Storm overflow register · United Utilities

Salford sewage works: storm overflow spills 2025

Salford sewage treatment works, run by United Utilities, has 2 monitored storm overflows discharging to Manchester Ship Canal. In 2025 they recorded 84 spills totalling 279 hours, against 100 spills and 306 hours in 2024. By hours spilling, it ranks 167 of 289 United Utilities works, where 1 spilled longest.

Works size: 114,971 population equivalent (SALFORD STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSalford Wastewater…1 Jan 2025 00:00 GMT, 9.2 h1 Jan 2025 14:08 GMT, 30 min1 Jan 2025 17:41 GMT, 33 min5 Jan 2025 15:36 GMT, 18 min5 Jan 2025 15:59 GMT, 3 min5 Jan 2025 17:08 GMT, 14.3 h6 Jan 2025 07:29 GMT, 4 min6 Jan 2025 07:44 GMT, 3 min6 Jan 2025 07:59 GMT, 2 min20 Jan 2025 17:28 GMT, 52 min23 Jan 2025 12:40 GMT, 30 min23 Jan 2025 13:11 GMT, 4 min27 Jan 2025 01:01 GMT, 2.5 h31 Jan 2025 01:46 GMT, 54 min20 Feb 2025 13:44 GMT, 106 min23 Feb 2025 11:05 GMT, 30 min23 Feb 2025 19:35 GMT, 83 min24 Feb 2025 21:01 GMT, 16 min26 Feb 2025 07:01 GMT, 46 min26 Feb 2025 18:18 GMT, 2.4 h7 Mar 2025 05:19 GMT, 66 min23 May 2025 23:59 GMT, 2.2 h26 May 2025 17:26 GMT, 77 min26 May 2025 19:12 GMT, 3.3 h27 May 2025 12:35 GMT, 27 min29 May 2025 01:50 GMT, 98 min29 May 2025 04:56 GMT, 21 min3 Jun 2025 05:46 GMT, 40 min3 Jun 2025 07:26 GMT, 21 min5 Jun 2025 01:24 GMT, 38 min5 Jun 2025 04:26 GMT, 3.9 h5 Jun 2025 11:42 GMT, 3.2 h6 Jun 2025 02:39 GMT, 22 min7 Jun 2025 19:15 GMT, 17 min10 Jun 2025 00:09 GMT, 42 min10 Jun 2025 04:12 GMT, 33 min13 Jun 2025 23:04 GMT, 99 min22 Jun 2025 16:44 GMT, 28 min22 Jun 2025 20:06 GMT, 25 min2 Jul 2025 01:44 GMT, 40 min6 Jul 2025 22:26 GMT, 60 min15 Jul 2025 10:32 GMT, 53 min15 Jul 2025 12:13 GMT, 44 min15 Jul 2025 12:58 GMT, 2 min15 Jul 2025 16:31 GMT, 55 min15 Jul 2025 20:04 GMT, 44 min15 Jul 2025 21:23 GMT, 51 min4 Aug 2025 11:48 GMT, 40 min4 Aug 2025 12:29 GMT, 2 min1 Sep 2025 11:12 GMT, 40 min1 Sep 2025 13:57 GMT, 18 min1 Sep 2025 14:32 GMT, 37 min3 Sep 2025 19:47 GMT, 34 min4 Sep 2025 16:08 GMT, 16 min4 Sep 2025 21:03 GMT, 57 min7 Sep 2025 12:20 GMT, 89 min8 Sep 2025 15:38 GMT, 23 min10 Sep 2025 18:26 GMT, 39 min11 Sep 2025 12:02 GMT, 76 min11 Sep 2025 18:42 GMT, 31 min13 Sep 2025 14:52 GMT, 45 min15 Sep 2025 13:47 GMT, 35 min17 Sep 2025 03:12 GMT, 5.7 h17 Sep 2025 08:57 GMT, 24 min17 Sep 2025 09:45 GMT, 25 min20 Sep 2025 12:04 GMT, 16 min20 Sep 2025 13:42 GMT, 20 min20 Sep 2025 14:40 GMT, 10.8 h21 Sep 2025 02:07 GMT, 66 min27 Sep 2025 21:55 GMT, 2.2 h2 Oct 2025 22:05 GMT, 103 min3 Oct 2025 12:40 GMT, 3.1 h3 Oct 2025 16:27 GMT, 41 min4 Oct 2025 09:18 GMT, 113 min4 Oct 2025 11:11 GMT, 4 min19 Oct 2025 14:25 GMT, 103 min19 Oct 2025 18:17 GMT, 23 min19 Oct 2025 18:43 GMT, 3 min21 Oct 2025 16:07 GMT, 72 min21 Oct 2025 17:44 GMT, 69 min27 Oct 2025 06:55 GMT, 34 min27 Oct 2025 09:33 GMT, 22 min28 Oct 2025 01:07 GMT, 32 min29 Oct 2025 21:31 GMT, 84 min1 Nov 2025 07:45 GMT, 101 min5 Nov 2025 04:17 GMT, 50 min11 Nov 2025 06:57 GMT, 74 min11 Nov 2025 20:11 GMT, 71 min14 Nov 2025 18:43 GMT, 2.9 h22 Nov 2025 04:07 GMT, 30 min23 Nov 2025 11:34 GMT, 41 min28 Nov 2025 12:15 GMT, 59 min4 Dec 2025 14:14 GMT, 58 min8 Dec 2025 16:15 GMT, 22 min9 Dec 2025 04:24 GMT, 2.1 h14 Dec 2025 12:43 GMT, 35 min15 Dec 2025 02:36 GMT, 12 h15 Dec 2025 15:48 GMT, 99 min17 Dec 2025 20:21 GMT, 16 min17 Dec 2025 21:52 GMT, 20 min18 Dec 2025 15:09 GMT, 38 minSalford Wastewater…1 Jan 2025 00:00 GMT, 20.4 h5 Jan 2025 16:11 GMT, 20 h5 Jun 2025 15:38 GMT, 17 min5 Jun 2025 16:13 GMT, 18 min15 Jul 2025 21:46 GMT, 3.3 h17 Sep 2025 08:51 GMT, 5.4 h20 Sep 2025 17:31 GMT, 13.5 h3 Oct 2025 19:03 GMT, 4.9 h1 Nov 2025 10:49 GMT, 3.4 h11 Nov 2025 21:54 GMT, 3.5 h12 Nov 2025 20:14 GMT, 4.3 h14 Nov 2025 19:32 GMT, 8.8 h23 Nov 2025 13:58 GMT, 89 min4 Dec 2025 14:50 GMT, 4.9 h9 Dec 2025 05:20 GMT, 9.5 h14 Dec 2025 15:35 GMT, 56 min15 Dec 2025 03:45 GMT, 22.1 h17 Dec 2025 22:19 GMT, 3.6 h18 Dec 2025 15:41 GMT, 7.4 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300k400kJan 2025: 70 h spilling ≈ 138,291 m³ (range 55,084–347,186 m³)JanFeb 2025: 7.1 h spilling ≈ 13,987 m³ (range 5,571–35,114 m³)FebMar 2025: 1.1 h spilling ≈ 2,167 m³ (range 863–5,440 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 9.2 h spilling ≈ 18,124 m³ (range 7,219–45,500 m³)MayJun 2025: 14 h spilling ≈ 26,988 m³ (range 10,750–67,756 m³)JunJul 2025: 9.1 h spilling ≈ 17,927 m³ (range 7,141–45,006 m³)JulAug 2025: 0.7 h spilling ≈ 1,379 m³ (range 549–3,462 m³)AugSep 2025: 49 h spilling ≈ 96,725 m³ (range 38,528–242,832 m³)SepOct 2025: 20 h spilling ≈ 38,808 m³ (range 15,458–97,430 m³)OctNov 2025: 32 h spilling ≈ 62,054 m³ (range 24,717–155,789 m³)NovDec 2025: 67 h spilling ≈ 132,381 m³ (range 52,730–332,349 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
15 Dec 2025, 03:45Salford Wastewater Treatment Works22.1 h17,328 – 109,217 m³
1 Jan 2025, 00:00Salford Wastewater Treatment Works20.4 h16,007 – 100,892 m³
5 Jan 2025, 16:11Salford Wastewater Treatment Works20.0 h15,694 – 98,913 m³
5 Jan 2025, 17:08Salford Wastewater Treatment Works14.3 h11,182 – 70,476 m³
20 Sep 2025, 17:31Salford Wastewater Treatment Works13.5 h10,567 – 66,602 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate548,635 m³range 218,533 – 1.4 million m³
In litres548.6 millionrange 218.5 million – 1.4 billion L
Olympic swimming pools219at 2,500 m³ each
Organic load, as people's raw sewage822,952person-days of untreated BOD

