Storm overflow register · United Utilities

St Helens sewage works: storm overflow spills 2025

St Helens sewage treatment works, run by United Utilities, has 2 monitored storm overflows discharging to Sankey Brook. In 2025 they recorded 64 spills totalling 602 hours, against 97 spills and 828 hours in 2024. By hours spilling, it ranks 89 of 289 United Utilities works, where 1 spilled longest.

Works size: 136,888 population equivalent (ST HELENS STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSt Helens STW1 Jan 2025 00:00 GMT, 51.2 h3 Jan 2025 21:26 GMT, 3.7 h5 Jan 2025 15:04 GMT, 74.1 h8 Jan 2025 19:23 GMT, 7 h27 Jan 2025 02:29 GMT, 8.6 h26 May 2025 20:58 GMT, 3.8 h27 May 2025 12:54 GMT, 5.3 h14 Jun 2025 01:49 GMT, 3.1 h17 Sep 2025 05:02 GMT, 17.1 h20 Sep 2025 15:57 GMT, 33.6 h3 Oct 2025 13:00 GMT, 36.1 h5 Oct 2025 01:06 GMT, 29 min29 Oct 2025 23:01 GMT, 18 min29 Oct 2025 23:20 GMT, 3.4 h1 Nov 2025 08:09 GMT, 16.4 h5 Nov 2025 05:45 GMT, 15 h11 Nov 2025 19:48 GMT, 16.3 h12 Nov 2025 18:04 GMT, 13.2 h14 Nov 2025 10:14 GMT, 39.1 h18 Nov 2025 16:54 GMT, 21.3 h19 Nov 2025 15:03 GMT, 8 h23 Nov 2025 10:55 GMT, 18.8 h4 Dec 2025 12:11 GMT, 14.6 h9 Dec 2025 04:46 GMT, 22.2 h14 Dec 2025 12:36 GMT, 10.2 h15 Dec 2025 01:56 GMT, 47.9 h17 Dec 2025 23:15 GMT, 4.6 h18 Dec 2025 16:46 GMT, 9.3 hSt Helens STW1 Jan 2025 00:00 GMT, 16.4 h5 Jan 2025 16:21 GMT, 27.7 h27 Jan 2025 01:52 GMT, 88 min20 Feb 2025 13:44 GMT, 42 min14 Jun 2025 00:46 GMT, 66 min17 Sep 2025 04:38 GMT, 5.4 h20 Sep 2025 15:10 GMT, 10.3 h3 Oct 2025 13:04 GMT, 2.8 h4 Oct 2025 09:34 GMT, 104 min29 Oct 2025 21:44 GMT, 50 min1 Nov 2025 07:09 GMT, 2.3 h5 Nov 2025 05:02 GMT, 24 min11 Nov 2025 19:35 GMT, 107 min14 Nov 2025 18:18 GMT, 6.3 h18 Nov 2025 16:30 GMT, 96 min23 Nov 2025 11:00 GMT, 68 min28 Nov 2025 12:48 GMT, 30 min4 Dec 2025 12:12 GMT, 32 min4 Dec 2025 13:40 GMT, 66 min9 Dec 2025 04:22 GMT, 76 min14 Dec 2025 12:08 GMT, 44 min15 Dec 2025 02:26 GMT, 11.3 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0500k1M1.5MJan 2025: 190 h spilling ≈ 445,645 m³ (range 177,510–1.1 million m³)JanFeb 2025: 0.7 h spilling ≈ 1,642 m³ (range 654–4,122 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 9.0 h spilling ≈ 21,109 m³ (range 8,408–52,996 m³)MayJun 2025: 4.2 h spilling ≈ 9,851 m³ (range 3,924–24,732 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 66 h spilling ≈ 155,741 m³ (range 62,035–390,994 m³)SepOct 2025: 46 h spilling ≈ 106,955 m³ (range 42,602–268,514 m³)OctNov 2025: 162 h spilling ≈ 379,971 m³ (range 151,350–953,931 m³)NovDec 2025: 124 h spilling ≈ 290,138 m³ (range 115,568–728,403 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 15:04St Helens STW3.1 days69,182 – 436,041 m³
1 Jan 2025, 00:00St Helens STW2.1 days47,787 – 301,195 m³
15 Dec 2025, 01:56St Helens STW2.0 days44,751 – 282,057 m³
14 Nov 2025, 10:14St Helens STW1.6 days36,498 – 230,043 m³
3 Oct 2025, 13:00St Helens STW1.5 days33,696 – 212,377 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate1.4 million m³range 562,051 – 3.5 million m³
In litres1.4 billionrange 562.1 million – 3.5 billion L
Olympic swimming pools564at 2,500 m³ each
Organic load, as people's raw sewage2.1 millionperson-days of untreated BOD

Assumed spill rate while spilling: 259.5 – 1,635.7 L/s (central 651.5 L/s), from a dry-weather flow of 259.5 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 22,482 kg126,995 kg708,500 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 59,015 kg599,697 kg2.6 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 1,068 kg8,890 kg32,945 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 674 kg3,669 kg19,130 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 56.2 trillion organisms1.4 × 10¹⁵ organisms3.5 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

St Helens STW

Storm tank at sewage works · discharges to Sankey Brook

Spills 2025
42 (504 hours) · down 35% on 2024
Spills 2024
65 (729 hours)
Long-term average
75.8 spills a year (monitored since 2021)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Sankey Brook (Rainford Brook to Mersey) (GB112069061200)
Outlet location
SJ5358095920 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01819 · 016920130 · company name: St Helens Wastewater Treatment Works (Site STHEL) (016920130)

St Helens STW

Inlet overflow at sewage works · discharges to Sankey Brook

Spills 2025
22 (97 hours) · down 31% on 2024
Spills 2024
32 (98 hours)
Long-term average
33.0 spills a year (monitored since 2021)
Monitor uptime
100% of the year
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Sankey Brook (Rainford Brook to Mersey) (GB112069061200)
Outlet location
SJ5358095920 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP01820 · 016920130 · company name: St Helens Wastewater Treatment Works (Site STHEL) (016920130)

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.