Wanborough sewage treatment works, run by Thames Water, has 1 monitored storm overflow discharging to Danes Brook. In 2025 it recorded 68 spills totalling 822 hours, against 150 spills and 2,859 hours in 2024. By hours spilling, it ranks 33 of 233 Thames Water works, where 1 spilled longest.

Works size: 2,148 population equivalent (WANBOROUGH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWanborough WwTW1 Jan 2025 23:00 GMT, 30 min5 Jan 2025 05:00 GMT, 59.5 h8 Jan 2025 10:15 GMT, 14.8 h9 Jan 2025 01:30 GMT, 30 min9 Jan 2025 03:00 GMT, 30 min9 Jan 2025 04:30 GMT, 30 min9 Jan 2025 07:00 GMT, 4 h9 Jan 2025 11:30 GMT, 45 min9 Jan 2025 14:00 GMT, 30 min9 Jan 2025 16:45 GMT, 5.3 h9 Jan 2025 23:00 GMT, 45 min10 Jan 2025 10:00 GMT, 105 min10 Jan 2025 13:30 GMT, 2.3 h10 Jan 2025 20:00 GMT, 60 min10 Jan 2025 23:15 GMT, 30 min24 Jan 2025 11:00 GMT, 90 min24 Jan 2025 13:00 GMT, 75 min24 Jan 2025 15:45 GMT, 5.5 h24 Jan 2025 22:30 GMT, 90 min25 Jan 2025 02:15 GMT, 30 min25 Jan 2025 09:45 GMT, 2 h26 Jan 2025 12:30 GMT, 90 min26 Jan 2025 14:30 GMT, 135 h1 Feb 2025 06:00 GMT, 23.8 h2 Feb 2025 07:15 GMT, 18.3 h3 Feb 2025 04:15 GMT, 9.3 h3 Feb 2025 17:45 GMT, 2 h3 Feb 2025 21:30 GMT, 4 h4 Feb 2025 07:15 GMT, 2.5 h4 Feb 2025 12:15 GMT, 45 min4 Feb 2025 16:15 GMT, 30 min4 Feb 2025 20:15 GMT, 45 min4 Feb 2025 22:15 GMT, 30 min5 Feb 2025 10:15 GMT, 45 min5 Feb 2025 16:15 GMT, 45 min5 Feb 2025 19:00 GMT, 30 min5 Feb 2025 22:30 GMT, 60 min6 Feb 2025 15:45 GMT, 30 min7 Feb 2025 20:00 GMT, 5 h8 Feb 2025 11:30 GMT, 105 min8 Feb 2025 13:45 GMT, 105 min8 Feb 2025 17:00 GMT, 30 min9 Feb 2025 21:00 GMT, 43.8 h11 Feb 2025 17:15 GMT, 8.5 h12 Feb 2025 03:45 GMT, 2.3 h12 Feb 2025 07:45 GMT, 6.8 h12 Feb 2025 15:45 GMT, 2 h12 Feb 2025 18:15 GMT, 7.3 h13 Feb 2025 07:30 GMT, 2.3 h13 Feb 2025 11:15 GMT, 60 min13 Feb 2025 14:30 GMT, 60 min13 Feb 2025 17:00 GMT, 30 min13 Feb 2025 20:15 GMT, 75 min13 Feb 2025 22:00 GMT, 90 min14 Feb 2025 10:45 GMT, 75 min15 Feb 2025 12:00 GMT, 4.3 h15 Feb 2025 20:30 GMT, 30 min15 Feb 2025 22:45 GMT, 60 min16 Feb 2025 12:45 GMT, 45 min17 Feb 2025 05:30 GMT, 3.3 h23 Feb 2025 22:45 GMT, 51 h26 Feb 2025 07:45 GMT, 51.5 h28 Feb 2025 12:00 GMT, 5.3 h28 Feb 2025 18:00 GMT, 7.5 h1 Mar 2025 08:00 GMT, 2.8 h1 Mar 2025 18:45 GMT, 30 min1 Mar 2025 20:00 GMT, 60 min1 Mar 2025 22:45 GMT, 60 min2 Mar 2025 11:00 GMT, 30 min2 Mar 2025 20:30 GMT, 30 min2 Mar 2025 22:00 GMT, 90 min3 Mar 2025 10:15 GMT, 45 min3 Mar 2025 18:00 GMT, 9.5 h4 Mar 2025 04:30 GMT, 60 min4 Mar 2025 06:30 GMT, 3.8 h4 Mar 2025 12:30 GMT, 3.5 h5 Mar 2025 09:15 GMT, 2.8 h5 Mar 2025 12:45 GMT, 2.5 h14 Mar 2025 08:30 GMT, 3 h10 Nov 2025 10:45 GMT, 8.3 h10 Nov 2025 20:45 GMT, 30 min14 Nov 2025 07:00 GMT, 30.8 h15 Nov 2025 14:15 GMT, 60 min15 Nov 2025 17:30 GMT, 30 min29 Nov 2025 13:45 GMT, 60 min1 Dec 2025 17:15 GMT, 18.8 h2 Dec 2025 15:15 GMT, 75 min2 Dec 2025 18:45 GMT, 90 min4 Dec 2025 11:00 GMT, 60 min5 Dec 2025 18:00 GMT, 5.5 h6 Dec 2025 09:15 GMT, 4 h7 Dec 2025 12:30 GMT, 5 h7 Dec 2025 18:15 GMT, 2.8 h7 Dec 2025 21:30 GMT, 2.5 h8 Dec 2025 07:30 GMT, 2.5 h8 Dec 2025 21:00 GMT, 30 min9 Dec 2025 00:00 GMT, 26 h10 Dec 2025 02:30 GMT, 75 min10 Dec 2025 04:15 GMT, 2 h10 Dec 2025 06:45 GMT, 4.3 h10 Dec 2025 11:30 GMT, 30 min10 Dec 2025 13:45 GMT, 75 min10 Dec 2025 16:45 GMT, 105 min10 Dec 2025 19:00 GMT, 3.5 h11 Dec 2025 08:30 GMT, 75 min15 Dec 2025 22:00 GMT, 27.3 h17 Dec 2025 03:00 GMT, 60 min17 Dec 2025 05:45 GMT, 3 h17 Dec 2025 09:15 GMT, 3.3 h17 Dec 2025 13:00 GMT, 90 min17 Dec 2025 15:00 GMT, 30 min17 Dec 2025 19:00 GMT, 30 min17 Dec 2025 20:45 GMT, 30 min17 Dec 2025 22:30 GMT, 76 h21 Dec 2025 08:45 GMT, 11 h21 Dec 2025 20:15 GMT, 2.3 h21 Dec 2025 23:00 GMT, 2 h22 Dec 2025 01:30 GMT, 30 min22 Dec 2025 07:45 GMT, 30 min22 Dec 2025 08:45 GMT, 75 min22 Dec 2025 10:30 GMT, 2 h22 Dec 2025 13:45 GMT, 30 min22 Dec 2025 15:15 GMT, 30 min22 Dec 2025 18:15 GMT, 30 min22 Dec 2025 21:30 GMT, 60 min23 Dec 2025 09:45 GMT, 30 min23 Dec 2025 11:15 GMT, 30 min23 Dec 2025 14:45 GMT, 60 min23 Dec 2025 19:30 GMT, 30 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