Assumed spill rate while spilling: 218.0 – 1,373.8 L/s (central 547.2 L/s), from a dry-weather flow of 218.0 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 8,741 kg49,377 kg275,474 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 22,946 kg233,170 kg993,083 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 415 kg3,456 kg12,810 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 262 kg1,426 kg7,438 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 21.9 trillion organisms548.6 trillion organisms1.4 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Salford Wastewater Treatment Works

Inlet overflow at sewage works · discharges to Manchester Ship Canal

Spills 2025
64 (141 hours) · down 30% on 2024
Spills 2024
92 (239 hours)
Long-term average
88.6 spills a year (monitored since 2019)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Irwell / Manchester Ship Canal (Irk to confluence with Upper Mersey) (GB112069061452)
Outlet location
SJ7924097981 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01707 · 016940150 · company name: SALFORD WwTW

Salford Wastewater Treatment Works

Storm tank at sewage works · discharges to Manchester Ship Canal

Spills 2025
20 (138 hours) · up 150% on 2024
Spills 2024
8 (67 hours)
Long-term average
22.3 spills a year (monitored since 2019)
Monitor uptime
92% of the year
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Irwell / Manchester Ship Canal (Irk to confluence with Upper Mersey) (GB112069061452)
Outlet location
SJ7924097981 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01708 · 016940150 · company name: SALFORD WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.