Storm overflow register · United Utilities

Kirk Bampton sewage works: storm overflow spills 2025

Kirk Bampton sewage treatment works, run by United Utilities, has 2 monitored storm overflows discharging to Burghmoor Beck. In 2025 they recorded 112 spills totalling 678 hours, against 310 spills and 4,281 hours in 2024. By hours spilling, it ranks 72 of 289 United Utilities works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecKirk Bampton WwTW…1 Jan 2025 00:00 GMT, 61.8 h4 Jan 2025 10:02 GMT, 48.7 h6 Jan 2025 11:28 GMT, 50.5 h13 Jan 2025 20:12 GMT, 15.3 h15 Jan 2025 17:30 GMT, 21.3 h16 Jan 2025 15:13 GMT, 23.1 h18 Jan 2025 11:30 GMT, 51.3 h27 Jan 2025 21:11 GMT, 8.9 h4 Feb 2025 07:49 GMT, 22.8 h23 Feb 2025 15:09 GMT, 10.3 h24 Feb 2025 19:04 GMT, 8.7 h29 May 2025 06:16 GMT, 43 min3 Jun 2025 04:33 GMT, 16 min14 Jun 2025 02:43 GMT, 5.3 h14 Jun 2025 09:30 GMT, 98 min15 Jul 2025 08:14 GMT, 37 min15 Jul 2025 11:17 GMT, 69 min15 Jul 2025 12:46 GMT, 6.5 h4 Aug 2025 07:17 GMT, 48 min3 Dec 2025 11:24 GMT, 19.9 hKirk Bampton WwTW…1 Jan 2025 00:00 GMT, 12.3 h1 Jan 2025 20:45 GMT, 30 min2 Jan 2025 09:15 GMT, 30 min3 Jan 2025 10:30 GMT, 30 min5 Jan 2025 13:00 GMT, 16 h6 Jan 2025 05:15 GMT, 45 min6 Jan 2025 06:30 GMT, 30 min6 Jan 2025 07:15 GMT, 105 min6 Jan 2025 09:30 GMT, 30 min6 Jan 2025 10:15 GMT, 105 min6 Jan 2025 21:00 GMT, 45 min7 Jan 2025 09:30 GMT, 30 min7 Jan 2025 20:45 GMT, 30 min23 Jan 2025 15:30 GMT, 45 min26 Jan 2025 01:15 GMT, 60 min26 Jan 2025 15:30 GMT, 30 min4 Feb 2025 07:00 GMT, 45 min4 Feb 2025 09:00 GMT, 30 min4 Feb 2025 17:00 GMT, 45 min19 Feb 2025 23:00 GMT, 30 min23 Feb 2025 14:30 GMT, 30 min24 Feb 2025 18:45 GMT, 75 min27 Mar 2025 21:15 GMT, 60 min24 May 2025 00:36 GMT, 28 min29 May 2025 05:26 GMT, 12 min29 May 2025 05:54 GMT, 58 min30 May 2025 00:16 GMT, 32 min3 Jun 2025 03:16 GMT, 82 min5 Jun 2025 14:10 GMT, 28 min7 Jun 2025 04:30 GMT, 34 min8 Jun 2025 19:42 GMT, 56 min9 Jun 2025 19:48 GMT, 46 min14 Jun 2025 01:30 GMT, 30 min14 Jun 2025 02:46 GMT, 4.8 h14 Jun 2025 09:44 GMT, 68 min21 Jun 2025 21:14 GMT, 38 min26 Jun 2025 05:08 GMT, 30 min26 Jun 2025 05:40 GMT, 18 min1 Jul 2025 15:36 GMT, 68 min1 Jul 2025 17:56 GMT, 30 min3 Jul 2025 19:12 GMT, 36 min6 Jul 2025 00:54 GMT, 14 min6 Jul 2025 01:38 GMT, 30 min6 Jul 2025 02:12 GMT, 14 min14 Jul 2025 04:26 GMT, 74 min15 Jul 2025 04:10 GMT, 36 min15 Jul 2025 06:54 GMT, 42 min15 Jul 2025 07:48 GMT, 48 min15 Jul 2025 10:58 GMT, 68 min15 Jul 2025 12:42 GMT, 32 min15 Jul 2025 13:54 GMT, 2.2 h15 Jul 2025 17:14 GMT, 40 min20 Jul 2025 17:40 GMT, 48 min20 Jul 2025 19:36 GMT, 10 min3 Aug 2025 06:20 GMT, 40 min3 Aug 2025 07:32 GMT, 20 min4 Aug 2025 06:16 GMT, 94 min28 Aug 2025 13:00 GMT, 30 min3 Sep 2025 12:45 GMT, 30 min3 Sep 2025 14:15 GMT, 45 min3 Sep 2025 15:45 GMT, 60 min8 Sep 2025 09:30 GMT, 30 min11 Sep 2025 20:45 GMT, 30 min12 Sep 2025 06:30 GMT, 45 min12 Sep 2025 16:45 GMT, 105 min13 Sep 2025 02:00 GMT, 60 min13 Sep 2025 03:15 GMT, 60 min13 Sep 2025 13:30 GMT, 105 min13 Sep 2025 17:45 GMT, 30 min14 Sep 2025 22:15 GMT, 30 min14 Sep 2025 23:15 GMT, 30 min15 Sep 2025 01:15 GMT, 30 min15 Sep 2025 02:30 GMT, 2 h15 Sep 