Storm overflow register · Wessex Water

East Coker sewage works: storm overflow spills 2025

East Coker sewage treatment works, run by Wessex Water, has 1 monitored storm overflow discharging to Stoford Brook (S). In 2025 it recorded 30 spills totalling 359 hours, against 50 spills and 353 hours in 2024. By hours spilling, it ranks 113 of 242 Wessex Water works, where 1 spilled longest.

Works size: 3,573 population equivalent (EAST COKER STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecEast Coker STW5 Jan 2025 00:02 GMT, 45.8 h24 Jan 2025 02:30 GMT, 14.3 h24 Jan 2025 16:56 GMT, 46 min24 Jan 2025 18:00 GMT, 2 min24 Jan 2025 18:10 GMT, 2 min26 Jan 2025 04:14 GMT, 69.7 h29 Jan 2025 01:58 GMT, 2 min29 Jan 2025 02:06 GMT, 44 min29 Jan 2025 03:02 GMT, 4 min29 Jan 2025 03:12 GMT, 6 min29 Jan 2025 08:20 GMT, 3.5 h29 Jan 2025 11:54 GMT, 82 min23 Feb 2025 21:58 GMT, 24.2 h25 Feb 2025 00:36 GMT, 10.6 h25 Feb 2025 11:20 GMT, 4 min25 Feb 2025 11:30 GMT, 2 min25 Feb 2025 11:52 GMT, 4 min25 Feb 2025 12:02 GMT, 28 min25 Feb 2025 12:32 GMT, 4 min26 Feb 2025 08:30 GMT, 14.2 h26 Feb 2025 22:48 GMT, 6 min26 Feb 2025 23:00 GMT, 4 min10 Nov 2025 08:55 GMT, 68 min10 Nov 2025 11:39 GMT, 2.7 h11 Nov 2025 20:01 GMT, 4.4 h12 Nov 2025 00:44 GMT, 60 min12 Nov 2025 04:32 GMT, 3.2 h12 Nov 2025 07:43 GMT, 4 min12 Nov 2025 08:15 GMT, 78 min14 Nov 2025 15:54 GMT, 5.6 h1 Dec 2025 15:29 GMT, 9.5 h4 Dec 2025 06:45 GMT, 5.5 h5 Dec 2025 16:32 GMT, 11 h9 Dec 2025 01:00 GMT, 52.3 h11 Dec 2025 09:26 GMT, 4 min11 Dec 2025 09:31 GMT, 4 min11 Dec 2025 09:38 GMT, 7.6 h16 Dec 2025 01:32 GMT, 9.5 h16 Dec 2025 11:28 GMT, 6 min16 Dec 2025 11:39 GMT, 6 min17 Dec 2025 23:51 GMT, 6.9 h18 Dec 2025 06:49 GMT, 6 min18 Dec 2025 07:14 GMT, 39 h19 Dec 2025 22:16 GMT, 6 min21 Dec 2025 23:15 GMT, 2.7 h22 Dec 2025 01:57 GMT, 8 min22 Dec 2025 02:24 GMT, 2 min22 Dec 2025 02:33 GMT, 2.6 h22 Dec 2025 05:14 GMT, 50 min22 Dec 2025 06:13 GMT, 10 min22 Dec 2025 08:26 GMT, 4.1 h22 Dec 2025 12:38 GMT, 52 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

010k20k30kJan 2025: 136 h spilling ≈ 8,351 m³ (range 3,326–20,964 m³)JanFeb 2025: 50 h spilling ≈ 3,061 m³ (range 1,219–7,685 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 19 h spilling ≈ 1,182 m³ (range 471–2,966 m³)NovDec 2025: 153 h spilling ≈ 9,379 m³ (range 3,736–23,547 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
26 Jan 2025, 04:14East Coker STW2.9 days1,699 – 10,708 m³
9 Dec 2025, 01:00East Coker STW2.2 days1,275 – 8,033 m³
5 Jan 2025, 00:02East Coker STW1.9 days1,116 – 7,034 m³
18 Dec 2025, 07:14East Coker STW1.6 days951 – 5,994 m³
23 Feb 2025, 21:58East Coker STW1.0 days591 – 3,725 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate21,972 m³range 8,752 – 55,162 m³
In litres22.0 millionrange 8.8 million – 55.2 million L
Olympic swimming pools8.8at 2,500 m³ each
Organic load, as people's raw sewage32,959person-days of untreated BOD

Assumed spill rate while spilling: 6.8 – 42.7 L/s (central 17.0 L/s), from a dry-weather flow of 6.8 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 350 kg1,978 kg11,032 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 919 kg9,338 kg39,772 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 17 kg138 kg513 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 11 kg57 kg298 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 875.2 billion organisms22.0 trillion organisms551.6 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

East Coker STW

Storm tank at sewage works · discharges to Stoford Brook (S)

Spills 2025
30 (359 hours) · down 40% on 2024
Spills 2024
50 (353 hours)
Long-term average
36.6 spills a year (monitored since 2021)
Monitor uptime
100% of the year
Investigation
Operational investigation completed
Improvement
Operational improvement completed
WFD catchment
Sutton Bingham Stream - conf Closworth Str to conf Yeo (GB108052015590)
Outlet location
ST5470013030 (OS grid reference) · View on Apple Maps
EA ID / permit
WXW00392 · 071196 · company name: EAST COKER MOOR LANE STORM TANK

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Wessex Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.