Heyford sewage works: storm overflow spills 2025

Heyford sewage treatment works, run by Thames Water, has 1 monitored storm overflow discharging to Cherwell. In 2025 it recorded 33 spills totalling 303 hours, against 108 spills and 1,264 hours in 2024. By hours spilling, it ranks 102 of 233 Thames Water works, where 1 spilled longest.

Works size: 2,511 population equivalent (Heyford STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecHeyford Wastewater…5 Jan 2025 12:00 GMT, 37 h7 Jan 2025 01:45 GMT, 2.5 h7 Jan 2025 05:15 GMT, 7 h7 Jan 2025 13:15 GMT, 30 min7 Jan 2025 17:00 GMT, 6.8 h8 Jan 2025 07:15 GMT, 3.3 h8 Jan 2025 18:30 GMT, 3.5 h8 Jan 2025 22:30 GMT, 75 min9 Jan 2025 07:45 GMT, 2 h9 Jan 2025 18:45 GMT, 60 min27 Jan 2025 00:45 GMT, 13.8 h27 Jan 2025 15:45 GMT, 60 min27 Jan 2025 18:45 GMT, 5.5 h28 Jan 2025 02:30 GMT, 45 min28 Jan 2025 07:15 GMT, 5.3 h28 Jan 2025 15:00 GMT, 60 min28 Jan 2025 20:15 GMT, 2.5 h29 Jan 2025 08:00 GMT, 2 h31 Jan 2025 04:15 GMT, 30 min26 Feb 2025 11:45 GMT, 60 min23 Apr 2025 02:45 GMT, 5 h14 Sep 2025 20:00 GMT, 30 min10 Nov 2025 11:00 GMT, 4 h14 Nov 2025 00:15 GMT, 39.5 h15 Nov 2025 16:30 GMT, 3.3 h1 Dec 2025 22:15 GMT, 2.8 h2 Dec 2025 07:45 GMT, 30 min2 Dec 2025 16:15 GMT, 75 min2 Dec 2025 18:15 GMT, 105 min4 Dec 2025 10:45 GMT, 4.5 h4 Dec 2025 18:30 GMT, 105 min5 Dec 2025 17:45 GMT, 4 h5 Dec 2025 22:45 GMT, 30 min7 Dec 2025 14:15 GMT, 75 min7 Dec 2025 16:15 GMT, 60 min7 Dec 2025 18:45 GMT, 2 h9 Dec 2025 02:00 GMT, 23.8 h10 Dec 2025 02:45 GMT, 60 min10 Dec 2025 06:45 GMT, 5.3 h10 Dec 2025 18:15 GMT, 3.5 h11 Dec 2025 08:30 GMT, 75 min11 Dec 2025 11:15 GMT, 30 min16 Dec 2025 06:15 GMT, 8.5 h16 Dec 2025 15:45 GMT, 7.8 h17 Dec 2025 07:30 GMT, 3.3 h17 Dec 2025 23:00 GMT, 2.8 h18 Dec 2025 07:45 GMT, 75 min18 Dec 2025 09:30 GMT, 60 min18 Dec 2025 11:15 GMT, 39.5 h20 Dec 2025 07:30 GMT, 13.8 h20 Dec 2025 22:30 GMT, 75 min21 Dec 2025 09:15 GMT, 4.5 h21 Dec 2025 17:45 GMT, 7 h22 Dec 2025 09:15 GMT, 2.5 h22 Dec 2025 12:15 GMT, 45 min22 Dec 2025 19:00 GMT, 60 min22 Dec 2025 21:15 GMT, 60 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

05,00010k15k20kJan 2025: 97 h spilling ≈ 4,173 m³ (range 1,662–10,477 m³)JanFeb 2025: 1.0 h spilling ≈ 43 m³ (range 17–108 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 5.0 h spilling ≈ 215 m³ (range 86–540 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.5 h spilling ≈ 22 m³ (range 8.6–54 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 47 h spilling ≈ 2,014 m³ (range 802–5,055 m³)NovDec 2025: 152 h spilling ≈ 6,548 m³ (range 2,608–16,440 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
18 Dec 2025, 11:15Heyford Wastewater Treatment Works1.6 days677 – 4,267 m³
14 Nov 2025, 00:15Heyford Wastewater Treatment Works1.6 days677 – 4,267 m³
5 Jan 2025, 12:00Heyford Wastewater Treatment Works1.5 days634 – 3,997 m³
9 Dec 2025, 02:00Heyford Wastewater Treatment Works23.8 h407 – 2,565 m³
20 Dec 2025, 07:30Heyford Wastewater Treatment Works13.8 h236 – 1,485 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate13,015 m³range 5,184 – 32,674 m³
In litres13.0 millionrange 5.2 million – 32.7 million L
Olympic swimming pools5.2at 2,500 m³ each
Organic load, as people's raw sewage19,522person-days of untreated BOD

Assumed spill rate while spilling: 4.8 – 30.0 L/s (central 12.0 L/s), from a dry-weather flow of 4.8 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 207 kg1,171 kg6,535 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 544 kg5,531 kg23,558 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 9.8 kg82 kg304 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 6.2 kg34 kg176 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 518.4 billion organisms13.0 trillion organisms326.7 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Heyford Wastewater Treatment Works

Storm tank at sewage works · discharges to Cherwell

Spills 2025
33 (303 hours) · down 69% on 2024
Spills 2024
108 (1,264 hours)
Long-term average
38.6 spills a year (monitored since 2018)
Monitor uptime
95% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Cherwell (Nell Bridge to Bletchingdon) (GB106039037431)
Outlet location
SP4928025430 (OS grid reference) · View on Apple Maps
EA ID / permit
TWL00223 · TEMP.2658 · company name: Upper Heyford STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Thames Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.