2025 07:00 GMT, 2.5 h15 Sep 2025 11:30 GMT, 2.3 h17 Sep 2025 03:15 GMT, 90 min19 Sep 2025 01:45 GMT, 45 min19 Sep 2025 02:45 GMT, 30 min19 Sep 2025 10:00 GMT, 45 min19 Sep 2025 12:00 GMT, 30 min19 Sep 2025 19:45 GMT, 4.3 h20 Sep 2025 00:45 GMT, 30 min20 Sep 2025 05:00 GMT, 30 min20 Sep 2025 06:00 GMT, 3 h20 Sep 2025 09:15 GMT, 30 min20 Sep 2025 15:30 GMT, 5.3 h3 Oct 2025 12:45 GMT, 2.5 h21 Oct 2025 10:30 GMT, 45 min27 Oct 2025 23:00 GMT, 75 min1 Nov 2025 01:30 GMT, 45 min1 Nov 2025 05:00 GMT, 75 min3 Nov 2025 03:00 GMT, 75 min3 Nov 2025 21:45 GMT, 30 min4 Nov 2025 08:00 GMT, 14 h5 Nov 2025 08:00 GMT, 75 min5 Nov 2025 09:30 GMT, 60 min10 Nov 2025 03:18 GMT, 3.2 h11 Nov 2025 08:54 GMT, 2.7 h12 Nov 2025 23:04 GMT, 5.3 h13 Nov 2025 04:23 GMT, 25.5 h14 Nov 2025 05:54 GMT, 6 min14 Nov 2025 06:24 GMT, 26 min14 Nov 2025 06:56 GMT, 6 min14 Nov 2025 07:18 GMT, 84 min14 Nov 2025 09:08 GMT, 14 min14 Nov 2025 09:24 GMT, 6 min14 Nov 2025 10:04 GMT, 18 min14 Nov 2025 11:00 GMT, 22 min18 Nov 2025 09:00 GMT, 48 min18 Nov 2025 10:24 GMT, 10 min22 Nov 2025 02:46 GMT, 46 min22 Nov 2025 04:56 GMT, 22 min23 Nov 2025 06:04 GMT, 6.9 h23 Nov 2025 21:40 GMT, 22 min23 Nov 2025 22:04 GMT, 46 min26 Nov 2025 14:02 GMT, 24 min27 Nov 2025 00:14 GMT, 38 min27 Nov 2025 03:36 GMT, 2.4 h27 Nov 2025 06:44 GMT, 8 min27 Nov 2025 06:54 GMT, 8 min27 Nov 2025 07:36 GMT, 4.5 h27 Nov 2025 12:22 GMT, 22 min28 Nov 2025 11:54 GMT, 22 min29 Nov 2025 07:24 GMT, 48 min29 Nov 2025 11:00 GMT, 30 min29 Nov 2025 12:10 GMT, 106 min1 Dec 2025 03:34 GMT, 2.9 h1 Dec 2025 07:16 GMT, 2.3 h1 Dec 2025 10:58 GMT, 25.8 h2 Dec 2025 12:56 GMT, 8 min2 Dec 2025 13:06 GMT, 56 min2 Dec 2025 14:26 GMT, 18 min2 Dec 2025 16:56 GMT, 8 min2 Dec 2025 19:26 GMT, 16 min2 Dec 2025 20:28 GMT, 6 min3 Dec 2025 08:06 GMT, 46 min3 Dec 2025 11:12 GMT, 13 min3 Dec 2025 11:26 GMT, 14 min3 Dec 2025 11:50 GMT, 40 min4 Dec 2025 17:22 GMT, 20 min5 Dec 2025 18:38 GMT, 44 min6 Dec 2025 10:09 GMT, 23 min6 Dec 2025 12:18 GMT, 22 min7 Dec 2025 02:42 GMT, 4 min7 Dec 2025 13:12 GMT, 20.9 h8 Dec 2025 10:08 GMT, 18 min8 Dec 2025 10:28 GMT, 8 min8 Dec 2025 10:38 GMT, 38 min8 Dec 2025 11:30 GMT, 46 min9 Dec 2025 05:30 GMT, 10.5 h9 Dec 2025 16:22 GMT, 89 min9 Dec 2025 17:54 GMT, 94 min9 Dec 2025 19:29 GMT, 2.7 h9 Dec 2025 22:12 GMT, 58 min9 Dec 2025 23:42 GMT, 8 min9 Dec 2025 23:52 GMT, 10 min10 Dec 2025 07:42 GMT, 28 min10 Dec 2025 08:56 GMT, 14 min13 Dec 2025 17:24 GMT, 68 min13 Dec 2025 18:42 GMT, 60 min13 Dec 2025 23:58 GMT, 4 min14 Dec 2025 00:08 GMT, 50 min14 Dec 2025 01:34 GMT, 3.8 h14 Dec 2025 05:32 GMT, 32 min14 Dec 2025 06:06 GMT, 3.6 h14 Dec 2025 09:46 GMT, 34 min14 Dec 2025 10:26 GMT, 60 min14 Dec 2025 11:50 GMT, 34 min14 Dec 2025 12:46 GMT, 22 min14 Dec 2025 13:26 GMT, 16 min14 Dec 2025 14:26 GMT, 4 min14 Dec 2025 18:26 GMT, 14 min14 Dec 2025 19:56 GMT, 16 min14 Dec 2025 20:26 GMT, 17 h17 Dec 2025 16:02 GMT, 2.2 h17 Dec 2025 19:44 GMT, 6.2 h18 Dec 2025 02:12 GMT, 26 min18 Dec 2025 03:14 GMT, 4 min18 Dec 2025 19:26 GMT, 2.7 h21 Dec 2025 13:30 GMT, 8 min22 Dec 2025 00:50 GMT, 76 min22 Dec 2025 03:26 GMT, 6 min22 Dec 2025 03:58 GMT, 20 min22 Dec 2025 05:44 GMT, 8 min