010k20k30kJan 2025: 236 h spilling ≈ 8,693 m³ (range 3,463–21,825 m³)JanFeb 2025: 283 h spilling ≈ 10,416 m³ (range 4,149–26,149 m³)FebMar 2025: 36 h spilling ≈ 1,325 m³ (range 528–3,326 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 42 h spilling ≈ 1,546 m³ (range 616–3,881 m³)NovDec 2025: 225 h spilling ≈ 8,281 m³ (range 3,299–20,790 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
26 Jan 2025, 14:30Wanborough WwTW5.6 days1,979 – 12,474 m³
17 Dec 2025, 22:30Wanborough WwTW3.2 days1,114 – 7,022 m³
5 Jan 2025, 05:00Wanborough WwTW2.5 days872 – 5,498 m³
26 Feb 2025, 07:45Wanborough WwTW2.1 days755 – 4,759 m³
23 Feb 2025, 22:45Wanborough WwTW2.1 days748 – 4,712 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate30,261 m³range 12,054 – 75,971 m³
In litres30.3 millionrange 12.1 million – 76.0 million L
Olympic swimming pools12at 2,500 m³ each
Organic load, as people's raw sewage45,391person-days of untreated BOD

Assumed spill rate while spilling: 4.1 – 25.7 L/s (central 10.2 L/s), from a dry-weather flow of 4.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 482 kg2,723 kg15,194 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 1,266 kg12,861 kg54,775 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 23 kg191 kg707 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 14 kg79 kg410 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 1.2 trillion organisms30.3 trillion organisms759.7 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Wanborough WwTW

Storm tank at sewage works · discharges to Danes Brook

Spills 2025
68 (822 hours) · down 55% on 2024
Spills 2024
150 (2,859 hours)
Long-term average
68.9 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - GW inundation
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Liden Brook, Swindon (GB106039022860)
Outlet location
SU2016084500 (OS grid reference) · View on Apple Maps
EA ID / permit
TWL00422 · CSSC.2327 · company name: Wanborough STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Thames Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.