Storm overflow register · Yorkshire Water

Ben Rhydding Wpc Works St sewage works: storm overflow spills 2025

Ben Rhydding Wpc Works St sewage treatment works, run by Yorkshire Water, has 1 monitored storm overflow discharging to River Wharfe. In 2025 it recorded 127 spills totalling 1,759 hours, against 158 spills and 2,505 hours in 2024. By hours spilling, it ranks 8 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 4,433 population equivalent (BEN RHYDDING STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBen Rhydding (Ilkley)…1 Jan 2025 00:00 GMT, 70.5 h3 Jan 2025 22:30 GMT, 30 min3 Jan 2025 23:15 GMT, 15 min3 Jan 2025 23:30 GMT, 15 min3 Jan 2025 23:45 GMT, 15 min4 Jan 2025 08:15 GMT, 2 h4 Jan 2025 10:15 GMT, 105 min4 Jan 2025 12:15 GMT, 8.8 h4 Jan 2025 21:00 GMT, 15 min4 Jan 2025 21:15 GMT, 15 min5 Jan 2025 07:00 GMT, 92.3 h9 Jan 2025 03:15 GMT, 12.8 h9 Jan 2025 16:15 GMT, 30 min9 Jan 2025 17:00 GMT, 45 min9 Jan 2025 17:45 GMT, 4.3 h9 Jan 2025 22:15 GMT, 105 min10 Jan 2025 07:45 GMT, 15 min10 Jan 2025 08:15 GMT, 2.8 h10 Jan 2025 13:30 GMT, 15 min10 Jan 2025 13:45 GMT, 15 min10 Jan 2025 14:15 GMT, 15 min10 Jan 2025 14:30 GMT, 30 min10 Jan 2025 15:00 GMT, 15 min10 Jan 2025 15:30 GMT, 15 min12 Jan 2025 14:45 GMT, 75 min12 Jan 2025 16:00 GMT, 5.5 h13 Jan 2025 01:45 GMT, 94.8 h17 Jan 2025 07:30 GMT, 7 h17 Jan 2025 14:30 GMT, 15 min17 Jan 2025 15:00 GMT, 15 min17 Jan 2025 15:15 GMT, 30 min17 Jan 2025 16:15 GMT, 15 min17 Jan 2025 16:45 GMT, 5.3 h17 Jan 2025 22:30 GMT, 2 h18 Jan 2025 08:45 GMT, 10.8 h18 Jan 2025 20:00 GMT, 30 min18 Jan 2025 20:45 GMT, 15 min19 Jan 2025 09:30 GMT, 3.8 h19 Jan 2025 13:30 GMT, 15 min19 Jan 2025 13:45 GMT, 15 min19 Jan 2025 18:45 GMT, 15 min19 Jan 2025 19:00 GMT, 15 min19 Jan 2025 19:30 GMT, 3.3 h19 Jan 2025 23:00 GMT, 15 min20 Jan 2025 08:30 GMT, 15 min20 Jan 2025 08:45 GMT, 30 min20 Jan 2025 09:15 GMT, 15 min20 Jan 2025 11:00 GMT, 15 min20 Jan 2025 18:45 GMT, 45 min20 Jan 2025 20:30 GMT, 15 min21 Jan 2025 20:00 GMT, 15 min21 Jan 2025 20:30 GMT, 15 min21 Jan 2025 20:45 GMT, 15 min24 Jan 2025 02:15 GMT, 22 h25 Jan 2025 08:45 GMT, 4.5 h25 Jan 2025 13:45 GMT, 15 min25 Jan 2025 18:00 GMT, 2.3 h26 Jan 2025 09:00 GMT, 3 h26 Jan 2025 12:15 GMT, 60 min26 Jan 2025 13:15 GMT, 15 min26 Jan 2025 15:30 GMT, 104.5 h31 Jan 2025 03:30 GMT, 21.5 h1 Feb 2025 08:30 GMT, 11.3 h1 Feb 2025 20:15 GMT, 45 min2 Feb 2025 08:45 GMT, 4.8 h2 Feb 2025 13:45 GMT, 15 min2 Feb 2025 14:30 GMT, 15 min2 Feb 2025 18:00 GMT, 15 min2 Feb 2025 19:00 GMT, 4 h3 Feb 2025 08:00 GMT, 90 min3 Feb 2025 11:30 GMT, 15 min3 Feb 2025 20:15 GMT, 30 min10 Feb 2025 23:15 GMT, 45 min11 Feb 2025 08:15 GMT, 15 min11 Feb 2025 18:45 GMT, 2.5 h12 Feb 2025 08:00 GMT, 105 min21 Feb 2025 21:00 GMT, 30 min23 Feb 2025 22:00 GMT, 105 min22 Mar 2025 20:00 GMT, 15.8 h23 Mar 2025 11:45 GMT, 75 min23 Mar 2025 13:00 GMT, 3.3 h23 Mar 2025 16:45 GMT, 45 min23 Mar 2025 17:30 GMT, 15 min26 May 2025 23:00 GMT, 30 min27 May 2025 00:15 GMT, 75 min29 May 2025 04:00 GMT, 7 h30 May 2025 08:15 GMT, 2.5 h1 Jun 2025 13:15 GMT, 60 min10 Jun 2025 01:00 GMT, 3 h22 Jun 2025 19:45 GMT, 90 min22 Jun 2025 21:30 GMT, 60 min6 Jul 2025 19:30 GMT, 45 min6 Jul 2025 23:15 GMT, 105 min15 Jul 2025 19:45 GMT, 2.3 