Storm overflow register · United Utilities

Whaley Bridge sewage works: storm overflow spills 2025

Whaley Bridge sewage treatment works, run by United Utilities, has 1 monitored storm overflow discharging to River Goyt. In 2025 it recorded 53 spills totalling 940 hours, against 53 spills and 852 hours in 2024. By hours spilling, it ranks 53 of 289 United Utilities works, where 1 spilled longest.

Works size: 41,086 population equivalent (WHALEY BRIDGE STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWhaley Bridge WwTW1 Jan 2025 01:45 GMT, 75.5 h4 Jan 2025 10:00 GMT, 12.5 h5 Jan 2025 11:15 GMT, 89.8 h9 Jan 2025 05:30 GMT, 19 h27 Jan 2025 02:00 GMT, 48.5 h29 Jan 2025 10:15 GMT, 90 min17 Sep 2025 10:54 GMT, 9.2 h20 Sep 2025 20:04 GMT, 25.9 h21 Sep 2025 22:14 GMT, 4 min4 Oct 2025 11:14 GMT, 16.3 h12 Nov 2025 08:48 GMT, 29.8 h13 Nov 2025 18:58 GMT, 2.5 h13 Nov 2025 21:28 GMT, 8 min14 Nov 2025 00:58 GMT, 4.3 h14 Nov 2025 05:26 GMT, 8 min14 Nov 2025 05:42 GMT, 4 min14 Nov 2025 05:56 GMT, 6 min14 Nov 2025 06:16 GMT, 30 min14 Nov 2025 06:48 GMT, 30 min14 Nov 2025 07:22 GMT, 8 min14 Nov 2025 07:32 GMT, 65.8 h18 Nov 2025 16:08 GMT, 33.9 h20 Nov 2025 02:04 GMT, 16 min20 Nov 2025 02:22 GMT, 14 min20 Nov 2025 11:34 GMT, 2.4 h23 Nov 2025 09:24 GMT, 41 h25 Nov 2025 10:38 GMT, 3.5 h25 Nov 2025 14:14 GMT, 4 min29 Nov 2025 08:40 GMT, 111.8 h4 Dec 2025 00:30 GMT, 6 min4 Dec 2025 11:46 GMT, 160.8 h11 Dec 2025 04:38 GMT, 14 min11 Dec 2025 08:16 GMT, 8.4 h11 Dec 2025 16:42 GMT, 8 min11 Dec 2025 17:10 GMT, 7 h12 Dec 2025 09:50 GMT, 14.4 h15 Dec 2025 08:30 GMT, 136.8 h21 Dec 2025 22:58 GMT, 17.1 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0200k400k600k800kJan 2025: 247 h spilling ≈ 173,744 m³ (range 69,206–436,190 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 35 h spilling ≈ 24,780 m³ (range 9,871–62,212 m³)SepOct 2025: 16 h spilling ≈ 11,475 m³ (range 4,571–28,808 m³)OctNov 2025: 225 h spilling ≈ 158,115 m³ (range 62,981–396,954 m³)NovDec 2025: 417 h spilling ≈ 293,843 m³ (range 117,044–737,706 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
4 Dec 2025, 11:46Whaley Bridge WwTW6.7 days45,100 – 284,254 m³
15 Dec 2025, 08:30Whaley Bridge WwTW5.7 days38,351 – 241,719 m³
29 Nov 2025, 08:40Whaley Bridge WwTW4.7 days31,350 – 197,593 m³
5 Jan 2025, 11:15Whaley Bridge WwTW3.7 days25,167 – 158,623 m³
1 Jan 2025, 01:45Whaley Bridge WwTW3.1 days21,171 – 133,437 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate661,957 m³range 263,671 – 1.7 million m³
In litres662.0 millionrange 263.7 million – 1.7 billion L
Olympic swimming pools265at 2,500 m³ each
Organic load, as people's raw sewage992,936person-days of untreated BOD

Assumed spill rate while spilling: 77.9 – 490.9 L/s (central 195.6 L/s), from a dry-weather flow of 77.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 10,547 kg59,576 kg332,374 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 27,685 kg281,332 kg1.2 million kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 501 kg4,170 kg15,455 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 316 kg1,721 kg8,974 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 26.4 trillion organisms662.0 trillion organisms1.7 × 10¹⁶ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Whaley Bridge WwTW

Inlet overflow at sewage works · discharges to River Goyt

Spills 2025
53 (940 hours) · no change on 2024
Spills 2024
53 (852 hours)
Long-term average
66.3 spills a year (monitored since 2021)
Monitor uptime
99% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
No investigation activity in reporting period
Improvement
No improvement action in reporting period
WFD catchment
Goyt (Randall Carr Brook to Sett). (GB112069060880)
Outlet location
SK0125083220 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP02097 · 016940184 · company name: WHALEY BRIDGE WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.