Storm overflow register · United Utilities

Bromborough sewage works: storm overflow spills 2025

Bromborough sewage treatment works, run by United Utilities, has 2 monitored storm overflows discharging to Mersey Estuary. In 2025 they recorded 216 spills totalling 2,092 hours, against 325 spills and 3,636 hours in 2024. By hours spilling, it ranks 8 of 289 United Utilities works, where 1 spilled longest.

Works size: 92,435 population equivalent (BROMBOROUGH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBromborough WwTW12 spills, 343 h, 1 Jan to 15 Jan42 spills, 202.4 h, 21 Jan to 2 Feb20 Feb 2025 15:25 GMT, 2.4 h23 Feb 2025 20:26 GMT, 109 min2 spills, 13.5 h, 23 Mar to 23 Mar2 spills, 4.3 h, 21 Apr to 21 Apr18 spills, 10.1 h, 23 Apr to 23 Apr24 May 2025 02:17 GMT, 2.5 h8 spills, 32.6 h, 26 May to 29 May2 spills, 4.5 h, 3 Jun to 3 Jun3 spills, 9.8 h, 5 Jun to 5 Jun5 spills, 17.3 h, 13 Jun to 14 Jun2 spills, 4.7 h, 24 Jun to 25 Jun6 Jul 2025 06:57 GMT, 4.2 h20 Jul 2025 17:52 GMT, 5.3 h2 spills, 2.6 h, 22 Jul to 22 Jul24 Jul 2025 03:55 GMT, 54 min31 Jul 2025 02:05 GMT, 3.6 h4 Aug 2025 12:13 GMT, 2 h1 Sep 2025 12:41 GMT, 5 h2 Sep 2025 22:23 GMT, 3.2 h7 Sep 2025 14:11 GMT, 4.4 h2 spills, 11 h, 10 Sep to 11 Sep7 spills, 11.7 h, 13 Sep to 14 Sep17 Sep 2025 02:41 GMT, 19.2 h20 Sep 2025 07:16 GMT, 38.5 h27 Sep 2025 23:06 GMT, 3.5 h1 Oct 2025 07:02 GMT, 4 h3 spills, 27.2 h, 3 Oct to 4 Oct2 spills, 5.3 h, 19 Oct to 19 Oct2 spills, 11.8 h, 21 Oct to 22 Oct4 spills, 10.8 h, 23 Oct to 24 Oct5 spills, 12.3 h, 26 Oct to 28 Oct29 Oct 2025 23:34 GMT, 2.6 h11 spills, 27.9 h, 1 Nov to 2 Nov11 spills, 29.1 h, 4 Nov to 6 Nov20 spills, 141.3 h, 9 Nov to 17 Nov18 Nov 2025 16:02 GMT, 55.7 h8 spills, 59.9 h, 22 Nov to 24 Nov8 spills, 18.8 h, 28 Nov to 29 Nov8 spills, 38.1 h, 1 Dec to 3 Dec18 spills, 93.4 h, 4 Dec to 10 Dec12 Dec 2025 13:30 GMT, 26 min12 spills, 114 h, 14 Dec to 19 Dec6 spills, 10.2 h, 22 Dec to 22 DecBromborough WwTW2 spills, 30.7 h, 1 Jan to 2 Jan2 spills, 16.1 h, 3 Jan to 4 Jan3 spills, 107.3 h, 4 Jan to 9 Jan12 Jan 2025 02:57 GMT, 30 min21 Jan 2025 15:19 GMT, 7.4 h3 spills, 21.2 h, 22 Jan to 24 Jan3 spills, 11.5 h, 26 Jan to 27 Jan31 Jan 2025 00:45 GMT, 9.7 h20 Feb 2025 12:38 GMT, 96 min23 Mar 2025 03:09 GMT, 4.6 h21 Apr 2025 14:59 GMT, 61 min23 Apr 2025 00:25 GMT, 4.6 h23 May 2025 23:54 GMT, 2 h5 spills, 19.6 h, 26 May to 29 May2 spills, 2.7 h, 3 Jun to 3 Jun3 spills, 5.9 h, 5 Jun to 5 Jun3 spills, 10.5 h, 13 Jun to 14 Jun22 Jun 2025 19:20 GMT, 50 min24 Jun 2025 06:12 GMT, 2.6 h4 Jul 2025 21:24 GMT, 54 min6 Jul 2025 04:13 GMT, 2.5 h2 spills, 3.8 h, 20 Jul to 20 Jul22 Jul 2025 00:38 GMT, 100 min30 Jul 2025 23:52 GMT, 3.5 h4 Aug 2025 11:35 GMT, 69 min1 Sep 2025 10:23 GMT, 5.2 h2 Sep 2025 22:04 GMT, 96 min7 Sep 2025 12:22 GMT, 4.4 h5 spills, 6.3 h, 10 Sep to 11 Sep2 spills, 2.5 h, 13 Sep to 13 Sep2 spills, 3.4 h, 13 Sep to 14 Sep17 Sep 2025 02:02 GMT, 16.7 h20 Sep 2025 05:32 GMT, 32 h2 spills, 3.6 h, 27 Sep to 28 Sep1 Oct 2025 05:08 GMT, 2.7 h2 spills, 19.2 h, 3 Oct to 4 Oct19 Oct 2025 19:16 GMT, 2.6 h3 spills, 5.3 h, 21 Oct to 22 Oct23 Oct 2025 21:20 GMT, 6.4 h26 Oct 2025 23:22 GMT, 78 min2 spills, 2.6 h, 29 Oct to 30 Oct1 Nov 2025 06:27 GMT, 14.2 h2 spills, 14.2 h, 4 Nov to 5 Nov9 Nov 2025 14:42 GMT, 4.4 h4 spills, 25.9 h, 10 Nov to 13 Nov14 Nov 2025 06:26 GMT, 43.7 h18 Nov 2025 15:28 GMT, 29.8 h4 spills, 31.3 h, 21 Nov to 23 Nov28 Nov 2025 11:55 GMT, 3 h1 Dec 2025 22:19 GMT, 6 h2 spills, 8.4 h, 4 Dec to 4 Dec5 spills, 24.9 h, 5 Dec to 7 Dec9 Dec 2025 03:06 GMT, 18 h3 spills, 39.2 h, 14 Dec to 16 Dec2 spills, 5.8 h, 17 Dec to 18 Dec18 Dec 2025 19:43 GMT, 3.8 h22 Dec 2025 00:28 GMT, 3.7 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

