Storm overflow register · Wessex Water

Lydlinch sewage works: storm overflow spills 2025

Lydlinch sewage treatment works, run by Wessex Water, has 1 monitored storm overflow discharging to River Lydden. In 2025 it recorded 59 spills totalling 360 hours, against 82 spills and 572 hours in 2024. By hours spilling, it ranks 112 of 242 Wessex Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLydlinch Water…1 Jan 2025 11:00 GMT, 11.3 h1 Jan 2025 22:30 GMT, 15 min4 Jan 2025 21:30 GMT, 42.8 h6 Jan 2025 16:45 GMT, 90 min6 Jan 2025 18:30 GMT, 45 min6 Jan 2025 20:45 GMT, 15 min23 Jan 2025 11:45 GMT, 5 h23 Jan 2025 20:00 GMT, 15 min24 Jan 2025 01:15 GMT, 17 h26 Jan 2025 10:00 GMT, 53 h28 Jan 2025 19:00 GMT, 15 min28 Jan 2025 19:30 GMT, 15 min31 Jan 2025 04:15 GMT, 30 min31 Jan 2025 05:15 GMT, 4 h31 Jan 2025 10:30 GMT, 15 min20 Feb 2025 09:00 GMT, 15 min20 Feb 2025 10:00 GMT, 8.5 h20 Feb 2025 18:45 GMT, 15 min20 Feb 2025 19:15 GMT, 15 min20 Feb 2025 19:45 GMT, 15 min21 Feb 2025 15:30 GMT, 6 h23 Feb 2025 15:00 GMT, 75 min23 Feb 2025 16:45 GMT, 28.5 h24 Feb 2025 21:30 GMT, 45 min25 Feb 2025 00:15 GMT, 7.8 h25 Feb 2025 09:00 GMT, 15 min25 Feb 2025 10:15 GMT, 15 min25 Feb 2025 19:45 GMT, 15 min26 Feb 2025 08:00 GMT, 11.4 h26 Feb 2025 19:32 GMT, 4 min26 Feb 2025 19:38 GMT, 4 min26 Feb 2025 19:52 GMT, 2 min26 Feb 2025 19:58 GMT, 6 min26 Feb 2025 20:12 GMT, 6 min26 Feb 2025 21:28 GMT, 6 min26 Feb 2025 21:36 GMT, 4 min26 Feb 2025 21:48 GMT, 2 min26 Feb 2025 22:28 GMT, 2 min27 Feb 2025 07:58 GMT, 2 min21 Mar 2025 17:38 GMT, 6 min23 Apr 2025 01:18 GMT, 82 min21 May 2025 03:11 GMT, 26 min21 May 2025 09:09 GMT, 2.9 h21 May 2025 13:38 GMT, 46 min21 May 2025 18:22 GMT, 2 min21 May 2025 18:26 GMT, 10 min21 May 2025 18:40 GMT, 2 min21 May 2025 19:05 GMT, 2 min12 Jun 2025 09:44 GMT, 64 min12 Jun 2025 12:00 GMT, 2 min20 Jul 2025 08:37 GMT, 14 min26 Aug 2025 07:20 GMT, 4 min26 Aug 2025 07:50 GMT, 2 min26 Aug 2025 08:26 GMT, 2 min26 Aug 2025 09:02 GMT, 4 min27 Aug 2025 12:49 GMT, 32 min27 Aug 2025 13:23 GMT, 2 min27 Aug 2025 17:03 GMT, 18 min27 Aug 2025 17:42 GMT, 2 min27 Aug 2025 17:57 GMT, 8 min27 Aug 2025 18:15 GMT, 8 min27 Aug 2025 18:27 GMT, 6 min27 Aug 2025 19:02 GMT, 2 min27 Aug 2025 19:38 GMT, 6 min27 Aug 2025 22:25 GMT, 12 min27 Aug 2025 23:15 GMT, 2 min28 Aug 2025 07:03 GMT, 2 min28 Aug 2025 07:14 GMT, 4 min28 Aug 2025 07:25 GMT, 2 min28 Aug 2025 07:30 GMT, 4 min28 Aug 2025 07:38 GMT, 4 min28 Aug 2025 07:43 GMT, 6 min28 Aug 2025 07:54 GMT, 4.2 h29 Aug 2025 02:51 GMT, 94 min29 Aug 2025 12:26 GMT, 40 min29 Aug 2025 13:25 GMT, 38 min29 Aug 2025 15:11 GMT, 28 min30 Aug 2025 07:41 GMT, 16 min30 Aug 2025 07:59 GMT, 12 min30 Aug 2025 08:15 GMT, 8 min30 Aug 2025 08:39 GMT, 4 min30 Aug 2025 08:48 GMT, 6 min30 Aug 2025 08:57 GMT, 2 min30 Aug 2025 09:09 GMT, 8 min30 Aug 2025 09:20 GMT, 2 min30 Aug 2025 09:24 GMT, 2 min30 Aug 2025 18:13 GMT, 2 min30 Aug 2025 18:27 GMT, 2 min30 Aug 2025 18:38 GMT, 10 min30 Aug 2025 18:49 GMT, 2 min3 Sep 2025 02:14 GMT, 2 min3 Sep 2025 02:17 GMT, 4 min3 Sep 2025 02:24 GMT, 10 min3 Sep 2025 02:35 GMT, 2 min3 Sep 2025 02:50 GMT, 56 min3 Sep 2025 05:39 GMT, 10 min3 Sep 2025 07:52 GMT, 2 min3 Sep 2025 11:55 GMT, 86 min11 Sep 2025 12:18 GMT, 4 min12 Sep 2025 17:32 GMT, 38 min12 Sep 2025 18:11 GMT, 2 min13 Sep 2025 02:26 GMT, 20 min1 Oct 2025 22:25 GMT, 6 min3 Oct 2025 23:33 GMT, 40 min19 Oct 2025 17:01 GMT, 24 min20 Oct 2025 02:28 GMT, 14 min20 Oct 2025 07:00 GMT, 2 min20 Oct 2025 08:50 GMT, 3.4 h20 Oct 2025 12:18 GMT, 6 min20 Oct 2025 12:26 GMT, 2 min20 Oct 2025 12:31 GMT, 2 min22 Oct 