Storm overflow register · United Utilities

Worsley sewage works: storm overflow spills 2025

Worsley sewage treatment works, run by United Utilities, has 3 monitored storm overflows discharging to Little Hulton Stream. In 2025 they recorded 115 spills totalling 496 hours, against 158 spills and 949 hours in 2024. By hours spilling, it ranks 104 of 289 United Utilities works, where 1 spilled longest.

Works size: 22,983 population equivalent (WORSLEY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWorsley WwTW3 spills, 22.8 h, 1 Jan to 1 Jan2 spills, 31.3 h, 5 Jan to 6 Jan20 Jan 2025 16:56 GMT, 47 min23 Jan 2025 12:30 GMT, 43 min27 Jan 2025 00:54 GMT, 4.4 h31 Jan 2025 02:06 GMT, 33 min14 Feb 2025 19:59 GMT, 88 min20 Feb 2025 12:52 GMT, 2.3 h23 Feb 2025 19:29 GMT, 91 min26 Feb 2025 18:42 GMT, 2.1 h24 May 2025 00:26 GMT, 67 min3 spills, 3.5 h, 26 May to 27 May29 May 2025 04:25 GMT, 22 min2 spills, 1.4 h, 3 Jun to 3 Jun3 spills, 1.8 h, 5 Jun to 6 Jun9 Jun 2025 23:46 GMT, 85 min2 spills, 0.8 h, 13 Jun to 14 Jun2 spills, 1.3 h, 22 Jun to 22 Jun24 Jun 2025 07:47 GMT, 45 min20 Jul 2025 16:51 GMT, 98 min2 spills, 2.8 h, 4 Aug to 4 Aug1 Sep 2025 14:20 GMT, 40 min7 Sep 2025 12:17 GMT, 91 min5 spills, 1.9 h, 10 Sep to 12 Sep13 Sep 2025 14:40 GMT, 34 min2 spills, 9.9 h, 16 Sep to 17 Sep3 spills, 14.5 h, 20 Sep to 21 Sep27 Sep 2025 21:29 GMT, 2.3 h10 spills, 18.7 h, 2 Oct to 4 Oct2 spills, 0.9 h, 19 Oct to 19 Oct20 Oct 2025 13:37 GMT, 31 min21 Oct 2025 15:50 GMT, 41 min3 spills, 2.7 h, 24 Oct to 24 Oct4 spills, 7.2 h, 26 Oct to 28 Oct29 Oct 2025 21:17 GMT, 91 min2 spills, 4.5 h, 1 Nov to 1 Nov3 Nov 2025 06:21 GMT, 51 min5 Nov 2025 04:19 GMT, 5.2 h9 Nov 2025 18:29 GMT, 4 min3 spills, 6.1 h, 10 Nov to 11 Nov3 spills, 3.5 h, 12 Nov to 12 Nov5 spills, 10.8 h, 14 Nov to 15 Nov16 Nov 2025 10:12 GMT, 10 min11 spills, 6.2 h, 23 Nov to 23 Nov28 Nov 2025 12:10 GMT, 73 min29 Nov 2025 12:18 GMT, 67 min5 spills, 2.9 h, 1 Dec to 2 Dec3 spills, 4.8 h, 4 Dec to 4 Dec7 spills, 6.9 h, 6 Dec to 7 Dec4 spills, 13.9 h, 9 Dec to 9 Dec3 spills, 24.9 h, 14 Dec to 15 Dec6 spills, 7.7 h, 17 Dec to 18 DecWorsley WwTW1 Jan 2025 00:00 GMT, 27.1 h2 spills, 48.3 h, 5 Jan to 7 Jan27 Jan 2025 04:24 GMT, 5 h26 May 2025 21:26 GMT, 71 min4 Aug 2025 11:44 GMT, 82 min17 Sep 2025 06:11 GMT, 8.3 h2 spills, 14.9 h, 20 Sep to 21 Sep3 spills, 22.7 h, 3 Oct to 4 Oct4 spills, 6.8 h, 27 Oct to 28 Oct1 Nov 2025 10:14 GMT, 3.3 h5 Nov 2025 06:56 GMT, 5.1 h11 Nov 2025 20:09 GMT, 3.5 h12 Nov 2025 17:59 GMT, 5.7 h2 spills, 15.8 h, 14 Nov to 15 Nov23 Nov 2025 12:07 GMT, 8.7 h2 spills, 2.7 h, 1 Dec to 2 Dec3 spills, 6.2 h, 4 Dec to 4 Dec3 spills, 7.2 h, 6 Dec to 7 Dec9 Dec 2025 05:58 GMT, 15.8 h3 spills, 25.2 h, 14 Dec to 16 Dec2 spills, 9.5 h, 17 Dec to 18 DecWorsley WwTW20 Jan 2025 17:07 GMT, 8 min14 Feb 2025 21:26 GMT, 9 min20 Feb 2025 13:05 GMT, 19 min24 May 2025 00:01 GMT, 28 min6 Jul 2025 22:41 GMT, 8 min20 Jul 2025 17:13 GMT, 15 min28 Aug 2025 16:07 GMT, 8 min1 Sep 2025 14:28 GMT, 10 min7 Sep 2025 12:28 GMT, 2 min19 Oct 2025 14:16 GMT, 23 min1 Nov 2025 07:27 GMT, 9 min28 Nov 2025 12:15 GMT, 30 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

