Storm overflow register · Yorkshire Water

Earby sewage works: storm overflow spills 2025

Earby sewage treatment works, run by Yorkshire Water, has 2 monitored storm overflows discharging to Earby Beck. In 2025 they recorded 135 spills totalling 419 hours, against 178 spills and 718 hours in 2024. By hours spilling, it ranks 108 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 8,413 population equivalent (EARBY STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecEarby Sewage…1 Jan 2025 00:00 GMT, 4.3 h1 Jan 2025 04:30 GMT, 4 h1 Jan 2025 08:45 GMT, 14.8 h5 Jan 2025 22:00 GMT, 60 min5 Jan 2025 23:15 GMT, 15 min6 Jan 2025 00:00 GMT, 75 min6 Jan 2025 01:30 GMT, 5 h6 Jan 2025 06:45 GMT, 60 min6 Jan 2025 08:15 GMT, 60 min6 Jan 2025 11:15 GMT, 30 min6 Jan 2025 12:00 GMT, 8 h6 Jan 2025 23:30 GMT, 75 min14 Jan 2025 08:00 GMT, 5.5 h26 Jan 2025 16:15 GMT, 15 min26 Jan 2025 17:15 GMT, 15 min27 Jan 2025 02:30 GMT, 2.5 h27 Jan 2025 05:15 GMT, 2.3 h27 Jan 2025 08:00 GMT, 15 min20 Feb 2025 00:45 GMT, 15 min20 Feb 2025 13:30 GMT, 15 min20 Feb 2025 14:00 GMT, 90 min23 Feb 2025 20:30 GMT, 30 min7 Mar 2025 00:30 GMT, 90 min23 Mar 2025 03:00 GMT, 45 min26 May 2025 17:30 GMT, 15 min26 May 2025 18:30 GMT, 15 min26 May 2025 19:15 GMT, 15 min26 May 2025 20:00 GMT, 15 min26 May 2025 20:45 GMT, 2.3 h29 May 2025 04:00 GMT, 6.8 h30 May 2025 06:15 GMT, 90 min3 Jun 2025 03:15 GMT, 15 min3 Jun 2025 05:45 GMT, 45 min3 Jun 2025 06:45 GMT, 30 min7 Jun 2025 08:15 GMT, 15 min7 Jun 2025 09:00 GMT, 15 min8 Jun 2025 12:30 GMT, 15 min9 Jun 2025 22:00 GMT, 8.3 h22 Jun 2025 14:45 GMT, 15 min22 Jun 2025 18:00 GMT, 15 min22 Jun 2025 21:30 GMT, 15 min5 Jul 2025 09:00 GMT, 15 min6 Jul 2025 18:30 GMT, 2.5 h15 Jul 2025 16:00 GMT, 5 h20 Jul 2025 14:15 GMT, 4.5 h20 Jul 2025 19:00 GMT, 60 min23 Jul 2025 18:45 GMT, 15 min23 Jul 2025 19:15 GMT, 15 min23 Jul 2025 19:45 GMT, 30 min23 Jul 2025 20:45 GMT, 15 min4 Aug 2025 07:30 GMT, 45 min4 Aug 2025 10:00 GMT, 15 min4 Aug 2025 11:15 GMT, 15 min4 Aug 2025 11:45 GMT, 30 min28 Aug 2025 16:15 GMT, 45 min30 Aug 2025 16:00 GMT, 15 min30 Aug 2025 20:15 GMT, 45 min3 Sep 2025 03:45 GMT, 15 min8 Sep 2025 16:00 GMT, 30 min10 Sep 2025 21:30 GMT, 15 min12 Sep 2025 07:15 GMT, 6.8 h13 Sep 2025 21:15 GMT, 90 min15 Sep 2025 04:45 GMT, 15 min15 Sep 2025 