01M2M3MJan 2025: 731 h spilling ≈ 1.2 million m³ (range 461,291-2.9 million m³)JanFeb 2025: 24 h spilling ≈ 38,645 m³ (range 15,393-97,020 m³)FebMar 2025: 18 h spilling ≈ 28,667 m³ (range 11,419-71,970 m³)MarApr 2025: 20 h spilling ≈ 31,676 m³ (range 12,617-79,525 m³)AprMay 2025: 57 h spilling ≈ 89,803 m³ (range 35,770-225,453 m³)MayJun 2025: 59 h spilling ≈ 93,129 m³ (range 37,095-233,803 m³)JunJul 2025: 29 h spilling ≈ 45,772 m³ (range 18,232-114,913 m³)JulAug 2025: 3.1 h spilling ≈ 4,910 m³ (range 1,956-12,326 m³)AugSep 2025: 172 h spilling ≈ 272,892 m³ (range 108,699-685,107 m³)SepOct 2025: 114 h spilling ≈ 180,556 m³ (range 71,919-453,292 m³)OctNov 2025: 499 h spilling ≈ 790,327 m³ (range 314,804-2.0 million m³)NovDec 2025: 366 h spilling ≈ 579,520 m³ (range 230,835-1.5 million m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
3 Jan 2025, 07:05Bromborough WwTW9.8 days149,064 - 939,521 m³
4 Jan 2025, 23:28Bromborough WwTW4.1 days62,635 - 394,775 m³
14 Nov 2025, 06:26Bromborough WwTW2.8 days42,184 - 265,878 m³
26 Jan 2025, 13:58Bromborough WwTW2.5 days38,220 - 240,894 m³
18 Nov 2025, 16:02Bromborough WwTW2.3 days35,129 - 221,411 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate3.3 million m³range 1.3 million - 8.3 million m³
In litres3.3 billionrange 1.3 billion - 8.3 billion L
Olympic swimming pools1,325at 2,500 m³ each
Organic load, as people's raw sewage5.0 millionperson-days of untreated BOD

Assumed spill rate while spilling: 175.2 - 1,104.5 L/s (central 440.0 L/s), from a dry-weather flow of 175.2 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 52,794 kg298,216 kg1.7 million kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 138,583 kg1.4 million kg6.0 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 2,508 kg20,875 kg77,364 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1,584 kg8,615 kg44,921 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 132.0 trillion organisms3.3 × 10¹⁵ organisms8.3 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Bromborough WwTW

Storm tank at sewage works · discharges to Mersey Estuary

Spills 2025
122 (1,426 hours) · down 35% on 2024
Spills 2024
187 (2,537 hours)
Long-term average
181.2 spills a year (monitored since 2017)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Bathing water
Wallasey
Shellfish water
North Wirral (East)
WFD catchment
MERSEY - Transitional (GB531206908100)
Outlet location
SJ3471085640 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP00335 · 016993398 · company name: BROMBOROUGH WwTW

Bromborough WwTW

Inlet overflow at sewage works · discharges to Mersey Estuary

Spills 2025
94 (666 hours) · down 32% on 2024
Spills 2024
138 (1,099 hours)
Long-term average
160.0 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Bathing water
Wallasey
Shellfish water
North Wirral (East)
WFD catchment
MERSEY - Transitional (GB531206908100)
Outlet location
SJ3471085640 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP00336 · 016993398 · company name: BROMBOROUGH WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.