Storm overflow register · Yorkshire Water

Grimethorpe sewage works: storm overflow spills 2025

Grimethorpe sewage treatment works, run by Yorkshire Water, has 2 monitored storm overflows discharging to Shafton Beck. In 2025 they recorded 39 spills totalling 375 hours, against 67 spills and 597 hours in 2024. By hours spilling, it ranks 116 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 13,257 population equivalent (GRIMETHORPE STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecGrimethorpe STW1 Jan 2025 00:45 GMT, 23.3 h2 Jan 2025 00:00 GMT, 30 min2 Jan 2025 00:30 GMT, 15 min2 Jan 2025 00:45 GMT, 15 min2 Jan 2025 01:15 GMT, 15 min2 Jan 2025 01:30 GMT, 15 min2 Jan 2025 01:45 GMT, 15 min2 Jan 2025 02:00 GMT, 15 min2 Jan 2025 02:15 GMT, 15 min2 Jan 2025 02:45 GMT, 15 min2 Jan 2025 03:00 GMT, 15 min2 Jan 2025 03:15 GMT, 15 min2 Jan 2025 03:30 GMT, 15 min2 Jan 2025 03:45 GMT, 15 min2 Jan 2025 04:00 GMT, 15 min2 Jan 2025 04:30 GMT, 15 min2 Jan 2025 04:45 GMT, 30 min2 Jan 2025 05:15 GMT, 15 min2 Jan 2025 05:30 GMT, 15 min2 Jan 2025 06:30 GMT, 90 min2 Jan 2025 08:15 GMT, 15 min2 Jan 2025 08:30 GMT, 15 min2 Jan 2025 09:00 GMT, 15 min2 Jan 2025 09:15 GMT, 15 min2 Jan 2025 09:30 GMT, 15 min2 Jan 2025 09:45 GMT, 15 min2 Jan 2025 10:15 GMT, 15 min2 Jan 2025 10:30 GMT, 15 min2 Jan 2025 11:00 GMT, 15 min2 Jan 2025 11:30 GMT, 15 min2 Jan 2025 11:45 GMT, 15 min2 Jan 2025 12:00 GMT, 15 min2 Jan 2025 12:45 GMT, 15 min5 Jan 2025 16:45 GMT, 4.3 h5 Jan 2025 21:15 GMT, 3.3 h6 Jan 2025 19:30 GMT, 75.5 h9 Jan 2025 23:30 GMT, 90 min10 Jan 2025 01:00 GMT, 30 min10 Jan 2025 01:45 GMT, 15 min10 Jan 2025 02:00 GMT, 30 min10 Jan 2025 02:30 GMT, 15 min10 Jan 2025 02:45 GMT, 15 min10 Jan 2025 03:00 GMT, 15 min10 Jan 2025 03:30 GMT, 15 min10 Jan 2025 03:45 GMT, 15 min10 Jan 2025 04:00 GMT, 15 min10 Jan 2025 04:15 GMT, 15 min10 Jan 2025 04:30 GMT, 15 min10 Jan 2025 05:30 GMT, 15 min10 Jan 2025 06:00 GMT, 15 min10 Jan 2025 06:15 GMT, 15 min10 Jan 2025 06:45 GMT, 15 min10 Jan 2025 07:00 GMT, 6.8 h10 Jan 2025 14:00 GMT, 15 min10 Jan 2025 14:15 GMT, 3 h10 Jan 2025 17:15 GMT, 5.5 h10 Jan 2025 22:45 GMT, 75 min11 Jan 2025 00:00 GMT, 30 min11 Jan 2025 00:45 GMT, 15 min11 Jan 2025 01:00 GMT, 15 min11 Jan 2025 01:15 GMT, 15 min11 Jan 2025 04:00 GMT, 15 min11 Jan 2025 07:45 GMT, 15 min11 Jan 2025 08:15 GMT, 15 min11 Jan 2025 08:45 GMT, 15 min11 Jan 2025 09:00 GMT, 15 min11 Jan 2025 09:15 GMT, 15 min11 Jan 2025 09:30 GMT, 6.3 h11 Jan 2025 15:45 GMT, 45 min11 Jan 2025 16:30 GMT, 15 min11 Jan 2025 16:45 GMT, 30 min11 Jan 2025 17:15 GMT, 3.3 h11 Jan 2025 20:30 GMT, 2 h11 Jan 2025 22:30 GMT, 30 min11 Jan 2025 23:00 GMT, 15 min11 Jan 2025 23:45 GMT, 15 min12 Jan 2025 00:30 GMT, 15 min12 Jan 2025 09:30 GMT, 75 min12 Jan 2025 10:45 GMT, 5 h12 Jan 2025 16:00 GMT, 15 min12 Jan 2025 16:15 GMT, 30 min12 Jan 2025 16:45 GMT, 5.8 h12 Jan 2025 22:30 GMT, 30 min12 Jan 2025 23:00 GMT, 15 min12 Jan 2025 23:30 GMT, 15 min13 Jan 2025 07:15 GMT, 15 min13 Jan 2025 07:30 GMT, 34.3 h14 Jan 2025 18:00 GMT, 47.3 h16 Jan 2025 17:30 GMT, 5.8 h16 Jan 2025 23:15 GMT, 10.5 h17 Jan 2025 09:45 GMT, 90 min17 Jan 2025 11:30 GMT, 10 h17 Jan 2025 21:30 GMT, 30 min18 Jan 2025 10:45 GMT, 2.3 h27 Jan 2025 04:15 GMT, 15 min27 Jan 2025 04:30 GMT, 15 min27 Jan 2025 05:00 GMT, 15 min27 Jan 2025 07:15 GMT, 15 min27 Jan 2025 07:45 GMT, 15 min27 Jan 2025 08:00 GMT, 15 min27 Jan 2025 08:15 GMT, 15 min27 Jan 2025 08:30 GMT, 15 min27 Jan 2025 10:15 GMT, 15 min27 Jan 2025 