2025 18:58 GMT, 2 min1 Nov 2025 14:53 GMT, 5 min7 Nov 2025 19:39 GMT, 5 min10 Nov 2025 00:04 GMT, 3.9 h10 Nov 2025 07:48 GMT, 1 min10 Nov 2025 08:17 GMT, 14 min10 Nov 2025 08:51 GMT, 6 min10 Nov 2025 10:45 GMT, 6.3 h10 Nov 2025 17:06 GMT, 23 min10 Nov 2025 17:30 GMT, 8 min10 Nov 2025 17:55 GMT, 5 min10 Nov 2025 18:06 GMT, 4 min10 Nov 2025 18:49 GMT, 2 min10 Nov 2025 19:16 GMT, 6 min10 Nov 2025 20:14 GMT, 1 min11 Nov 2025 18:54 GMT, 3 min11 Nov 2025 19:03 GMT, 1 min11 Nov 2025 19:05 GMT, 4.8 h12 Nov 2025 02:59 GMT, 1 min12 Nov 2025 04:09 GMT, 2.5 h12 Nov 2025 06:49 GMT, 7 min12 Nov 2025 06:58 GMT, 21 min12 Nov 2025 07:20 GMT, 3 min12 Nov 2025 07:30 GMT, 3 min12 Nov 2025 07:34 GMT, 6 min12 Nov 2025 07:41 GMT, 6 min12 Nov 2025 07:52 GMT, 2 min12 Nov 2025 07:56 GMT, 3 min12 Nov 2025 19:59 GMT, 2 min13 Nov 2025 18:54 GMT, 3 min13 Nov 2025 19:18 GMT, 23 min13 Nov 2025 19:45 GMT, 3 min14 Nov 2025 13:21 GMT, 10 h14 Nov 2025 23:28 GMT, 2 min15 Nov 2025 00:33 GMT, 2 min23 Nov 2025 05:23 GMT, 54 min23 Nov 2025 06:18 GMT, 2 min29 Nov 2025 07:57 GMT, 76 min29 Nov 2025 09:13 GMT, 18 min29 Nov 2025 09:35 GMT, 18 min29 Nov 2025 10:11 GMT, 2 min29 Nov 2025 10:18 GMT, 2 min1 Dec 2025 07:14 GMT, 2 min1 Dec 2025 07:32 GMT, 3 min1 Dec 2025 07:39 GMT, 1 min1 Dec 2025 08:12 GMT, 8 min1 Dec 2025 08:26 GMT, 3 min1 Dec 2025 08:35 GMT, 5 min1 Dec 2025 08:44 GMT, 1 min1 Dec 2025 08:51 GMT, 3 min1 Dec 2025 08:59 GMT, 16 min1 Dec 2025 09:18 GMT, 5 min1 Dec 2025 09:24 GMT, 5 min1 Dec 2025 09:31 GMT, 2 min1 Dec 2025 09:35 GMT, 1 min1 Dec 2025 09:40 GMT, 1 min1 Dec 2025 10:34 GMT, 2 min1 Dec 2025 12:49 GMT, 1 min1 Dec 2025 13:45 GMT, 3 min1 Dec 2025 13:50 GMT, 6 min1 Dec 2025 13:59 GMT, 10.1 h4 Dec 2025 05:44 GMT, 7.3 h4 Dec 2025 13:07 GMT, 8 min4 Dec 2025 13:18 GMT, 2 min4 Dec 2025 17:37 GMT, 3 min5 Dec 2025 15:02 GMT, 16 min5 Dec 2025 15:53 GMT, 12.4 h6 Dec 2025 04:20 GMT, 6 min6 Dec 2025 07:57 GMT, 1 min6 Dec 2025 08:23 GMT, 2 min6 Dec 2025 08:35 GMT, 3 min6 Dec 2025 08:53 GMT, 3 min6 Dec 2025 09:49 GMT, 3 min7 Dec 2025 18:47 GMT, 1 min8 Dec 2025 07:02 GMT, 25 min8 Dec 2025 22:20 GMT, 1 min8 Dec 2025 22:36 GMT, 1 min8 Dec 2025 23:10 GMT, 12 min8 Dec 2025 23:33 GMT, 3 min8 Dec 2025 23:37 GMT, 4 min8 Dec 2025 23:42 GMT, 19 h9 Dec 2025 18:44 GMT, 7 min9 Dec 2025 18:51 GMT, 20 min9 Dec 2025 19:18 GMT, 3 min9 Dec 2025 19:21 GMT, 23 min9 Dec 2025 19:56 GMT, 3 min9 Dec 2025 20:17 GMT, 5 min9 Dec 2025 20:28 GMT, 7 min9 Dec 2025 20:48 GMT, 1 min15 Dec 2025 17:39 GMT, 19 h16 Dec 2025 12:40 GMT, 4 min16 Dec 2025 12:47 GMT, 3 min16 Dec 2025 12:54 GMT, 2 min16 Dec 2025 12:56 GMT, 3 min16 Dec 2025 13:05 GMT, 6 min16 Dec 2025 13:20 GMT, 1 min17 Dec 2025 22:34 GMT, 7 min17 Dec 2025 22:50 GMT, 13 min17 Dec 2025 23:05 GMT, 5 min17 Dec 2025 23:10 GMT, 1 min17 Dec 2025 23:15 GMT, 25 min17 Dec 2025 23:53 GMT, 4.6 h18 Dec 2025 04:41 GMT, 4 min18 Dec 2025 04:54 GMT, 1 min18 Dec 2025 06:20 GMT, 8 min18 Dec 2025 07:03 GMT, 4 min18 Dec 2025 07:12 GMT, 1 min18 Dec 2025 07:14 GMT, 3 min18 Dec 2025 07:25 GMT, 1 min18 Dec 2025 07:45 GMT, 6 min18 Dec 2025 07:59 GMT, 2 min18 Dec 2025 10:02 GMT, 16.3 h19 Dec 2025 07:57 GMT, 3 min21 Dec 2025 18:36 GMT, 4 min21 Dec 2025 18:56 GMT, 5 min21 Dec 2025 19:48 GMT, 3 min21 Dec 2025 21:44 GMT, 56 min21 Dec 2025 22:45 GMT, 2 min21 Dec 2025 22:54 GMT, 2 min21 Dec 2025 23:03 GMT, 1 min21 Dec 2025 23:06 GMT, 39 min21 Dec 2025 23:46 GMT, 2 min21 Dec 2025 23:51 GMT, 3 min21 Dec 2025 23:55 GMT, 2 min22 Dec 2025 00:02 GMT, 3 min22 Dec 2025 00:38 GMT, 4 min22 Dec 2025 00:53 GMT, 1 min22 Dec 2025 01:09 GMT, 1 min

