Storm overflow register · Wessex Water

Sherborne sewage works: storm overflow spills 2025

Sherborne sewage treatment works, run by Wessex Water, has 2 monitored storm overflows discharging to River Yeo. In 2025 they recorded 65 spills totalling 553 hours, against 88 spills and 649 hours in 2024. By hours spilling, it ranks 73 of 242 Wessex Water works, where 1 spilled longest.

Works size: 11,923 population equivalent (SHERBORNE STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSherborne WwTW107 spills, 54.1 h, 5 Jan to 7 Jan10 spills, 8.8 h, 24 Jan to 24 Jan71 spills, 81 h, 26 Jan to 29 Jan35 spills, 3.3 h, 31 Jan to 31 Jan129 spills, 58.6 h, 23 Feb to 27 Feb10 Nov 2025 11:45 GMT, 114 min2 spills, 3.2 h, 11 Nov to 11 Nov14 spills, 5.8 h, 14 Nov to 14 Nov10 spills, 0.9 h, 1 Dec to 1 Dec4 Dec 2025 06:15 GMT, 2.9 h1041 spills, 83.1 h, 5 Dec to 12 Dec191 spills, 10.2 h, 15 Dec to 16 Dec1417 spills, 80.4 h, 17 Dec to 23 DecSherborne WwTW74 spills, 24.6 h, 5 Jan to 6 Jan8 spills, 3.8 h, 23 Jan to 24 Jan13 spills, 52.4 h, 26 Jan to 28 Jan31 Jan 2025 05:32 GMT, 46 min6 spills, 13.4 h, 24 Feb to 25 Feb47 spills, 14.3 h, 26 Feb to 27 Feb21 May 2025 17:39 GMT, 18 min12 Jun 2025 10:03 GMT, 22 min29 Aug 2025 03:33 GMT, 12 min4 Sep 2025 05:21 GMT, 16 min10 Sep 2025 03:22 GMT, 12 min11 Sep 2025 13:25 GMT, 6 min3 spills, 1.3 h, 10 Nov to 10 Nov29 Nov 2025 08:14 GMT, 26 min1 Dec 2025 18:24 GMT, 4 min4 Dec 2025 06:18 GMT, 52 min3 spills, 2.2 h, 5 Dec to 5 Dec8 Dec 2025 06:47 GMT, 14 min7 spills, 12.2 h, 9 Dec to 9 Dec3 spills, 1.7 h, 15 Dec to 16 Dec4 spills, 31.9 h, 18 Dec to 19 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

050k100k150kJan 2025: 229 h spilling ≈ 46,702 m³ (range 18,602-117,246 m³)JanFeb 2025: 86 h spilling ≈ 17,610 m³ (range 7,014-44,211 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 0.3 h spilling ≈ 61 m³ (range 24-154 m³)MayJun 2025: 0.4 h spilling ≈ 82 m³ (range 33-205 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JulAug 2025: 0.2 h spilling ≈ 41 m³ (range 16-103 m³)AugSep 2025: 0.6 h spilling ≈ 123 m³ (range 49-308 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)OctNov 2025: 13 h spilling ≈ 2,574 m³ (range 1,025-6,462 m³)NovDec 2025: 227 h spilling ≈ 46,313 m³ (range 18,448-116,272 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
26 Jan 2025, 12:15Sherborne WwTW2.8 days5,395 - 34,004 m³
26 Jan 2025, 20:32Sherborne WwTW1.8 days3,605 - 22,721 m³
18 Dec 2025, 11:46Sherborne WwTW1.3 days2,528 - 15,934 m³
5 Jan 2025, 21:44Sherborne WwTW1.2 days2,379 - 14,993 m³
18 Dec 2025, 10:45Sherborne WwTW1.2 days2,253 - 14,198 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate113,015 m³range 45,016 - 283,729 m³
In litres113.0 millionrange 45.0 million - 283.7 million L
Olympic swimming pools45at 2,500 m³ each
Organic load, as people's raw sewage169,523person-days of untreated BOD

Assumed spill rate while spilling: 22.6 - 142.5 L/s (central 56.7 L/s), from a dry-weather flow of 22.6 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,801 kg10,171 kg56,746 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 4,727 kg48,032 kg204,569 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 86 kg712 kg2,639 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 54 kg294 kg1,532 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 4.5 trillion organisms113.0 trillion organisms2.8 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Sherborne WwTW

Storm tank at sewage works · discharges to River Yeo

Spills 2025
35 (392 hours) · down 20% on 2024
Spills 2024
44 (348 hours)
Long-term average
25.9 spills a year (monitored since 2019)
Monitor uptime
100% of the year
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Operational improvement completed
WFD catchment
Yeo (GB108052015630)
Outlet location
ST6301515348 (OS grid reference) · View on Apple Maps
EA ID / permit
WXW00985 · 070099 · company name: SHERBORNE WEST MILL LANE STORM TANK

Sherborne WwTW

Inlet overflow at sewage works · discharges to River Yeo

Spills 2025
30 (162 hours) · down 32% on 2024
Spills 2024
44 (301 hours)
Long-term average
30.4 spills a year (monitored since 2019)
Monitor uptime
96% of the year
Investigation
Env Act (SODRP) investigation ongoing, UWWTR investigation ongoing
Improvement
Operational improvement completed
WFD catchment
Yeo (GB108052015630)
Outlet location
ST6316315378 (OS grid reference) · View on Apple Maps
EA ID / permit
WXW00984 · 070099 · company name: SHERBORNE WEST MILL LANE INLET

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Wessex Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.