06:45 GMT, 2.3 h15 Sep 2025 09:15 GMT, 90 min15 Sep 2025 11:15 GMT, 15 min15 Sep 2025 11:45 GMT, 2.5 h15 Sep 2025 14:45 GMT, 15 min15 Sep 2025 15:15 GMT, 30 min15 Sep 2025 22:30 GMT, 15 min16 Sep 2025 03:30 GMT, 15 min16 Sep 2025 04:00 GMT, 45 min16 Sep 2025 05:00 GMT, 15 min17 Sep 2025 04:00 GMT, 15 min17 Sep 2025 05:00 GMT, 15 min17 Sep 2025 08:00 GMT, 15 min17 Sep 2025 09:15 GMT, 15 min20 Sep 2025 06:15 GMT, 15 min20 Sep 2025 11:15 GMT, 15 min20 Sep 2025 12:00 GMT, 15 min20 Sep 2025 12:45 GMT, 15 min20 Sep 2025 13:45 GMT, 15 min20 Sep 2025 16:15 GMT, 16.3 h21 Sep 2025 08:45 GMT, 15 min21 Sep 2025 09:45 GMT, 15 min27 Sep 2025 21:45 GMT, 2.5 h2 Oct 2025 22:45 GMT, 15 min3 Oct 2025 13:15 GMT, 30 min3 Oct 2025 14:00 GMT, 11.3 h4 Oct 2025 01:30 GMT, 15 min4 Oct 2025 02:00 GMT, 15 min4 Oct 2025 03:00 GMT, 15 min4 Oct 2025 03:45 GMT, 15 min4 Oct 2025 04:30 GMT, 30 min4 Oct 2025 05:45 GMT, 30 min4 Oct 2025 06:30 GMT, 45 min4 Oct 2025 08:00 GMT, 15.8 h5 Oct 2025 00:00 GMT, 15 min19 Oct 2025 19:30 GMT, 15 min19 Oct 2025 20:00 GMT, 75 min19 Oct 2025 21:45 GMT, 90 min29 Oct 2025 21:00 GMT, 15 min3 Nov 2025 07:30 GMT, 30 min3 Nov 2025 08:15 GMT, 15 min3 Nov 2025 08:45 GMT, 45 min3 Nov 2025 09:45 GMT, 15 min3 Nov 2025 10:30 GMT, 75 min4 Nov 2025 05:00 GMT, 15 min4 Nov 2025 07:00 GMT, 15 min4 Nov 2025 08:00 GMT, 15 min4 Nov 2025 08:45 GMT, 15 min4 Nov 2025 11:45 GMT, 15 min5 Nov 2025 06:00 GMT, 15 min5 Nov 2025 06:45 GMT, 30 min11 Nov 2025 08:15 GMT, 60 min11 Nov 2025 09:30 GMT, 45 min11 Nov 2025 20:30 GMT, 3.3 h12 Nov 2025 18:00 GMT, 7.3 h14 Nov 2025 19:30 GMT, 15.8 h18 Nov 2025 11:15 GMT, 2 h18 Nov 2025 13:30 GMT, 5 h22 Nov 2025 04:30 GMT, 15 min22 Nov 2025 05:00 GMT, 15 min23 Nov 2025 12:00 GMT, 15 min23 Nov 2025 13:30 GMT, 15 min23 Nov 2025 20:00 GMT, 30 min23 Nov 2025 21:15 GMT, 15 min23 Nov 2025 22:15 GMT, 15 min23 Nov 2025 23:15 GMT, 15 min28 Nov 2025 12:30 GMT, 3 h29 Nov 2025 12:45 GMT, 90 min1 Dec 2025 02:00 GMT, 90 min1 Dec 2025 05:15 GMT, 5.5 h1 Dec 2025 11:15 GMT, 15 min1 Dec 2025 12:15 GMT, 15 min1 Dec 2025 12:45 GMT, 15 min1 Dec 2025 13:15 GMT, 15 min1 Dec 2025 14:15 GMT, 15 min5 Dec 2025 17:00 GMT, 30 min5 Dec 2025 18:30 GMT, 15 min6 Dec 2025 15:30 GMT, 15 min6 Dec 2025 17:15 GMT, 6 h6 Dec 2025 23:45 GMT, 30 min7 Dec 2025 01:00 GMT, 15 min7 