Malmesbury sewage treatment works, run by Wessex Water, has 1 monitored storm overflow discharging to River Avon. In 2025 it recorded 47 spills totalling 544 hours, against 80 spills and 983 hours in 2024. By hours spilling, it ranks 75 of 242 Wessex Water works, where 1 spilled longest.

Works size: 11,806 population equivalent (MALMESBURY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecMalmesbury WwTW43 spills, 58.1 h, 5 Jan to 8 Jan98 spills, 85.5 h, 26 Jan to 1 Feb42 spills, 16.5 h, 10 Feb to 11 Feb142 spills, 37 h, 23 Feb to 27 Feb9 spills, 6.9 h, 14 Sep to 15 Sep2 spills, 2.6 h, 24 Oct to 25 Oct10 spills, 3.5 h, 10 Nov to 10 Nov21 spills, 8.1 h, 12 Nov to 12 Nov38 spills, 76.2 h, 14 Nov to 17 Nov65 spills, 47 h, 1 Dec to 4 Dec108 spills, 93.3 h, 6 Dec to 11 Dec167 spills, 109.8 h, 16 Dec to 22 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

050k100k150kJan 2025: 144 h spilling ≈ 29,028 m³ (range 11,563-72,877 m³)JanFeb 2025: 54 h spilling ≈ 10,843 m³ (range 4,319-27,221 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 6.8 h spilling ≈ 1,376 m³ (range 548-3,453 m³)SepOct 2025: 2.6 h spilling ≈ 526 m³ (range 209-1,320 m³)OctNov 2025: 88 h spilling ≈ 17,761 m³ (range 7,075-44,590 m³)NovDec 2025: 250 h spilling ≈ 50,572 m³ (range 20,144-126,964 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
14 Nov 2025, 05:39Malmesbury WwTW2.9 days5,558 - 35,034 m³
26 Jan 2025, 15:22Malmesbury WwTW2.5 days4,763 - 30,023 m³
5 Jan 2025, 06:19Malmesbury WwTW1.8 days3,549 - 22,371 m³
8 Dec 2025, 22:57Malmesbury WwTW1.3 days2,507 - 15,803 m³
18 Dec 2025, 12:45Malmesbury WwTW1.0 days1,992 - 12,552 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate110,126 m³range 43,866 - 276,476 m³
In litres110.1 millionrange 43.9 million - 276.5 million L
Olympic swimming pools44at 2,500 m³ each
Organic load, as people's raw sewage165,189person-days of untreated BOD

Assumed spill rate while spilling: 22.4 - 141.1 L/s (central 56.2 L/s), from a dry-weather flow of 22.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,755 kg9,911 kg55,295 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 4,606 kg46,804 kg199,339 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 83 kg694 kg2,571 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 53 kg286 kg1,493 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 4.4 trillion organisms110.1 trillion organisms2.8 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Malmesbury WwTW

Storm tank at sewage works · discharges to River Avon

Spills 2025
47 (544 hours) · down 41% on 2024
Spills 2024
80 (983 hours)
Long-term average
63.8 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
WFD catchment
Avon (Brist) conf Tetbury Avon to conf R Marden (GB109053027650)
Outlet location
ST9432386909 (OS grid reference) · View on Apple Maps
EA ID / permit
WXW00677 · 102361 · company name: MALMESBURY STORM TANK

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Wessex Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.