Storm overflow register · Yorkshire Water

Cowesby sewage works: storm overflow spills 2025

Cowesby sewage treatment works, run by Yorkshire Water, has 1 monitored storm overflow discharging to Unnamed Trib of Little Beck. In 2025 it recorded 39 spills totalling 447 hours, against 56 spills and 748 hours in 2024. By hours spilling, it ranks 106 of 283 Yorkshire Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCowesby Sewage…5 Jan 2025 13:30 GMT, 46 h7 Jan 2025 11:45 GMT, 75 min13 Mar 2025 12:45 GMT, 15 min13 Mar 2025 13:15 GMT, 15 min18 Jul 2025 19:45 GMT, 105 min19 Jul 2025 14:00 GMT, 5.8 h19 Jul 2025 19:45 GMT, 15 min19 Jul 2025 21:00 GMT, 15 min20 Sep 2025 12:30 GMT, 90 min20 Sep 2025 16:00 GMT, 21.5 h21 Sep 2025 13:30 GMT, 75 min21 Sep 2025 16:15 GMT, 45 min21 Sep 2025 18:00 GMT, 15 min21 Sep 2025 19:15 GMT, 15 min3 Oct 2025 15:30 GMT, 45 min3 Oct 2025 16:30 GMT, 30 min3 Oct 2025 17:15 GMT, 45 min3 Oct 2025 18:00 GMT, 45 min3 Oct 2025 18:45 GMT, 4.8 h3 Oct 2025 23:30 GMT, 2.3 h4 Oct 2025 02:30 GMT, 30 min19 Oct 2025 23:45 GMT, 2 h24 Oct 2025 21:00 GMT, 3.8 h25 Oct 2025 01:00 GMT, 60 min25 Oct 2025 02:15 GMT, 60 min25 Oct 2025 03:15 GMT, 10.8 h25 Oct 2025 14:15 GMT, 45 min25 Oct 2025 15:00 GMT, 15 min25 Oct 2025 15:15 GMT, 45 min11 Nov 2025 21:30 GMT, 90 min11 Nov 2025 23:00 GMT, 15 min12 Nov 2025 19:15 GMT, 15 min12 Nov 2025 19:30 GMT, 75 min12 Nov 2025 20:45 GMT, 5.8 h13 Nov 2025 02:45 GMT, 19 h13 Nov 2025 21:45 GMT, 60 min13 Nov 2025 23:00 GMT, 60 min14 Nov 2025 00:15 GMT, 60 min14 Nov 2025 01:30 GMT, 59.3 h16 Nov 2025 15:00 GMT, 15 min16 Nov 2025 16:15 GMT, 15 min16 Nov 2025 19:30 GMT, 30 min16 Nov 2025 21:00 GMT, 15 min16 Nov 2025 22:15 GMT, 15 min19 Nov 2025 03:15 GMT, 23.5 h20 Nov 2025 02:45 GMT, 15 min20 Nov 2025 03:00 GMT, 15 min20 Nov 2025 03:30 GMT, 30 min20 Nov 2025 04:00 GMT, 15 min20 Nov 2025 06:00 GMT, 15 min20 Nov 2025 06:30 GMT, 15 min20 Nov 2025 07:00 GMT, 45 min20 Nov 2025 08:00 GMT, 15 min20 Nov 2025 08:30 GMT, 15 min22 Nov 2025 10:30 GMT, 15 min23 Nov 2025 07:30 GMT, 62.8 h25 Nov 2025 22:30 GMT, 15 min25 Nov 2025 23:00 GMT, 30 min25 Nov 2025 23:45 GMT, 15 min26 Nov 2025 18:15 GMT, 3.5 h29 Nov 2025 14:15 GMT, 73.3 h2 Dec 2025 15:45 GMT, 45 min2 Dec 2025 17:00 GMT, 30 min2 Dec 2025 17:45 GMT, 45 min5 Dec 2025 19:30 GMT, 6.5 h7 Dec 2025 16:15 GMT, 2.3 h7 Dec 2025 19:15 GMT, 15 min9 Dec 2025 05:45 GMT, 2.8 h9 Dec 2025 08:45 GMT, 2 h9 Dec 2025 10:45 GMT, 15 min9 Dec 2025 11:30 GMT, 17.5 h10 Dec 2025 05:45 GMT, 15 min10 Dec 2025 07:00 GMT, 15 min10 Dec 2025 08:00 GMT, 30 min10 Dec 2025 08:45 GMT, 3.3 h15 Dec 2025 11:15 GMT, 13.3 h17 Dec 2025 21:15 GMT, 5.3 h18 Dec 2025 03:30 GMT, 15 min18 Dec 2025 04:45 GMT, 15 min18 Dec 2025 10:45 GMT, 15 min18 Dec 2025 11:30 GMT, 15 min18 Dec 2025 12:45 GMT, 15 min18 Dec 2025 14:15 GMT, 16.3 h19 Dec 2025 06:45 GMT, 30 min19 Dec 2025 07:45 GMT, 105 min

Hours spilling by month, 2025

0100200300Jan 2025: 47 hours spillingJanFeb 2025: 0.0 hours spillingFebMar 2025: 0.5 hours spillingMarApr 2025: 0.0 hours spillingAprMay 2025: 0.0 hours spillingMayJun 2025: 0.0 hours spillingJunJul 2025: 8.0 hours spillingJulAug 2025: 0.0 hours spillingAugSep 2025: 26 hours spillingSepOct 2025: 31 hours spillingOctNov 2025: 220 hours spillingNovDec 2025: 116 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
29 Nov 2025, 14:15Cowesby Sewage Treatment Works3.1 days
23 Nov 2025, 07:30Cowesby Sewage Treatment Works2.6 days
14 Nov 2025, 01:30Cowesby Sewage Treatment Works2.5 days
5 Jan 2025, 13:30Cowesby Sewage Treatment Works1.9 days
19 Nov 2025, 03:15Cowesby Sewage Treatment Works23.5 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate7,656 m³range 3,049 – 19,220 m³
In litres7.7 millionrange 3.0 million – 19.2 million L
Olympic swimming pools3.1at 2,500 m³ each
Organic load, as people's raw sewage11,483person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 122 kg689 kg3,844 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 320 kg3,254 kg13,858 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 5.8 kg48 kg179 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 3.7 kg20 kg104 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 304.9 billion organisms7.7 trillion organisms192.2 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Cowesby Sewage Treatment Works

Inlet overflow at sewage works · discharges to Unnamed Trib of Little Beck

Spills 2025
39 (447 hours) · down 30% on 2024
Spills 2024
56 (748 hours)
Long-term average
51.2 spills a year (monitored since 2020)
Monitor uptime
99% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Broad Beck from Source to Cod Beck (GB104027068950)
Outlet location
SE4645089550 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00350 · 27/23/0215 · company name: COWESBY/STW/6XDWF OVERFLOW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.