Storm overflow register · United Utilities

Southport sewage works: storm overflow spills 2025

Southport sewage treatment works, run by United Utilities, has 1 monitored storm overflow discharging to Crossens Pool. In 2025 it recorded 26 spills totalling 118 hours, against 9 spills and 44 hours in 2024. By hours spilling, it ranks 217 of 289 United Utilities works, where 1 spilled longest.

Works size: 95,145 population equivalent (SOUTHPORT (BANK END) STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSouthport WwTW501 spills, 16.7 h, 1 Jan to 3 Jan935 spills, 35.3 h, 5 Jan to 8 Jan35 spills, 0.9 h, 20 Feb to 20 Feb97 spills, 3 h, 17 Sep to 17 Sep235 spills, 8.7 h, 20 Sep to 21 Sep17 spills, 0.3 h, 11 Nov to 11 Nov83 spills, 1.5 h, 15 Nov to 15 Nov20 spills, 1.4 h, 19 Nov to 19 Nov82 spills, 4.6 h, 2 Dec to 2 Dec53 spills, 1.7 h, 4 Dec to 5 Dec325 spills, 10 h, 5 Dec to 8 Dec430 spills, 13.9 h, 9 Dec to 10 Dec414 spills, 12.6 h, 15 Dec to 16 Dec303 spills, 11.2 h, 17 Dec to 19 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

0100k200k300kJan 2025: 52 h spilling ≈ 84,773 m³ (range 33,767-212,827 m³)JanFeb 2025: 0.9 h spilling ≈ 1,467 m³ (range 584-3,684 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 12 h spilling ≈ 19,074 m³ (range 7,598-47,886 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)OctNov 2025: 3.2 h spilling ≈ 5,217 m³ (range 2,078-13,097 m³)NovDec 2025: 54 h spilling ≈ 88,034 m³ (range 35,066-221,012 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
6 Jan 2025, 03:02Southport WwTW2.0 h1,299 - 8,186 m³
1 Jan 2025, 17:51Southport WwTW1.4 h920 - 5,798 m³
5 Jan 2025, 22:06Southport WwTW1.1 h703 - 4,434 m³
6 Jan 2025, 11:45Southport WwTW0.8 h530 - 3,342 m³
18 Dec 2025, 03:27Southport WwTW0.8 h519 - 3,274 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate192,533 m³range 76,690 - 483,362 m³
In litres192.5 millionrange 76.7 million - 483.4 million L
Olympic swimming pools77at 2,500 m³ each
Organic load, as people's raw sewage288,800person-days of untreated BOD

Assumed spill rate while spilling: 180.4 - 1,136.9 L/s (central 452.8 L/s), from a dry-weather flow of 180.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 3,068 kg17,328 kg96,672 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 8,052 kg81,827 kg348,504 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 146 kg1,213 kg4,495 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 92 kg501 kg2,610 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 7.7 trillion organisms192.5 trillion organisms4.8 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Southport WwTW

Storm tank at sewage works · discharges to Crossens Pool

Spills 2025
26 (118 hours) · up 189% on 2024
Spills 2024
9 (44 hours)
Long-term average
29.1 spills a year (monitored since 2017)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
Bathing Water and/or Shellfish Water improvement ongoing
Bathing water
Southport; St Annes; St. Annes North; Blackpool South
WFD catchment
RIBBLE - transitional (GB531207112400)
Outlet location
SD3708020820 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01793 · 017030100 · company name: SOUTHPORT WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.