Storm overflow register · Thames Water

Woking sewage works: storm overflow spills 2025

Woking sewage treatment works, run by Thames Water, has 1 monitored storm overflow discharging to River Wey. In 2025 it recorded 10 spills totalling 125 hours, against 35 spills and 359 hours in 2024. By hours spilling, it ranks 154 of 233 Thames Water works, where 1 spilled longest.

Works size: 78,319 population equivalent (WOKING STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWoking Wastewater…5 Jan 2025 06:30 GMT, 45 h7 Jan 2025 11:00 GMT, 5 h7 Jan 2025 21:30 GMT, 2 h26 Jan 2025 17:15 GMT, 34 h28 Jan 2025 09:15 GMT, 30 min28 Jan 2025 11:00 GMT, 5.8 h28 Jan 2025 18:00 GMT, 6 h24 Feb 2025 08:15 GMT, 17.3 h18 Dec 2025 15:15 GMT, 9.5 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300k400kJan 2025: 98 h spilling ≈ 131,780 m³ (range 52,491–330,838 m³)JanFeb 2025: 17 h spilling ≈ 23,082 m³ (range 9,194–57,947 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)NovDec 2025: 9.5 h spilling ≈ 12,749 m³ (range 5,078–32,006 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 06:30Woking Wastewater Treatment Works1.9 days24,054 – 151,606 m³
26 Jan 2025, 17:15Woking Wastewater Treatment Works1.4 days18,174 – 114,547 m³
24 Feb 2025, 08:15Woking Wastewater Treatment Works17.3 h9,221 – 58,116 m³
18 Dec 2025, 15:15Woking Wastewater Treatment Works9.5 h5,078 – 32,006 m³
28 Jan 2025, 18:00Woking Wastewater Treatment Works6.0 h3,207 – 20,214 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate167,744 m³range 66,816 – 421,128 m³
In litres167.7 millionrange 66.8 million – 421.1 million L
Olympic swimming pools67at 2,500 m³ each
Organic load, as people's raw sewage251,616person-days of untreated BOD

Assumed spill rate while spilling: 148.5 – 935.8 L/s (central 372.8 L/s), from a dry-weather flow of 148.5 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,673 kg15,097 kg84,226 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 7,016 kg71,291 kg303,633 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 127 kg1,057 kg3,916 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 80 kg436 kg2,274 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 6.7 trillion organisms167.7 trillion organisms4.2 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Woking Wastewater Treatment Works

Storm tank at sewage works · discharges to River Wey

Spills 2025
10 (125 hours) · down 71% on 2024
Spills 2024
35 (359 hours)
Long-term average
18.7 spills a year (monitored since 2019)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Hoe Stream (Pirbright to River Wey confluence at Woking) (GB106039017900)
Outlet location
TQ0327057520 (OS grid reference) · View on Apple Maps
EA ID / permit
TWL00458 · CASM.0308 · company name: Woking STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Thames Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.