050k100k150kJan 2025: 141 h spilling ≈ 55,487 m³ (range 22,101-139,301 m³)JanFeb 2025: 7.9 h spilling ≈ 3,111 m³ (range 1,239-7,810 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 6.6 h spilling ≈ 2,599 m³ (range 1,035-6,525 m³)MayJun 2025: 7.4 h spilling ≈ 2,914 m³ (range 1,161-7,316 m³)JunJul 2025: 2.0 h spilling ≈ 788 m³ (range 314-1,977 m³)JulAug 2025: 4.3 h spilling ≈ 1,693 m³ (range 674-4,251 m³)AugSep 2025: 55 h spilling ≈ 21,580 m³ (range 8,596-54,178 m³)SepOct 2025: 62 h spilling ≈ 24,455 m³ (range 9,741-61,395 m³)OctNov 2025: 82 h spilling ≈ 32,370 m³ (range 12,894-81,267 m³)NovDec 2025: 128 h spilling ≈ 50,210 m³ (range 20,000-126,053 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 17:24Worsley WwTW1.4 days5,302 - 33,416 m³
5 Jan 2025, 14:50Worsley WwTW1.3 days4,904 - 30,912 m³
1 Jan 2025, 00:00Worsley WwTW1.1 days4,243 - 26,743 m³
15 Dec 2025, 02:24Worsley WwTW23.0 h3,605 - 22,723 m³
1 Jan 2025, 00:00Worsley WwTW22.7 h3,563 - 22,459 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate195,286 m³range 77,786 - 490,273 m³
In litres195.3 millionrange 77.8 million - 490.3 million L
Olympic swimming pools78at 2,500 m³ each
Organic load, as people's raw sewage292,929person-days of untreated BOD

Assumed spill rate while spilling: 43.6 - 274.6 L/s (central 109.4 L/s), from a dry-weather flow of 43.6 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 3,111 kg17,576 kg98,055 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 8,168 kg82,996 kg353,487 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 148 kg1,230 kg4,560 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 93 kg508 kg2,647 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 7.8 trillion organisms195.3 trillion organisms4.9 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Worsley WwTW

Inlet overflow at sewage works · discharges to Little Hulton Stream

Spills 2025
72 (249 hours) · down 17% on 2024
Spills 2024
87 (391 hours)
Long-term average
85.5 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Astley Brook (Mersey) (GB112069061100)
Outlet location
SD7215002750 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP02176 · 016940139 · company name: WORSLEY WwTW

Worsley WwTW

Storm tank at sewage works · discharges to Little Hulton Stream

Spills 2025
31 (244 hours) · down 48% on 2024
Spills 2024
60 (556 hours)
Long-term average
63.8 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Astley Brook (Mersey) (GB112069061100)
Outlet location
SD7215002750 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP02177 · 016940139 · company name: WORSLEY WwTW

Worsley WwTW

Inlet overflow at sewage works · discharges to Little Hulton Stream

Spills 2025
12 (2.8 hours) · up 9% on 2024
Spills 2024
11 (1.8 hours)
Long-term average
11.4 spills a year (monitored since 2020)
Monitor uptime
100% of the year
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Astley Brook (Mersey) (GB112069061100)
Outlet location
SD7215002750 (OS grid reference) · View on Apple Maps
EA ID / permit
UUP02178 · 016940139 · company name: WORSLEY WwTW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All United Utilities works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.