Storm overflow register · United Utilities

Millom sewage works: storm overflow spills 2025

Millom sewage treatment works, run by United Utilities, has 1 monitored storm overflow discharging to Duddon Estuary. In 2025 it recorded 92 spills totalling 1,177 hours, against 117 spills and 1,527 hours in 2024. By hours spilling, it ranks 37 of 289 United Utilities works, where 1 spilled longest.

Works size: 8,366 population equivalent (MILLOM STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecMillom Wastewater…2 spills, 48.5 h, 1 Jan to 3 Jan3 spills, 50.9 h, 5 Jan to 7 Jan24 Jan 2025 01:38 GMT, 10.6 h27 Jan 2025 11:45 GMT, 5.5 h23 Feb 2025 14:05 GMT, 10.4 h23 May 2025 23:41 GMT, 5.3 h29 May 2025 02:57 GMT, 7.3 h31 May 2025 07:02 GMT, 88 min3 Jun 2025 01:32 GMT, 6.7 h5 Jun 2025 09:04 GMT, 29 min24 spills, 57.8 h, 6 Jun to 10 Jun14 Jun 2025 00:54 GMT, 21.5 h21 Jun 2025 22:30 GMT, 5.1 h24 Jun 2025 08:14 GMT, 76 min2 spills, 9.5 h, 26 Jun to 26 Jun4 Jul 2025 14:59 GMT, 6.9 h6 Jul 2025 02:46 GMT, 4.9 h15 Jul 2025 05:23 GMT, 18.3 h20 Jul 2025 16:36 GMT, 9 h3 spills, 12.4 h, 4 Aug to 4 Aug3 spills, 4.7 h, 13 Sep to 13 Sep5 spills, 12.8 h, 14 Sep to 16 Sep2 spills, 14.8 h, 17 Sep to 17 Sep8 spills, 40.7 h, 19 Sep to 21 Sep2 spills, 8.3 h, 1 Oct to 1 Oct7 spills, 62.5 h, 2 Oct to 5 Oct9 spills, 95.5 h, 1 Nov to 6 Nov19 spills, 148.2 h, 9 Nov to 16 Nov8 spills, 24.2 h, 18 Nov to 19 Nov30 spills, 55.9 h, 22 Nov to 25 Nov19 spills, 65.8 h, 26 Nov to 29 Nov34 spills, 222.8 h, 1 Dec to 11 Dec22 spills, 110.9 h, 14 Dec to 20 Dec22 spills, 15.7 h, 21 Dec to 23 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

050k100k150kJan 2025: 116 h spilling ≈ 16,557 m³ (range 6,595-41,566 m³)JanFeb 2025: 10 h spilling ≈ 1,491 m³ (range 594-3,743 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 14 h spilling ≈ 2,021 m³ (range 805-5,074 m³)MayJun 2025: 102 h spilling ≈ 14,664 m³ (range 5,841-36,815 m³)JunJul 2025: 39 h spilling ≈ 5,591 m³ (range 2,227-14,035 m³)JulAug 2025: 12 h spilling ≈ 1,777 m³ (range 708-4,462 m³)AugSep 2025: 73 h spilling ≈ 10,450 m³ (range 4,162-26,235 m³)SepOct 2025: 71 h spilling ≈ 10,163 m³ (range 4,048-25,515 m³)OctNov 2025: 390 h spilling ≈ 55,848 m³ (range 22,245-140,208 m³)NovDec 2025: 349 h spilling ≈ 50,085 m³ (range 19,950-125,741 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Dec 2025, 15:10Millom Wastewater Treatment Works2.9 days3,928 - 24,760 m³
4 Nov 2025, 02:26Millom Wastewater Treatment Works2.4 days3,222 - 20,309 m³
1 Dec 2025, 05:18Millom Wastewater Treatment Works2.2 days2,986 - 18,822 m³
12 Nov 2025, 16:04Millom Wastewater Treatment Works2.2 days2,973 - 18,738 m³
8 Dec 2025, 12:16Millom Wastewater Treatment Works2.1 days2,840 - 17,898 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate168,662 m³range 67,181 - 423,432 m³
In litres168.7 millionrange 67.2 million - 423.4 million L
Olympic swimming pools67at 2,500 m³ each
Organic load, as people's raw sewage252,993person-days of untreated BOD

Assumed spill rate while spilling: 15.9 - 100.0 L/s (central 39.8 L/s), from a dry-weather flow of 15.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,687 kg15,180 kg84,686 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 7,054 kg71,681 kg305,294 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 128 kg1,063 kg3,938 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 81 kg439 kg2,287 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 6.7 trillion organisms168.7 trillion organisms4.2 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Millom Wastewater Treatment Works

Storm tank at sewage works (with treatment) · discharges to Duddon Estuary

Spills 2025
92 (1,177 hours) · down 21% on 2024
Spills 2024
117 (1,527 hours)
Long-term average
88.3 spills a year (monitored since 2018)
Monitor uptime
98% of the year
High-spill reason (company)
Data collection - Confirmed exceptional weather
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
Treatment
UV (Ultraviolet)
Bathing water
Haverigg; Walney Biggar Bank; Walney West Shore; Walney Sandy Gap
WFD catchment
Duddon Sands (GB641211172000)
Outlet location
SD1922079410 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01322 · 017470048 · company name: MILLOM WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.