h19 Jul 2025 15:45 GMT, 2.8 h20 Jul 2025 16:30 GMT, 9.5 h21 Jul 2025 02:00 GMT, 15 min21 Jul 2025 02:15 GMT, 15 min10 Sep 2025 21:45 GMT, 30 min11 Sep 2025 18:15 GMT, 30 min11 Sep 2025 19:00 GMT, 60 min11 Sep 2025 21:30 GMT, 3.5 h12 Sep 2025 07:30 GMT, 4.3 h13 Sep 2025 23:45 GMT, 45 min15 Sep 2025 11:15 GMT, 23 h16 Sep 2025 14:30 GMT, 3 h17 Sep 2025 05:00 GMT, 10.8 h17 Sep 2025 15:45 GMT, 15 min20 Sep 2025 10:15 GMT, 32.3 h21 Sep 2025 18:30 GMT, 2.5 h28 Sep 2025 02:00 GMT, 8.5 h28 Sep 2025 10:30 GMT, 75 min3 Oct 2025 14:15 GMT, 37 h5 Oct 2025 03:15 GMT, 15 min5 Oct 2025 07:15 GMT, 4.3 h19 Oct 2025 17:30 GMT, 28 h20 Oct 2025 21:30 GMT, 60 min20 Oct 2025 23:00 GMT, 15 min21 Oct 2025 10:30 GMT, 75 min21 Oct 2025 12:30 GMT, 30 min21 Oct 2025 13:30 GMT, 90 min21 Oct 2025 16:30 GMT, 60 min21 Oct 2025 17:45 GMT, 15 min21 Oct 2025 20:45 GMT, 15 min25 Oct 2025 00:00 GMT, 75 min27 Oct 2025 03:30 GMT, 60 min27 Oct 2025 05:45 GMT, 15 min27 Oct 2025 08:00 GMT, 2.3 h28 Oct 2025 06:15 GMT, 6.8 h28 Oct 2025 20:15 GMT, 15 min29 Oct 2025 03:15 GMT, 75 min29 Oct 2025 05:15 GMT, 90 min29 Oct 2025 07:45 GMT, 5.8 h29 Oct 2025 13:30 GMT, 15 min29 Oct 2025 21:15 GMT, 3.3 h31 Oct 2025 01:00 GMT, 3 h31 Oct 2025 07:30 GMT, 5.5 h31 Oct 2025 13:45 GMT, 15 min31 Oct 2025 15:30 GMT, 2.3 h31 Oct 2025 20:15 GMT, 15 min1 Nov 2025 08:00 GMT, 11.5 h5 Nov 2025 00:15 GMT, 15 min5 Nov 2025 05:45 GMT, 7 h7 Nov 2025 19:30 GMT, 5 h10 Nov 2025 01:30 GMT, 3 h10 Nov 2025 07:45 GMT, 4 h10 Nov 2025 18:30 GMT, 5.3 h11 Nov 2025 08:00 GMT, 64.5 h14 Nov 2025 02:45 GMT, 93.3 h18 Nov 2025 07:30 GMT, 32.5 h19 Nov 2025 16:00 GMT, 32 h21 Nov 2025 07:30 GMT, 3.8 h21 Nov 2025 18:00 GMT, 30 min21 Nov 2025 18:30 GMT, 3 h22 Nov 2025 04:15 GMT, 20.5 h23 Nov 2025 06:15 GMT, 66 h26 Nov 2025 07:30 GMT, 6.8 h26 Nov 2025 15:00 GMT, 30 min26 Nov 2025 15:45 GMT, 15 min26 Nov 2025 16:30 GMT, 45 min26 Nov 2025 17:45 GMT, 6 h27 Nov 2025 07:45 GMT, 3.3 h27 Nov 2025 11:00 GMT, 60 min27 Nov 2025 13:45 GMT, 30 min27 Nov 2025 18:45 GMT, 2 h28 Nov 2025 08:45 GMT, 60 min28 Nov 2025 11:30 GMT, 15 min28 Nov 2025 12:30 GMT, 13 h29 Nov 2025 01:30 GMT, 94.5 h3 Dec 2025 00:15 GMT, 15 min3 Dec 2025 07:45 GMT, 3 h3 Dec 2025 10:45 GMT, 15 min3 Dec 2025 11:15 GMT, 45 min3 Dec 2025 16:00 GMT, 15 min3 Dec 2025 19:15 GMT, 30 min3 Dec 2025 20:00 GMT, 60 min3 Dec 2025 22:00 GMT, 30 min4 Dec 2025 08:00 GMT, 2 h4 Dec 2025 11:15 GMT, 45 min4 Dec 2025 13:00 GMT, 15 min4 Dec 2025 13:45 GMT, 12.8 h5 Dec 2025 02:30 GMT, 190.8 h13 Dec 2025 01:15 GMT, 4.3 h13 Dec 2025 06:15 GMT, 18.3 h14 Dec 2025 00:45 GMT, 45 min14 Dec 2025 08:45 GMT, 15 h15 Dec 2025 03:15 GMT, 45 h17 Dec 2025 00:15 GMT, 2 h17 Dec 2025 03:15 GMT, 45 min17 Dec 2025 05:00 GMT, 45 min17 Dec 2025 06:45 GMT, 91.5 h21 Dec 2025 03:15 GMT, 45 min21 Dec 2025 07:45 GMT, 65.5 h24 Dec 2025 08:15 GMT, 12.8 h24 Dec 2025 21:30 GMT, 60 min24 Dec 2025 23:00 GMT, 60 min25 Dec 2025 09:00 GMT, 5.5 h25 Dec 2025 14:45 GMT, 15 min25 Dec 2025 16:00 GMT, 45 min25 Dec 2025 17:30 GMT, 15 min25 Dec 2025 17:45 GMT, 15 min25 Dec 2025 19:15 GMT, 45 min26 Dec 2025 09:45 GMT, 4.3 h27 Dec 2025 12:15 GMT, 45 min27 Dec 2025 13:00 GMT, 15 min28 Dec 2025 11:30 GMT, 30 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