Dec 2025 15:30 GMT, 15 min7 Dec 2025 16:30 GMT, 15 min7 Dec 2025 18:00 GMT, 15 min9 Dec 2025 04:30 GMT, 15 min9 Dec 2025 05:30 GMT, 5.5 h9 Dec 2025 11:30 GMT, 15 min10 Dec 2025 09:00 GMT, 15 min10 Dec 2025 09:30 GMT, 15 min10 Dec 2025 10:30 GMT, 15 min14 Dec 2025 12:30 GMT, 15 min14 Dec 2025 13:00 GMT, 15 min15 Dec 2025 00:30 GMT, 15 min15 Dec 2025 03:30 GMT, 2.3 h15 Dec 2025 06:30 GMT, 15 min15 Dec 2025 07:00 GMT, 45 min15 Dec 2025 08:00 GMT, 75 min15 Dec 2025 09:30 GMT, 12.8 h17 Dec 2025 20:15 GMT, 5.8 h18 Dec 2025 16:15 GMT, 45 min18 Dec 2025 18:30 GMT, 2.3 h18 Dec 2025 23:00 GMT, 75 min19 Dec 2025 06:00 GMT, 30 min19 Dec 2025 06:45 GMT, 105 minEarby Sewage…1 Jan 2025 00:00 GMT, 19.5 h1 Jan 2025 19:45 GMT, 15 min1 Jan 2025 20:45 GMT, 30 min6 Jan 2025 05:45 GMT, 15 min6 Jan 2025 16:45 GMT, 30 min26 Jan 2025 16:45 GMT, 15 min26 Jan 2025 17:15 GMT, 15 min27 Jan 2025 02:45 GMT, 3.8 h27 Jan 2025 12:15 GMT, 105 min27 Jan 2025 23:15 GMT, 15 min20 Feb 2025 14:30 GMT, 30 min7 Mar 2025 00:45 GMT, 30 min7 Mar 2025 01:30 GMT, 15 min26 May 2025 18:30 GMT, 60 min26 May 2025 23:00 GMT, 30 min29 May 2025 05:15 GMT, 75 min29 May 2025 07:00 GMT, 15 min29 May 2025 07:45 GMT, 45 min29 May 2025 09:45 GMT, 15 min30 May 2025 07:00 GMT, 15 min3 Jun 2025 07:00 GMT, 15 min3 Jun 2025 08:15 GMT, 15 min8 Jun 2025 13:15 GMT, 15 min9 Jun 2025 22:00 GMT, 15 min9 Jun 2025 23:00 GMT, 15 min10 Jun 2025 02:30 GMT, 45 min10 Jun 2025 04:45 GMT, 30 min22 Jun 2025 18:30 GMT, 15 min6 Jul 2025 20:00 GMT, 15 min6 Jul 2025 20:45 GMT, 15 min15 Jul 2025 16:00 GMT, 2 h15 Jul 2025 19:15 GMT, 45 min20 Jul 2025 14:15 GMT, 15 min20 Jul 2025 16:00 GMT, 15 min20 Jul 2025 19:15 GMT, 15 min23 Jul 2025 18:45 GMT, 15 min23 Jul 2025 19:15 GMT, 30 min23 Jul 2025 20:30 GMT, 15 min4 Aug 2025 12:00 GMT, 15 min30 Aug 2025 20:30 GMT, 15 min3 Sep 2025 03:00 GMT, 30 min4 Sep 2025 11:15 GMT, 15 min12 Sep 2025 07:00 GMT, 15 min12 Sep 2025 10:00 GMT, 45 min12 Sep 2025 12:45 GMT, 30 min13 Sep 2025 21:30 GMT, 15 min13 Sep 2025 22:00 GMT, 15 min15 Sep 2025 06:45 GMT, 15 min15 Sep 2025 07:30 GMT, 45 min15 Sep 2025 12:15 GMT, 15 min15 Sep 2025 19:30 GMT, 75 min16 Sep 2025 02:30 GMT, 30 min16 Sep 2025 07:15 GMT, 105 min16 Sep 2025 10:15 GMT, 30 min17 Sep 2025 11:15 GMT, 2.5 h20 Sep 2025 07:00 GMT, 30 min20 Sep 