10:30 GMT, 15 min27 Jan 2025 10:45 GMT, 15 min27 Jan 2025 11:00 GMT, 15 min27 Jan 2025 11:30 GMT, 15 min27 Jan 2025 12:00 GMT, 15 min27 Jan 2025 12:15 GMT, 15 min27 Jan 2025 12:45 GMT, 15 min27 Jan 2025 13:00 GMT, 15 min27 Jan 2025 13:45 GMT, 15 min27 Jan 2025 14:00 GMT, 15 min27 Jan 2025 14:15 GMT, 15 min27 Jan 2025 15:30 GMT, 15 min27 Jan 2025 15:45 GMT, 15 min27 Jan 2025 16:00 GMT, 15 min27 Jan 2025 18:15 GMT, 15 min27 Jan 2025 18:30 GMT, 15 min27 Jan 2025 19:00 GMT, 15 min27 Jan 2025 19:30 GMT, 15 min27 Jan 2025 22:45 GMT, 15 min27 Jan 2025 23:00 GMT, 15 min20 Sep 2025 18:15 GMT, 15 min20 Sep 2025 18:30 GMT, 75 min20 Sep 2025 20:45 GMT, 45 min20 Sep 2025 22:00 GMT, 30 min20 Sep 2025 23:15 GMT, 45 min21 Sep 2025 00:30 GMT, 30 min14 Nov 2025 09:00 GMT, 15 min14 Nov 2025 09:30 GMT, 15 min14 Nov 2025 10:00 GMT, 15 min14 Nov 2025 10:15 GMT, 15 min14 Nov 2025 10:45 GMT, 15 min14 Nov 2025 11:00 GMT, 30 min14 Nov 2025 11:30 GMT, 30 min14 Nov 2025 12:00 GMT, 15 min14 Nov 2025 12:30 GMT, 75 min14 Nov 2025 14:00 GMT, 45 min14 Nov 2025 14:45 GMT, 90 min14 Nov 2025 16:15 GMT, 15 min14 Nov 2025 16:30 GMT, 26.5 h15 Nov 2025 19:30 GMT, 75 min15 Nov 2025 21:00 GMT, 15 min15 Nov 2025 21:30 GMT, 15 min23 Nov 2025 18:45 GMT, 15 min23 Nov 2025 19:00 GMT, 45 min23 Nov 2025 19:45 GMT, 60 min23 Nov 2025 21:30 GMT, 15 min29 Nov 2025 09:00 GMT, 15 min29 Nov 2025 09:15 GMT, 15 min29 Nov 2025 12:15 GMT, 15 min29 Nov 2025 12:30 GMT, 15 min29 Nov 2025 12:45 GMT, 15 min29 Nov 2025 13:00 GMT, 15 min29 Nov 2025 13:45 GMT, 15 min29 Nov 2025 15:00 GMT, 15 min29 Nov 2025 15:15 GMT, 15 min29 Nov 2025 15:30 GMT, 15 min29 Nov 2025 15:45 GMT, 15 min29 Nov 2025 16:45 GMT, 15 min29 Nov 2025 17:00 GMT, 15 min29 Nov 2025 18:45 GMT, 15 min29 Nov 2025 20:00 GMT, 105 min29 Nov 2025 22:00 GMT, 15 min29 Nov 2025 22:15 GMT, 15 min29 Nov 2025 23:15 GMT, 15 min29 Nov 2025 23:30 GMT, 15 min30 Nov 2025 00:30 GMT, 15 min30 Nov 2025 00:45 GMT, 15 min30 Nov 2025 02:15 GMT, 15 min30 Nov 2025 02:30 GMT, 15 min30 Nov 2025 03:15 GMT, 15 min30 Nov 2025 03:45 GMT, 15 min30 Nov 2025 06:45 GMT, 15 min30 Nov 2025 09:15 GMT, 15 min1 Dec 2025 20:00 GMT, 45 min4 Dec 2025 18:30 GMT, 15 min5 Dec 2025 20:45 GMT, 15 min5 Dec 2025 21:00 GMT, 15 min5 Dec 2025 21:30 GMT, 30 min5 Dec 2025 22:15 GMT, 15 min5 Dec 2025 22:30 GMT, 15 min5 Dec 2025 22:45 GMT, 15 min5 Dec 2025 23:15 GMT, 15 min5 Dec 2025 23:30 GMT, 15 min6 Dec 2025 14:15 GMT, 15 min9 Dec 2025 04:45 GMT, 4.5 h9 Dec 2025 09:30 GMT, 45 min9 Dec 2025 11:00 GMT, 15 min9 Dec 2025 11:45 GMT, 30 min9 Dec 2025 12:30 GMT, 15 min9 Dec 2025 12:45 GMT, 15 min9 Dec 2025 13:00 GMT, 15 min9 Dec 2025 13:30 GMT, 15 min9 Dec 2025 15:45 GMT, 60 min9 Dec 2025 20:00 GMT, 15 min9 Dec 2025 20:45 GMT, 15 min9 Dec 2025 21:00 GMT, 15 min15 Dec 2025 10:00 GMT, 30 min18 Dec 2025 14:00 GMT, 15 min18 Dec 2025 14:30 GMT, 60 min18 Dec 2025 16:00 GMT, 15 min18 Dec 2025 16:15 GMT, 15 min18 Dec 2025 16:45 GMT, 15 min18 Dec 2025 17:15 GMT, 15 min18 Dec 2025 17:30 GMT, 15 min18 Dec 2025 17:45 GMT, 15 min18 Dec 2025 18:00 GMT, 15 min18 Dec 2025 18:45 GMT, 15 min18 Dec 2025 19:00 GMT, 15 min18 Dec 2025 19:15 GMT, 15 min18 Dec 2025 20:00 GMT, 15 min18 Dec 2025 20:15 GMT, 15 min21 Dec 2025 21:30 GMT, 15 minGrimethorpe STW5 Jan 2025 21:00 GMT, 17 h6 Jan 2025 14:30 GMT, 30 min20 Sep 2025 18:45 GMT, 15 min14 Nov 2025 19:45 GMT, 15 min14 Nov 2025 20:15 GMT, 90 min14 Nov 2025 23:00 GMT, 15 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

