Storm overflow register · United Utilities

Liverpool sewage works: storm overflow spills 2025

Liverpool sewage treatment works, run by United Utilities, has 2 monitored storm overflows discharging to Mersey Estuary. In 2025 they recorded 178 spills totalling 997 hours, against 253 spills and 2,137 hours in 2024. By hours spilling, it ranks 47 of 289 United Utilities works, where 1 spilled longest.

Works size: 645,028 population equivalent (LIVERPOOL (SANDON [NORTH LIVERPOOL DOCKS] ) STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLiverpool WwTW33 spills, 26.6 h, 1 Jan to 2 Jan6 spills, 4.9 h, 3 Jan to 4 Jan13 spills, 95.2 h, 4 Jan to 10 Jan2 spills, 3.4 h, 20 Jan to 20 Jan21 Jan 2025 16:57 GMT, 4.8 h4 spills, 11.8 h, 22 Jan to 24 Jan5 spills, 9.5 h, 26 Jan to 27 Jan5 spills, 4 h, 30 Jan to 31 Jan12 spills, 2.8 h, 20 Feb to 20 Feb2 spills, 1.9 h, 23 Feb to 23 Feb26 Feb 2025 21:29 GMT, 105 min7 Mar 2025 08:25 GMT, 58 min3 spills, 9 h, 23 Mar to 23 Mar14 Apr 2025 18:52 GMT, 6 min2 spills, 1.1 h, 21 Apr to 21 Apr21 spills, 2.9 h, 23 Apr to 23 Apr6 May 2025 01:18 GMT, 3 min7 May 2025 13:59 GMT, 2 min2 spills, 7 h, 23 May to 24 May37 spills, 21 h, 26 May to 29 May1 Jun 2025 15:17 GMT, 22 min4 spills, 3.6 h, 3 Jun to 3 Jun5 spills, 11 h, 5 Jun to 6 Jun7 Jun 2025 10:25 GMT, 3.3 h2 spills, 0.6 h, 10 Jun to 10 Jun25 spills, 8.3 h, 13 Jun to 14 Jun7 spills, 2.6 h, 22 Jun to 22 Jun3 spills, 3.9 h, 24 Jun to 24 Jun3 Jul 2025 14:18 GMT, 3 min2 spills, 2.5 h, 4 Jul to 5 Jul2 spills, 0.1 h, 6 Jul to 6 Jul4 spills, 2.5 h, 15 Jul to 15 Jul8 spills, 1.6 h, 20 Jul to 20 Jul28 Jul 2025 07:34 GMT, 84 min29 Jul 2025 05:38 GMT, 114 min31 Jul 2025 01:44 GMT, 3.4 h3 spills, 3.2 h, 4 Aug to 4 Aug7 Aug 2025 10:04 GMT, 61 min3 spills, 0.3 h, 30 Aug to 30 Aug1 Sep 2025 12:27 GMT, 3.6 h2 spills, 1.9 h, 2 Sep to 3 Sep7 Sep 2025 12:43 GMT, 3.9 h3 spills, 7.1 h, 10 Sep to 11 Sep13 Sep 2025 00:24 GMT, 3.9 h2 spills, 3.4 h, 14 Sep to 14 Sep16 Sep 2025 04:38 GMT, 78 min4 spills, 5.3 h, 17 Sep to 17 Sep3 spills, 23.2 h, 20 Sep to 21 Sep27 Sep 2025 21:18 GMT, 4.6 h1 Oct 2025 05:05 GMT, 6.7 h5 spills, 34.8 h, 2 Oct to 4 Oct2 spills, 4.1 h, 19 Oct to 19 Oct4 spills, 8.5 h, 20 Oct to 22 Oct4 spills, 3.8 h, 24 Oct to 24 Oct9 spills, 5.5 h, 26 Oct to 27 Oct4 spills, 5.8 h, 29 Oct to 30 Oct5 spills, 11.7 h, 31 Oct to 1 Nov3 Nov 2025 09:31 GMT, 2 min7 spills, 12.4 h, 4 Nov to 5 Nov41 spills, 20.1 h, 9 Nov to 13 Nov60 spills, 16.5 h, 14 Nov to 15 Nov32 spills, 12.7 h, 18 Nov to 19 Nov22 spills, 21.1 h, 22 Nov to 23 Nov10 spills, 3.1 h, 28 Nov to 28 Nov7 spills, 11.2 h, 1 Dec to 2 Dec21 spills, 5.6 h, 4 Dec to 4 Dec17 spills, 14.8 h, 5 Dec to 7 Dec11 spills, 5.2 h, 9 Dec to 9 Dec4 spills, 0.5 h, 12 Dec to 12 Dec21 spills, 29 h, 14 Dec to 16 Dec6 spills, 9.2 h, 17 Dec to 18 Dec2 spills, 2.6 h, 22 Dec to 22 DecLiverpool WwTW4 spills, 36.3 h, 1 Jan to 2 Jan31 spills, 7.7 h, 3 Jan to 4 Jan30 spills, 94.7 h, 5 Jan to 10 Jan13 spills, 0.5 h, 20 Jan to 20 Jan3 spills, 1.5 h, 21 Jan to 21 Jan2 spills, 7.5 h, 24 Jan to 24 Jan5 spills, 8.4 h, 27 Jan to 27 Jan2 spills, 0.4 h, 31 Jan to 31 Jan20 Feb 2025 18:07 GMT, 23 min3 spills, 3.5 h, 23 Mar to 23 Mar24 May 2025 05:48 GMT, 69 min2 spills, 3.2 h, 26 May to 27 May2 spills, 1 h, 28 May to 28 May29 May 2025 07:15 GMT, 113 min14 spills, 6.8 h, 5 Jun to 5 Jun14 Jun 2025 01:44 GMT, 6.4 h20 Jul 2025 21:42 GMT, 2.2 h3 spills, 2.8 h, 11 Sep to 11 Sep17 Sep 2025 07:16 GMT, 8.7 h20 Sep 2025 10:14 GMT, 21 h28 Sep 2025 01:51 GMT, 29 min1 Oct 2025 09:40 GMT, 2.4 h3 spills, 28.5 h, 3 Oct to 4 Oct19 Oct 2025 21:36 GMT, 36 min4 spills, 1.5 h, 26 Oct to 27 Oct1 Nov 2025 12:09 GMT, 5.3 h5 spills, 7.3 h, 4 Nov to 5 Nov9 Nov 2025 19:45 GMT, 59 min12 spills, 23 h, 10 Nov to 13 Nov14 Nov 2025 11:17 GMT, 35.2 h42 spills, 20.8 h, 18 Nov to 19 Nov11 spills, 18.9 h, 22 Nov to 23 Nov9 spills, 10 h, 1 Dec to 2 Dec4 Dec 2025 16:00 GMT, 4.1 h11 spills, 7.3 h, 5 Dec to 6 Dec7 Dec 2025 18:38 GMT, 2.6 h12 spills, 8.3 h, 9 Dec to 9 Dec25 spills, 29.8 h, 14 Dec to 16 Dec5 spills, 11.8 h, 17 Dec to 19 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