2025 11:00 GMT, 15 min20 Sep 2025 14:30 GMT, 75 min20 Sep 2025 16:15 GMT, 12.5 h21 Sep 2025 05:00 GMT, 60 min21 Sep 2025 06:30 GMT, 30 min21 Sep 2025 10:45 GMT, 60 min27 Sep 2025 23:15 GMT, 15 min2 Oct 2025 23:30 GMT, 15 min3 Oct 2025 00:30 GMT, 45 min3 Oct 2025 06:30 GMT, 30 min3 Oct 2025 13:30 GMT, 11 h4 Oct 2025 00:45 GMT, 15 min4 Oct 2025 03:15 GMT, 15 min4 Oct 2025 04:30 GMT, 15 min4 Oct 2025 08:30 GMT, 14 h4 Oct 2025 23:00 GMT, 15 min5 Oct 2025 01:00 GMT, 30 min19 Oct 2025 16:45 GMT, 30 min19 Oct 2025 21:45 GMT, 15 min20 Oct 2025 00:15 GMT, 45 min29 Oct 2025 20:45 GMT, 15 min29 Oct 2025 21:15 GMT, 15 min3 Nov 2025 05:15 GMT, 15 min3 Nov 2025 05:45 GMT, 15 min3 Nov 2025 10:30 GMT, 30 min4 Nov 2025 04:45 GMT, 15 min4 Nov 2025 05:15 GMT, 15 min4 Nov 2025 06:45 GMT, 30 min4 Nov 2025 09:30 GMT, 45 min4 Nov 2025 19:00 GMT, 15 min4 Nov 2025 19:45 GMT, 2 h5 Nov 2025 08:15 GMT, 15 min5 Nov 2025 09:00 GMT, 2 h11 Nov 2025 08:30 GMT, 15 min11 Nov 2025 22:15 GMT, 30 min12 Nov 2025 22:00 GMT, 2.5 h14 Nov 2025 22:15 GMT, 3.3 h15 Nov 2025 02:15 GMT, 15 min15 Nov 2025 04:30 GMT, 30 min15 Nov 2025 05:30 GMT, 45 min15 Nov 2025 06:30 GMT, 75 min18 Nov 2025 13:00 GMT, 15 min18 Nov 2025 17:00 GMT, 15 min18 Nov 2025 19:30 GMT, 30 min18 Nov 2025 20:15 GMT, 30 min22 Nov 2025 05:00 GMT, 15 min23 Nov 2025 12:30 GMT, 15 min23 Nov 2025 14:00 GMT, 15 min23 Nov 2025 18:00 GMT, 15 min23 Nov 2025 21:30 GMT, 15 min23 Nov 2025 22:45 GMT, 45 min28 Nov 2025 12:45 GMT, 15 min28 Nov 2025 14:30 GMT, 15 min29 Nov 2025 13:30 GMT, 15 min1 Dec 2025 02:45 GMT, 15 min1 Dec 2025 09:45 GMT, 2.8 h1 Dec 2025 13:45 GMT, 3.5 h1 Dec 2025 21:15 GMT, 105 min4 Dec 2025 15:30 GMT, 15 min6 Dec 2025 20:45 GMT, 15 min6 Dec 2025 21:45 GMT, 15 min7 Dec 2025 02:00 GMT, 2 h7 Dec 2025 16:15 GMT, 45 min7 Dec 2025 19:45 GMT, 90 min9 Dec 2025 04:15 GMT, 15 min9 Dec 2025 05:45 GMT, 15 min9 Dec 2025 06:15 GMT, 30 min9 Dec 2025 07:00 GMT, 2.8 h9 Dec 2025 10:00 GMT, 15 min9 Dec 2025 14:30 GMT, 2.8 h10 Dec 2025 09:45 GMT, 15 min14 Dec 2025 13:15 GMT, 15 min15 Dec 2025 14:30 GMT, 15 min15 Dec 2025 15:00 GMT, 75 min15 Dec 2025 19:00 GMT, 90 min17 Dec 2025 20:15 GMT, 15 min17 Dec 2025 21:15 GMT, 15 min17 Dec 2025 23:15 GMT, 105 min18 Dec 2025 19:15 GMT, 30 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