050k100k150k200kJan 2025: 306 h spilling ≈ 69,576 m³ (range 27,714–174,674 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 4.2 h spilling ≈ 954 m³ (range 380–2,395 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 47 h spilling ≈ 10,676 m³ (range 4,253–26,803 m³)NovDec 2025: 17 h spilling ≈ 3,907 m³ (range 1,556–9,809 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
6 Jan 2025, 19:30Grimethorpe STW3.1 days6,831 – 43,056 m³
14 Jan 2025, 18:00Grimethorpe STW2.0 days4,275 – 26,945 m³
13 Jan 2025, 07:30Grimethorpe STW1.4 days3,099 – 19,532 m³
14 Nov 2025, 16:30Grimethorpe STW1.1 days2,398 – 15,112 m³
1 Jan 2025, 00:45Grimethorpe STW23.3 h2,104 – 13,259 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate85,136 m³range 33,912 – 213,738 m³
In litres85.1 millionrange 33.9 million – 213.7 million L
Olympic swimming pools34at 2,500 m³ each
Organic load, as people's raw sewage127,704person-days of untreated BOD

Assumed spill rate while spilling: 25.1 – 158.4 L/s (central 63.1 L/s), from a dry-weather flow of 25.1 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,356 kg7,662 kg42,748 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 3,561 kg36,183 kg154,105 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 64 kg536 kg1,988 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 41 kg221 kg1,154 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 3.4 trillion organisms85.1 trillion organisms2.1 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Grimethorpe STW

Storm tank at sewage works · discharges to Shafton Beck

Spills 2025
35 (355 hours) · down 44% on 2024
Spills 2024
62 (588 hours)
Long-term average
59.0 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Grimethorpe Dike from Source to River Dearne (GB104027063180)
Outlet location
SE4025009630 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00103 · 2246 · company name: GRIMETHORPE/STW/3XDWF OVERFLOW

Grimethorpe STW

Inlet overflow at sewage works · discharges to Shafton Beck

Spills 2025
4 (20 hours) · down 20% on 2024
Spills 2024
5 (8.8 hours)
Long-term average
6.0 spills a year (monitored since 2020)
Monitor uptime
100% of the year
Investigation
Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Grimethorpe Dike from Source to River Dearne (GB104027063180)
Outlet location
SE4025009630 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00104 · 2246 · company name: GRIMETHORPE/STW/6XDWF OVERFLOW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.