Storm overflow register · Yorkshire Water

Barwick In Elmet sewage works: storm overflow spills 2025

Barwick In Elmet sewage treatment works, run by Yorkshire Water, has 2 monitored storm overflows discharging to Trib of Cock Beck. In 2025 they recorded 57 spills totalling 546 hours, against 101 spills and 866 hours in 2024. By hours spilling, it ranks 84 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 3,369 population equivalent (BARWICK STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBarwick in Elmet…24 spills, 27.3 h, 1 Jan to 2 Jan47 spills, 66.8 h, 5 Jan to 9 Jan21 spills, 53.3 h, 26 Jan to 29 Jan3 spills, 0.8 h, 30 Jan to 30 Jan14 spills, 12.3 h, 22 Mar to 23 Mar25 May 2025 22:30 GMT, 30 min15 Jul 2025 20:15 GMT, 45 min4 spills, 2 h, 19 Jul to 19 Jul4 spills, 3.5 h, 20 Jul to 20 Jul2 spills, 1 h, 4 Sep to 4 Sep2 spills, 4 h, 17 Sep to 17 Sep11 spills, 9.5 h, 20 Sep to 21 Sep2 spills, 3 h, 28 Sep to 28 Sep16 spills, 13.3 h, 3 Oct to 4 Oct11 spills, 9.3 h, 19 Oct to 20 Oct8 spills, 13.5 h, 11 Nov to 13 Nov34 spills, 51.5 h, 14 Nov to 16 Nov49 spills, 63.5 h, 29 Nov to 3 Dec64 spills, 92.5 h, 4 Dec to 11 Dec69 spills, 117.8 h, 15 Dec to 23 DecBarwick in Elmet…

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

010k20k30k40kJan 2025: 148 h spilling ≈ 8,543 m³ (range 3,403-21,449 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)FebMar 2025: 12 h spilling ≈ 704 m³ (range 281-1,768 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 0.5 h spilling ≈ 29 m³ (range 11-72 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JunJul 2025: 6.2 h spilling ≈ 358 m³ (range 143-899 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 18 h spilling ≈ 1,010 m³ (range 402-2,536 m³)SepOct 2025: 23 h spilling ≈ 1,299 m³ (range 517-3,261 m³)OctNov 2025: 97 h spilling ≈ 5,599 m³ (range 2,230-14,058 m³)NovDec 2025: 242 h spilling ≈ 13,958 m³ (range 5,560-35,042 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 17:30Barwick in Elmet Sewage Works1.1 days604 - 3,804 m³
15 Dec 2025, 19:15Barwick in Elmet Sewage Works1.1 days598 - 3,768 m³
18 Dec 2025, 23:00Barwick in Elmet Sewage Works23.5 h540 - 3,406 m³
6 Jan 2025, 23:30Barwick in Elmet Sewage Works22.0 h506 - 3,188 m³
1 Dec 2025, 22:45Barwick in Elmet Sewage Works15.3 h351 - 2,210 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate31,507 m³range 12,550 - 79,099 m³
In litres31.5 millionrange 12.5 million - 79.1 million L
Olympic swimming pools13at 2,500 m³ each
Organic load, as people's raw sewage47,260person-days of untreated BOD

Assumed spill rate while spilling: 6.4 - 40.3 L/s (central 16.0 L/s), from a dry-weather flow of 6.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 502 kg2,836 kg15,820 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 1,318 kg13,390 kg57,030 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 24 kg198 kg736 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 15 kg82 kg427 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 1.3 trillion organisms31.5 trillion organisms791.0 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Barwick in Elmet Sewage Works

Storm tank at sewage works · discharges to Trib of Cock Beck

Spills 2025
57 (546 hours) · down 44% on 2024
Spills 2024
101 (866 hours)
Long-term average
94.5 spills a year (monitored since 2020)
Monitor uptime
98% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation completed, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Cock Beck Catchment (trib of Wharfe) (GB104027063940)
Outlet location
SE4083037380 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00794 · 65 · company name: BARWICK IN ELMET/STW

Barwick in Elmet Sewage Works

Inlet overflow at sewage works · discharges to Trib of Cock Beck

Spills 2025
0 (0.0 hours) · no change on 2024
Spills 2024
0 (0.0 hours)
Long-term average
0.3 spills a year (monitored since 2020)
Monitor uptime
98% of the year
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Cock Beck Catchment (trib of Wharfe) (GB104027063940)
Outlet location
SE4083037380 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00795 · 65 · company name: BARWICK IN ELMET/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.