Knutsford sewage works: storm overflow spills 2025

Knutsford sewage treatment works, run by United Utilities, has 1 monitored storm overflow discharging to Birkin Brook. In 2025 it recorded 82 spills totalling 575 hours, against 137 spills and 1,325 hours in 2024. By hours spilling, it ranks 95 of 289 United Utilities works, where 1 spilled longest.

Works size: 14,390 population equivalent (KNUTSFORD STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecKnutsford WwTW1 Jan 2025 00:00 GMT, 24.8 h2 Jan 2025 00:48 GMT, 70 min2 Jan 2025 02:02 GMT, 22 min5 Jan 2025 11:04 GMT, 65.3 h8 Jan 2025 04:55 GMT, 23 min8 Jan 2025 09:15 GMT, 5.5 h13 Jan 2025 09:44 GMT, 46.7 h20 Jan 2025 22:58 GMT, 115 min23 Jan 2025 14:00 GMT, 89 min23 Jan 2025 17:55 GMT, 2.4 h24 Jan 2025 03:07 GMT, 8 h27 Jan 2025 01:03 GMT, 15.4 h27 Jan 2025 20:30 GMT, 77 min31 Jan 2025 02:23 GMT, 6.3 h20 Feb 2025 15:35 GMT, 37 min23 Feb 2025 21:03 GMT, 119 min26 Feb 2025 08:32 GMT, 2 h26 Feb 2025 22:32 GMT, 60 min7 Mar 2025 06:40 GMT, 7 h22 Mar 2025 20:19 GMT, 6.6 h23 Apr 2025 03:25 GMT, 3.4 h23 May 2025 23:58 GMT, 3 min24 May 2025 01:14 GMT, 1 min24 May 2025 01:55 GMT, 2.9 h24 May 2025 19:24 GMT, 117 min25 May 2025 01:12 GMT, 69 min25 May 2025 18:26 GMT, 71 min26 May 2025 20:56 GMT, 2.3 h27 May 2025 12:27 GMT, 4.7 h27 May 2025 17:19 GMT, 11 min28 May 2025 01:44 GMT, 7 h29 May 2025 02:01 GMT, 3.2 h3 Jun 2025 06:49 GMT, 4.1 h5 Jun 2025 04:13 GMT, 4.2 h5 Jun 2025 08:27 GMT, 14 min5 Jun 2025 08:50 GMT, 5.9 h14 Jun 2025 12:19 GMT, 93 min14 Jun 2025 14:10 GMT, 17 min2 Jul 2025 03:11 GMT, 43 min6 Jul 2025 06:09 GMT, 5.3 h6 Jul 2025 11:28 GMT, 16 min14 Jul 2025 06:11 GMT, 4 min16 Jul 2025 01:52 GMT, 38 min20 Jul 2025 20:04 GMT, 2.2 h7 Sep 2025 13:30 GMT, 2.9 h17 Sep 2025 03:55 GMT, 13.1 h20 Sep 2025 12:30 GMT, 19 h27 Sep 2025 22:47 GMT, 5.3 h3 Oct 2025 12:00 GMT, 11.9 h4 Oct 2025 09:58 GMT, 5.9 h4 Oct 2025 17:28 GMT, 5.6 h4 Oct 2025 23:11 GMT, 12 min19 Oct 2025 18:16 GMT, 119 min21 Oct 2025 15:42 GMT, 12 min21 Oct 2025 17:28 GMT, 34 min21 Oct 2025 18:05 GMT, 15 min24 Oct 2025 02:43 GMT, 2 min24 Oct 2025 06:44 GMT, 2 min24 Oct 2025 06:55 GMT, 5 min27 Oct 2025 03:56 GMT, 22 min27 Oct 2025 09:17 GMT, 20 min27 Oct 2025 09:38 GMT, 20 min27 Oct 2025 10:02 GMT, 14 min29 Oct 2025 03:12 GMT, 2.8 h29 Oct 2025 22:26 GMT, 110 min30 Oct 2025 00:18 GMT, 13 min31 Oct 2025 15:23 GMT, 96 min1 Nov 2025 03:39 GMT, 2.2 h1 Nov 2025 09:33 GMT, 104 min4 Nov 2025 19:01 GMT, 2.6 h5 Nov 2025 02:08 GMT, 7.2 h9 Nov 2025 19:09 GMT, 71 min11 Nov 2025 06:56 GMT, 4.2 h11 Nov 2025 20:07 GMT, 8.8 h12 Nov 2025 08:27 GMT, 116 min12 Nov 2025 11:30 GMT, 14.3 h13 Nov 2025 07:55 GMT, 55 min14 Nov 2025 06:51 GMT, 30.6 h15 Nov 2025 13:37 GMT, 10 min18 Nov 2025 16:24 GMT, 8.3 h19 Nov 2025 04:00 GMT, 2.7 h19 Nov 2025 06:45 GMT, 15 min19 Nov 2025 07:08 GMT, 12 min22 Nov 2025 05:24 GMT, 112 min23 Nov 2025 05:12 GMT, 4.2 h23 Nov 2025 10:50 GMT, 5.3 h28 Nov 2025 12:39 GMT, 5.7 h29 Nov 2025 01:31 GMT, 15.8 h29 Nov 2025 21:54 GMT, 2.4 h1 Dec 2025 02:18 GMT, 2.7 h1 Dec 2025 09:08 GMT, 5.7 h1 Dec 2025 19:04 GMT, 3.8 h2 Dec 2025 20:53 GMT, 60 min4 Dec 2025 13:41 GMT, 8.8 h5 Dec 2025 16:42 GMT, 4.1 h6 Dec 2025 11:24 GMT, 7.5 h7 Dec 2025 13:44 GMT, 118 min7 Dec 2025 17:48 GMT, 53 min8 Dec 2025 16:38 GMT, 4.5 h9 Dec 2025 03:16 GMT, 17.7 h12 Dec 2025 07:19 GMT, 5.6 h15 Dec 2025 03:18 GMT, 25.7 h16 Dec 2025 08:33 GMT, 3.3 h17 Dec 2025 09:08 GMT, 5.5 h17 Dec 2025 20:09 GMT, 7.7 h18 Dec 2025 09:35 GMT, 43 min18 Dec 2025 13:17 GMT, 13.5 h19 Dec 2025 09:04 GMT, 3 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