02.5M5M7.5M10MJan 2025: 317 h spilling ≈ 3.5 million m³ (range 1.4 million-8.8 million m³)JanFeb 2025: 6.9 h spilling ≈ 76,260 m³ (range 30,376-191,454 m³)FebMar 2025: 14 h spilling ≈ 149,205 m³ (range 59,431-374,584 m³)MarApr 2025: 4.1 h spilling ≈ 45,314 m³ (range 18,049-113,763 m³)AprMay 2025: 35 h spilling ≈ 390,142 m³ (range 155,402-979,467 m³)MayJun 2025: 47 h spilling ≈ 517,242 m³ (range 206,028-1.3 million m³)JunJul 2025: 16 h spilling ≈ 172,414 m³ (range 68,676-432,852 m³)JulAug 2025: 4.5 h spilling ≈ 49,735 m³ (range 19,810-124,861 m³)AugSep 2025: 91 h spilling ≈ 1.0 million m³ (range 401,051-2.5 million m³)SepOct 2025: 104 h spilling ≈ 1.1 million m³ (range 455,640-2.9 million m³)OctNov 2025: 208 h spilling ≈ 2.3 million m³ (range 913,481-5.8 million m³)NovDec 2025: 152 h spilling ≈ 1.7 million m³ (range 668,272-4.2 million m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 16:43Liverpool WwTW1.9 days199,792 - 1.3 million m³
5 Jan 2025, 16:59Liverpool WwTW1.9 days199,058 - 1.3 million m³
14 Nov 2025, 11:17Liverpool WwTW1.5 days154,741 - 975,305 m³
7 Jan 2025, 14:41Liverpool WwTW1.4 days152,760 - 962,819 m³
1 Jan 2025, 00:00Liverpool WwTW1.4 days146,010 - 920,274 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate11.0 million m³range 4.4 million - 27.6 million m³
In litres11.0 billionrange 4.4 billion - 27.6 billion L
Olympic swimming pools4,405at 2,500 m³ each
Organic load, as people's raw sewage16.5 millionperson-days of untreated BOD

Assumed spill rate while spilling: 1,222.9 - 7,707.5 L/s (central 3,070.1 L/s), from a dry-weather flow of 1,222.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 175,476 kg991,216 kg5.5 million kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 460,625 kg4.7 million kg19.9 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 8,335 kg69,385 kg257,144 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 5,264 kg28,635 kg149,309 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 438.7 trillion organisms1.1 × 10¹⁶ organisms2.8 × 10¹⁷ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Liverpool WwTW

Inlet overflow at sewage works · discharges to Mersey Estuary

Spills 2025
118 (563 hours) · down 21% on 2024
Spills 2024
150 (1,037 hours)
Long-term average
122.4 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Bathing water
Wallasey
WFD catchment
MERSEY - Transitional (GB531206908100)
Outlet location
SJ3321592641 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01161 · 016993397 · company name: LIVERPOOL WwTW

Liverpool WwTW

Storm tank at sewage works · discharges to Mersey Estuary

Spills 2025
60 (434 hours) · down 42% on 2024
Spills 2024
103 (1,100 hours)
Long-term average
65.9 spills a year (monitored since 2018)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Bathing water
Wallasey
WFD catchment
MERSEY - Transitional (GB531206908100)
Outlet location
SJ3321592641 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01162 · 016993397 · company name: LIVERPOOL WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.