050k100k150kJan 2025: 500 h spilling ≈ 37,963 m³ (range 15,122–95,308 m³)JanFeb 2025: 32 h spilling ≈ 2,446 m³ (range 974–6,140 m³)FebMar 2025: 21 h spilling ≈ 1,610 m³ (range 641–4,043 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 11 h spilling ≈ 851 m³ (range 339–2,136 m³)MayJun 2025: 6.5 h spilling ≈ 494 m³ (range 197–1,240 m³)JunJul 2025: 18 h spilling ≈ 1,329 m³ (range 529–3,337 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 92 h spilling ≈ 6,988 m³ (range 2,783–17,544 m³)SepOct 2025: 111 h spilling ≈ 8,393 m³ (range 3,343–21,072 m³)OctNov 2025: 434 h spilling ≈ 32,950 m³ (range 13,125–82,723 m³)NovDec 2025: 534 h spilling ≈ 40,546 m³ (range 16,150–101,792 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Dec 2025, 02:30Ben Rhydding (Ilkley) Wpc Works, St7.9 days5,771 – 36,375 m³
26 Jan 2025, 15:30Ben Rhydding (Ilkley) Wpc Works, St4.4 days3,162 – 19,927 m³
13 Jan 2025, 01:45Ben Rhydding (Ilkley) Wpc Works, St3.9 days2,867 – 18,068 m³
29 Nov 2025, 01:30Ben Rhydding (Ilkley) Wpc Works, St3.9 days2,859 – 18,020 m³
14 Nov 2025, 02:45Ben Rhydding (Ilkley) Wpc Works, St3.9 days2,821 – 17,782 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate133,570 m³range 53,204 – 335,333 m³
In litres133.6 millionrange 53.2 million – 335.3 million L
Olympic swimming pools53at 2,500 m³ each
Organic load, as people's raw sewage200,355person-days of untreated BOD

Assumed spill rate while spilling: 8.4 – 53.0 L/s (central 21.1 L/s), from a dry-weather flow of 8.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 2,128 kg12,021 kg67,067 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 5,586 kg56,767 kg241,775 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 101 kg841 kg3,119 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 64 kg347 kg1,811 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 5.3 trillion organisms133.6 trillion organisms3.4 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Ben Rhydding (Ilkley) Wpc Works, St

Storm tank at sewage works · discharges to River Wharfe

Spills 2025
127 (1,759 hours) · down 20% on 2024
Spills 2024
158 (2,505 hours)
Long-term average
122.8 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Wharfe from Barben Beck/River Dibb to Hundwith Beck (GB104027064257)
Outlet location
SE1474047310 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00173 · 27/19/0044 · company name: BEN RHYDDING/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.