050k100k150kJan 2025: 181 h spilling ≈ 44,628 m³ (range 17,776–112,041 m³)JanFeb 2025: 5.6 h spilling ≈ 1,381 m³ (range 550–3,466 m³)FebMar 2025: 14 h spilling ≈ 3,378 m³ (range 1,346–8,480 m³)MarApr 2025: 3.4 h spilling ≈ 838 m³ (range 334–2,105 m³)AprMay 2025: 25 h spilling ≈ 6,090 m³ (range 2,426–15,290 m³)MayJun 2025: 16 h spilling ≈ 3,994 m³ (range 1,591–10,028 m³)JunJul 2025: 9.2 h spilling ≈ 2,268 m³ (range 904–5,695 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 40 h spilling ≈ 9,937 m³ (range 3,958–24,946 m³)SepOct 2025: 35 h spilling ≈ 8,506 m³ (range 3,388–21,356 m³)OctNov 2025: 122 h spilling ≈ 30,179 m³ (range 12,021–75,767 m³)NovDec 2025: 124 h spilling ≈ 30,475 m³ (range 12,139–76,510 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 11:04Knutsford WwTW2.7 days6,415 – 40,432 m³
13 Jan 2025, 09:44Knutsford WwTW1.9 days4,588 – 28,918 m³
14 Nov 2025, 06:51Knutsford WwTW1.3 days3,007 – 18,952 m³
15 Dec 2025, 03:18Knutsford WwTW1.1 days2,527 – 15,929 m³
1 Jan 2025, 00:00Knutsford WwTW1.0 days2,434 – 15,341 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate141,651 m³range 56,423 – 355,621 m³
In litres141.7 millionrange 56.4 million – 355.6 million L
Olympic swimming pools57at 2,500 m³ each
Organic load, as people's raw sewage212,477person-days of untreated BOD

Assumed spill rate while spilling: 27.3 – 171.9 L/s (central 68.5 L/s), from a dry-weather flow of 27.3 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,257 kg12,749 kg71,124 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 5,924 kg60,202 kg256,403 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 107 kg892 kg3,307 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 68 kg368 kg1,920 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 5.6 trillion organisms141.7 trillion organisms3.6 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Knutsford WwTW

Storm tank at sewage works · discharges to Birkin Brook

Spills 2025
82 (574 hours) · down 40% on 2024
Spills 2024
137 (1,325 hours)
Long-term average
142.5 spills a year (monitored since 2020)
Monitor uptime
99% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Birkin Brook - Source to Mobberley Brook (GB112069061340)
Outlet location
SJ7680079910 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01094 · 016910007 · company name: KNUTSFORD WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.