Hours spilling by month, 2025

050100150Jan 2025: 137 hours spillingJanFeb 2025: 67 hours spillingFebMar 2025: 0.1 hours spillingMarApr 2025: 1.4 hours spillingAprMay 2025: 4.3 hours spillingMayJun 2025: 1.1 hours spillingJunJul 2025: 0.2 hours spillingJulAug 2025: 11 hours spillingAugSep 2025: 3.9 hours spillingSepOct 2025: 5.0 hours spillingOctNov 2025: 33 hours spillingNovDec 2025: 96 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
26 Jan 2025, 10:00Lydlinch Water Recycling Centre2.2 days
4 Jan 2025, 21:30Lydlinch Water Recycling Centre1.8 days
23 Feb 2025, 16:45Lydlinch Water Recycling Centre1.2 days
8 Dec 2025, 23:42Lydlinch Water Recycling Centre19.0 h
15 Dec 2025, 17:39Lydlinch Water Recycling Centre19.0 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate6,175 m³range 2,460 – 15,503 m³
In litres6.2 millionrange 2.5 million – 15.5 million L
Olympic swimming pools2.5at 2,500 m³ each
Organic load, as people's raw sewage9,263person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 98 kg556 kg3,101 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 258 kg2,624 kg11,178 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 4.7 kg39 kg144 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 3.0 kg16 kg84 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 246.0 billion organisms6.2 trillion organisms155.0 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Lydlinch Water Recycling Centre

Inlet overflow at sewage works · discharges to River Lydden

Spills 2025
59 (360 hours) · down 28% on 2024
Spills 2024
82 (572 hours)
Long-term average
73.0 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Lydden (Middle) (GB108043015940)
Outlet location
ST7502813816 (OS grid reference) · View on Apple Maps
EA ID / permit
WXW00663 · 040862 · company name: LYDLINCH INLET

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Wessex Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.