Storm overflow register · United Utilities

Low Bentham sewage works: storm overflow spills 2025

Low Bentham sewage treatment works, run by United Utilities, has 1 monitored storm overflow discharging to River Wenning. In 2025 it recorded 42 spills totalling 129 hours, against 100 spills and 723 hours in 2024. By hours spilling, it ranks 213 of 289 United Utilities works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLow Bentham WwTW…3 spills, 32 h, 1 Jan to 2 Jan5 Jan 2025 19:13 GMT, 16 min24 Jan 2025 02:45 GMT, 4.5 h2 spills, 5 h, 26 Jan to 27 Jan24 Feb 2025 00:30 GMT, 25 min2 spills, 1.2 h, 23 Mar to 23 Mar2 spills, 2.5 h, 26 May to 26 May29 May 2025 06:30 GMT, 3 h3 Jun 2025 05:45 GMT, 30 min6 Jun 2025 05:43 GMT, 17 min2 spills, 4.3 h, 7 Jun to 7 Jun9 Jun 2025 21:00 GMT, 4.5 h14 Jun 2025 00:45 GMT, 90 min2 spills, 1.1 h, 28 Jun to 28 Jun4 Jul 2025 17:00 GMT, 3 h2 spills, 2.3 h, 15 Jul to 15 Jul3 spills, 7.6 h, 20 Jul to 20 Jul4 Aug 2025 09:46 GMT, 26 min2 spills, 0.3 h, 1 Sep to 1 Sep7 Sep 2025 14:14 GMT, 16 min4 spills, 1.4 h, 11 Sep to 12 Sep10 spills, 12.3 h, 15 Sep to 16 Sep9 spills, 17.8 h, 20 Sep to 21 Sep8 spills, 3.6 h, 3 Oct to 4 Oct6 spills, 2.2 h, 3 Nov to 5 Nov11 Nov 2025 20:12 GMT, 42 min18 Nov 2025 13:52 GMT, 40 min28 Nov 2025 12:20 GMT, 34 min1 Dec 2025 23:24 GMT, 20 min4 spills, 2 h, 4 Dec to 4 Dec5 Dec 2025 17:40 GMT, 48 min3 spills, 8.3 h, 6 Dec to 7 Dec3 spills, 3.4 h, 9 Dec to 9 Dec17 Dec 2025 20:12 GMT, 6 min

Hours spilling by month, 2025

0204060Jan 2025: 42 hours spillingJanFeb 2025: 0.4 hours spillingFebMar 2025: 1.2 hours spillingMarApr 2025: 0.0 hours spillingAprMay 2025: 5.5 hours spillingMayJun 2025: 12 hours spillingJunJul 2025: 13 hours spillingJulAug 2025: 0.4 hours spillingAugSep 2025: 32 hours spillingSepOct 2025: 3.6 hours spillingOctNov 2025: 4.2 hours spillingNovDec 2025: 15 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
1 Jan 2025, 00:00Low Bentham WwTW (Lowbe)1.3 days
20 Sep 2025, 21:28Low Bentham WwTW (Lowbe)8.1 h
6 Dec 2025, 16:24Low Bentham WwTW (Lowbe)7.6 h
20 Sep 2025, 14:04Low Bentham WwTW (Lowbe)7.4 h
15 Sep 2025, 17:26Low Bentham WwTW (Lowbe)5.6 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate2,212 m³range 881 - 5,553 m³
In litres2.2 millionrange 881,108 - 5.6 million L
Olympic swimming pools0.9at 2,500 m³ each
Organic load, as people's raw sewage3,318person-days of untreated BOD

Assumed spill rate while spilling: 1.9 - 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 35 kg199 kg1,111 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 93 kg940 kg4,004 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 1.7 kg14 kg52 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1.1 kg5.8 kg30 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 88.1 billion organisms2.2 trillion organisms55.5 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Low Bentham WwTW (Lowbe)

Storm tank at sewage works · discharges to River Wenning

Spills 2025
42 (129 hours) · down 58% on 2024
Spills 2024
100 (723 hours)
Long-term average
59.7 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Wenning - Lower (GB112072065990)
Outlet location
SD6357069620 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01194 · 017260007 · company name: LOW BENTHAM WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.