMT, 4.2 h31 Jan 2025 14:14 GMT, 3.6 h31 Jan 2025 18:38 GMT, 2.1 h31 Jan 2025 21:47 GMT, 99 min1 Feb 2025 01:25 GMT, 4 min9 Feb 2025 20:14 GMT, 8 h10 Feb 2025 05:30 GMT, 75 min10 Feb 2025 08:15 GMT, 2.5 h10 Feb 2025 11:45 GMT, 105 min10 Feb 2025 14:45 GMT, 11.5 h11 Feb 2025 03:30 GMT, 90 min11 Feb 2025 06:30 GMT, 105 min11 Feb 2025 09:00 GMT, 2.5 h11 Feb 2025 12:45 GMT, 90 min11 Feb 2025 15:45 GMT, 75 min11 Feb 2025 18:30 GMT, 105 min11 Feb 2025 21:30 GMT, 105 min20 Feb 2025 20:27 GMT, 107 min20 Feb 2025 23:30 GMT, 75 min21 Feb 2025 02:00 GMT, 45 min21 Feb 2025 05:15 GMT, 15 min21 Feb 2025 08:15 GMT, 45 min21 Feb 2025 09:15 GMT, 2 h21 Feb 2025 12:15 GMT, 75 min21 Feb 2025 14:45 GMT, 30 min21 Feb 2025 17:45 GMT, 22 h22 Feb 2025 16:15 GMT, 30 min22 Feb 2025 20:45 GMT, 15 min23 Feb 2025 10:30 GMT, 90 min23 Feb 2025 13:45 GMT, 15 min23 Feb 2025 20:00 GMT, 3.8 h24 Feb 2025 01:30 GMT, 25.8 h25 Feb 2025 03:30 GMT, 15 min25 Feb 2025 04:30 GMT, 15 min25 Feb 2025 05:30 GMT, 15 min25 Feb 2025 07:30 GMT, 6.8 h25 Feb 2025 14:30 GMT, 45 min25 Feb 2025 15:30 GMT, 105 min25 Feb 2025 17:45 GMT, 15 min25 Feb 2025 18:45 GMT, 15 min25 Feb 2025 19:15 GMT, 4 h25 Feb 2025 23:30 GMT, 15 min26 Feb 2025 02:15 GMT, 4.8 h26 Feb 2025 12:19 GMT, 12.6 h27 Feb 2025 08:05 GMT, 6.1 h27 Feb 2025 18:56 GMT, 2.5 h15 Apr 2025 06:10 GMT, 8.5 h23 Apr 2025 06:04 GMT, 8.4 h6 Jul 2025 16:43 GMT, 2.2 h7 Jul 2025 05:19 GMT, 4.4 h19 Jul 2025 13:21 GMT, 71 min21 Jul 2025 02:33 GMT, 9 h3 Sep 2025 04:09 GMT, 16.7 h4 Sep 2025 08:52 GMT, 5.2 h4 Oct 2025 00:43 GMT, 4.5 h20 Oct 2025 13:38 GMT, 9.8 h22 Oct 2025 22:00 GMT, 17.6 h29 Oct 2025 16:41 GMT, 5.6 h2 Nov 2025 08:59 GMT, 5.9 h10 Nov 2025 12:00 GMT, 55 min10 Nov 2025 14:02 GMT, 4.5 h1 Dec 2025 13:55 GMT, 4.9 h1 Dec 2025 19:46 GMT, 9.5 h2 Dec 2025 21:38 GMT, 2.3 h2 Dec 2025 23:59 GMT, 3 min4 Dec 2025 12:57 GMT, 3.8 h5 Dec 2025 21:21 GMT, 18.5 h6 Dec 2025 15:59 GMT, 11 min6 Dec 2025 16:11 GMT, 3 min7 Dec 2025 14:07 GMT, 7 h9 Dec 2025 05:33 GMT, 8.4 h18 Dec 2025 12:19 GMT, 16.2 h21 Dec 2025 23:23 GMT, 2.9 h22 Dec 2025 02:19 GMT, 5 minTunbridge Wells South…1 Jan 2025 14:08 GMT, 7.2 h5 Jan 2025 00:59 GMT, 35.1 h23 Jan 2025 14:52 GMT, 37 min24 Jan 2025 05:06 GMT, 5.6 h26 Jan 2025 13:34 GMT, 7.5 h26 Jan 2025 23:26 GMT, 5.8 h28 Jan 2025 10:30 GMT, 69 min31 Jan 2025 08:53 GMT, 56 min9 Feb 2025 20:49 GMT, 3.8 h22 Feb 2025 00:56 GMT, 25 min24 Feb 2025 02:44 GMT, 9.4 h26 Feb 2025 12:58 GMT, 35 min26 Feb 2025 14:58 GMT, 68 min15 Apr 2025 03:29 GMT, 25 min15 Apr 2025 06:32 GMT, 38 min24 May 2025 06:13 GMT, 53 min5 Jun 2025 08:48 GMT, 21 min7 Jun 2025 17:52 GMT, 117 min6 Jul 2025 15:01 GMT, 100 min7 Jul 2025 05:02 GMT, 8.1 h8 Jul 2025 01:39 GMT, 51 min19 Jul 2025 06:03 GMT, 69 min21 Jul 2025 03:59 GMT, 3.4 h24 Jul 2025 16:22 GMT, 18 min26 Jul 2025 21:08 GMT, 57 min31 Jul 2025 11:31 GMT, 15 min29 Aug 2025 08:01 GMT, 88 min1 Sep 2025 13:37 GMT, 55 min2 Sep 2025 15:33 GMT, 23 min3 Sep 2025 03:34 GMT, 2.4 h3 Sep 2025 08:59 GMT, 33 min3 Sep 2025 12:03 GMT, 2.8 h4 Sep 2025 08:15 GMT, 59 min10 Sep 2025 13:48 GMT, 48 min10 Sep 2025 19:54 GMT, 38 min13 Sep 2025 05:19 GMT, 62 min13 Sep 2025 09:44 GMT, 63 min15 Sep 2025 16:04 GMT, 38 min3 Oct 2025 23:14 GMT, 3.9 h20 Oct 2025 13:34 GMT, 3.9 h20 Oct 2025 18:17 GMT, 2.3 h22 Oct 2025 19:10 GMT, 6.2 h23 Oct 2025 05:06 GMT, 4.9 h29 Oct 2025 09:22 GMT, 28 min2 Nov 2025 07:02 GMT, 34 min2 Nov 2025 07:48 GMT, 3 h10 Nov 2025 10:17 GMT, 43 min10 Nov 2025 14:03 GMT, 83 min29 Nov 2025 12:22 GMT, 64 min2 Dec 2025 00:10 GMT, 62 min2 Dec 2025 21:13 GMT, 53 min4 Dec 2025 09:53 GMT, 32 min4 Dec 2025 13:03 GMT, 52 min5 Dec 2025 19:17 GMT, 4.1 h6 Dec 2025 02:08 GMT, 2.2 h6 Dec 2025 04:53 GMT, 35 min7 Dec 2025 13:45 GMT, 85 min9 Dec 2025 05:21 GMT, 96 min18 Dec 2025 05:30 GMT, 23 min18 Dec 2025 11:59 GMT, 10.1 h21 Dec 2025 18:20 GMT, 37 min21 Dec 2025 23:01 GMT, 46 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300k400kJan 2025: 282 h spilling ≈ 152,112 m³ (range 60,589–381,882 m³)JanFeb 2025: 156 h spilling ≈ 84,045 m³ (range 33,477–210,997 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 18 h spilling ≈ 9,716 m³ (range 3,870–24,393 m³)AprMay 2025: 0.9 h spilling ≈ 486 m³ (range 194–1,220 m³)MayJun 2025: 2.3 h spilling ≈ 1,242 m³ (range 495–3,117 m³)JunJul 2025: 33 h spilling ≈ 18,029 m³ (range 7,181–45,262 m³)JulAug 2025: 1.5 h spilling ≈ 810 m³ (range 323–2,033 m³)AugSep 2025: 34 h spilling ≈ 18,407 m³ (range 7,332–46,211 m³)SepOct 2025: 59 h spilling ≈ 31,901 m³ (range 12,707–80,090 m³)OctNov 2025: 18 h spilling ≈ 9,662 m³ (range 3,849–24,257 m³)NovDec 2025: 99 h spilling ≈ 53,331 m³ (range 21,243–133,889 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 02:03Tunbridge Wells South WwTW2.2 days11,166 – 70,378 m³
26 Jan 2025, 14:17Tunbridge Wells South WwTW1.5 days7,790 – 49,102 m³
5 Jan 2025, 00:59Tunbridge Wells South WwTW1.5 days7,554 – 47,611 m³
24 Feb 2025, 01:30Tunbridge Wells South WwTW1.1 days5,536 – 34,895 m³
1 Jan 2025, 15:17Tunbridge Wells South WwTW23.7 h5,096 – 32,117 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate379,685 m³range 151,237 – 953,215 m³
In litres379.7 millionrange 151.2 million – 953.2 million L
Olympic swimming pools152at 2,500 m³ each
Organic load, as people's raw sewage569,528person-days of untreated BOD

