Marlborough sewage treatment works, run by Thames Water, has 1 monitored storm overflow discharging to Kennet. In 2025 it recorded 96 spills totalling 1,557 hours, against 172 spills and 2,786 hours in 2024. By hours spilling, it ranks 11 of 233 Thames Water works, where 1 spilled longest.

Works size: 10,213 population equivalent (MARLBOROUGH, MARLBOROUGH, WILTS STW", UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecMarlborough WwTW67 spills, 171.5 h, 1 Jan to 14 Jan12 spills, 11 h, 15 Jan to 17 Jan256 spills, 1348.5 h, 20 Jan to 30 Mar10 spills, 11.5 h, 31 Mar to 2 Apr16 spills, 14.5 h, 3 Apr to 7 Apr

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

0100k200k300kJan 2025: 456 h spilling ≈ 79,832 m³ (range 31,799-200,422 m³)JanFeb 2025: 619 h spilling ≈ 108,286 m³ (range 43,133-271,857 m³)FebMar 2025: 459 h spilling ≈ 80,287 m³ (range 31,980-201,564 m³)MarApr 2025: 23 h spilling ≈ 4,060 m³ (range 1,617-10,192 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)OctNov 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)NovDec 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
26 Jan 2025, 09:30Marlborough WwTW5.7 days9,497 - 59,859 m³
9 Feb 2025, 07:15Marlborough WwTW3.4 days5,698 - 35,915 m³
4 Jan 2025, 23:30Marlborough WwTW3.1 days5,141 - 32,401 m³
23 Feb 2025, 08:30Marlborough WwTW2.7 days4,566 - 28,776 m³
23 Jan 2025, 05:30Marlborough WwTW2.1 days3,450 - 21,747 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate272,466 m³range 108,529 - 684,036 m³
In litres272.5 millionrange 108.5 million - 684.0 million L
Olympic swimming pools109at 2,500 m³ each
Organic load, as people's raw sewage408,698person-days of untreated BOD

Assumed spill rate while spilling: 19.4 - 122.0 L/s (central 48.6 L/s), from a dry-weather flow of 19.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 4,341 kg24,522 kg136,807 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 11,396 kg115,798 kg493,190 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 206 kg1,717 kg6,362 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 130 kg708 kg3,694 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 10.9 trillion organisms272.5 trillion organisms6.8 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Marlborough WwTW

Storm tank at sewage works · discharges to Kennet

Spills 2025
96 (1,557 hours) · down 44% on 2024
Spills 2024
172 (2,786 hours)
Long-term average
90.0 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - GW inundation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Middle Kennet (Marlborough to Hungerford) (GB106039023173)
Outlet location
SU2012069200 (OS grid reference) · View on Apple Maps
EA ID / permit
TWL00293 · TEMP.2763 · company name: Marlborough STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Thames Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.