010k20k30kJan 2025: 80 h spilling ≈ 11,590 m³ (range 4,616–29,097 m³)JanFeb 2025: 3.0 h spilling ≈ 432 m³ (range 172–1,086 m³)FebMar 2025: 3.0 h spilling ≈ 432 m³ (range 172–1,086 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 16 h spilling ≈ 2,263 m³ (range 901–5,682 m³)MayJun 2025: 14 h spilling ≈ 2,018 m³ (range 804–5,067 m³)JunJul 2025: 20 h spilling ≈ 2,811 m³ (range 1,120–7,057 m³)JulAug 2025: 4.0 h spilling ≈ 577 m³ (range 230–1,448 m³)AugSep 2025: 68 h spilling ≈ 9,745 m³ (range 3,882–24,464 m³)SepOct 2025: 64 h spilling ≈ 9,226 m³ (range 3,675–23,162 m³)OctNov 2025: 68 h spilling ≈ 9,745 m³ (range 3,882–24,464 m³)NovDec 2025: 80 h spilling ≈ 11,532 m³ (range 4,593–28,952 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
1 Jan 2025, 00:00Earby Sewage Treatment Works19.5 h1,120 – 7,057 m³
20 Sep 2025, 16:15Earby Sewage Treatment Works16.3 h933 – 5,881 m³
14 Nov 2025, 19:30Earby Sewage Treatment Works15.8 h904 – 5,700 m³
4 Oct 2025, 08:00Earby Sewage Treatment Works15.8 h904 – 5,700 m³
1 Jan 2025, 08:45Earby Sewage Treatment Works14.8 h847 – 5,338 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate60,371 m³range 24,047 – 151,563 m³
In litres60.4 millionrange 24.0 million – 151.6 million L
Olympic swimming pools24at 2,500 m³ each
Organic load, as people's raw sewage90,556person-days of untreated BOD

Assumed spill rate while spilling: 15.9 – 100.5 L/s (central 40.0 L/s), from a dry-weather flow of 15.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 962 kg5,433 kg30,313 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 2,525 kg25,658 kg109,277 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 46 kg380 kg1,410 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 29 kg157 kg818 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 2.4 trillion organisms60.4 trillion organisms1.5 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Earby Sewage Treatment Works

Inlet overflow at sewage works · discharges to Earby Beck

Spills 2025
73 (273 hours) · down 23% on 2024
Spills 2024
95 (458 hours)
Long-term average
99.4 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Earby Beck from Source to Langber beck (GB104027062980)
Outlet location
SD9095047240 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00758 · 3761(SS) · company name: EARBY/STW

Earby Sewage Treatment Works

Inlet overflow at sewage works · discharges to Earby Beck

Spills 2025
62 (146 hours) · down 25% on 2024
Spills 2024
83 (260 hours)
Long-term average
70.3 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Earby Beck from Source to Langber beck (GB104027062980)
Outlet location
SD9095047240 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00757 · 3761(SS) · company name: EARBY/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.