Hours spilling by month, 2025

0100200300400Jan 2025: 320 hours spillingJanFeb 2025: 46 hours spillingFebMar 2025: 1.0 hours spillingMarApr 2025: 0.0 hours spillingAprMay 2025: 2.9 hours spillingMayJun 2025: 19 hours spillingJunJul 2025: 20 hours spillingJulAug 2025: 3.9 hours spillingAugSep 2025: 36 hours spillingSepOct 2025: 4.5 hours spillingOctNov 2025: 82 hours spillingNovDec 2025: 142 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
1 Jan 2025, 00:00Kirk Bampton WwTW (Kirkb)2.6 days
18 Jan 2025, 11:30Kirk Bampton WwTW (Kirkb)2.1 days
6 Jan 2025, 11:28Kirk Bampton WwTW (Kirkb)2.1 days
4 Jan 2025, 10:02Kirk Bampton WwTW (Kirkb)2.0 days
1 Dec 2025, 10:58Kirk Bampton WwTW (Kirkb)1.1 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate11,617 m³range 4,627 – 29,165 m³
In litres11.6 millionrange 4.6 million – 29.2 million L
Olympic swimming pools4.6at 2,500 m³ each
Organic load, as people's raw sewage17,426person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 185 kg1,046 kg5,833 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 486 kg4,937 kg21,028 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 8.8 kg73 kg271 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 5.6 kg30 kg157 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 462.7 billion organisms11.6 trillion organisms291.7 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Kirk Bampton WwTW (Kirkb)

Storm tank at sewage works · discharges to Burghmoor Beck

Spills 2025
29 (359 hours) · down 86% on 2024
Spills 2024
204 (3,803 hours)
Long-term average
108.2 spills a year (monitored since 2020)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
SOLWAY (GB530207614700)
Outlet location
NY3025057020 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01074 · 017670126 · company name: KIRK BAMPTON WwTW

Kirk Bampton WwTW (Kirkb)

Inlet overflow at sewage works · discharges to Burghmoor Beck

Spills 2025
83 (319 hours) · down 22% on 2024
Spills 2024
106 (478 hours)
Long-term average
194.8 spills a year (monitored since 2020)
Monitor uptime
96% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
SOLWAY (GB530207614700)
Outlet location
NY3025057020 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01073 · 017670126 · company name: KIRK BAMPTON WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.