Assumed spill rate while spilling: 59.7 – 376.4 L/s (central 149.9 L/s), from a dry-weather flow of 59.7 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 6,049 kg34,172 kg190,643 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 15,880 kg161,366 kg687,268 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 287 kg2,392 kg8,865 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 181 kg987 kg5,147 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 15.1 trillion organisms379.7 trillion organisms9.5 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Tunbridge Wells South WwTW

Storm tank at sewage works · discharges to The River Grom

Spills 2025
52 (536 hours) · down 43% on 2024
Spills 2024
91 (1,238 hours)
Long-term average
82.2 spills a year (monitored since 2016)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Grom (GB106040018400)
Outlet location
TQ5269037420 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00888 · A00200 · company name: TUNBRIDGE WELLS SOUTH SSO - 115447

Tunbridge Wells South WwTW

Inlet overflow at sewage works · discharges to The River Grom

Spills 2025
50 (167 hours) · down 28% on 2024
Spills 2024
69 (300 hours)
Long-term average
60.9 spills a year (monitored since 2016)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Grom (GB106040018400)
Outlet location
TQ5269037420 (OS grid reference) · View on Apple Maps
EA ID / permit
SWS00887 · A00200 · company name: TUNBRIDGE WELLS SOUTH CSO - 115448

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Southern Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.