Pateley Bridge sewage works: storm overflow spills 2025

Pateley Bridge sewage treatment works, run by Yorkshire Water, has 2 monitored storm overflows discharging to River Nidd. In 2025 they recorded 94 spills totalling 1,326 hours, against 139 spills and 2,349 hours in 2024. By hours spilling, it ranks 23 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 2,358 population equivalent (PATELEY BRIDGE STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecPateley Bridge STW1 Jan 2025 00:00 GMT, 46.5 h2 Jan 2025 22:30 GMT, 60 min2 Jan 2025 23:30 GMT, 15 min2 Jan 2025 23:45 GMT, 45 min3 Jan 2025 00:30 GMT, 15 min3 Jan 2025 01:00 GMT, 15 min3 Jan 2025 01:15 GMT, 15 min3 Jan 2025 02:15 GMT, 15 min3 Jan 2025 10:15 GMT, 15 min3 Jan 2025 10:30 GMT, 15 min3 Jan 2025 10:45 GMT, 45 min5 Jan 2025 17:30 GMT, 4 h5 Jan 2025 21:45 GMT, 49.5 h7 Jan 2025 23:15 GMT, 60 min8 Jan 2025 00:15 GMT, 30 min8 Jan 2025 00:45 GMT, 15 min8 Jan 2025 01:15 GMT, 15 min8 Jan 2025 01:30 GMT, 30 min8 Jan 2025 02:15 GMT, 15 min8 Jan 2025 02:45 GMT, 15 min8 Jan 2025 03:00 GMT, 15 min8 Jan 2025 04:15 GMT, 15 min8 Jan 2025 05:15 GMT, 15 min8 Jan 2025 06:30 GMT, 15 min8 Jan 2025 07:15 GMT, 30 min8 Jan 2025 08:00 GMT, 15 min8 Jan 2025 08:15 GMT, 30 min8 Jan 2025 08:45 GMT, 15 min8 Jan 2025 09:00 GMT, 15 min8 Jan 2025 09:30 GMT, 30 min8 Jan 2025 10:30 GMT, 15 min8 Jan 2025 10:45 GMT, 15 min8 Jan 2025 11:00 GMT, 45 min8 Jan 2025 11:45 GMT, 15 min8 Jan 2025 12:15 GMT, 15 min8 Jan 2025 12:30 GMT, 15 min8 Jan 2025 12:45 GMT, 15 min8 Jan 2025 13:15 GMT, 15 min8 Jan 2025 14:00 GMT, 15 min8 Jan 2025 14:15 GMT, 15 min8 Jan 2025 15:00 GMT, 15 min8 Jan 2025 15:15 GMT, 15 min8 Jan 2025 17:30 GMT, 15 min8 Jan 2025 18:45 GMT, 15 min8 Jan 2025 19:00 GMT, 15 min8 Jan 2025 19:30 GMT, 30 min8 Jan 2025 20:00 GMT, 15 min8 Jan 2025 20:45 GMT, 15 min8 Jan 2025 21:00 GMT, 15 min13 Jan 2025 16:00 GMT, 59.8 h16 Jan 2025 03:45 GMT, 15 min16 Jan 2025 04:00 GMT, 30 min16 Jan 2025 04:45 GMT, 15 min16 Jan 2025 05:00 GMT, 30 min16 Jan 2025 05:30 GMT, 30 min16 Jan 2025 06:00 GMT, 15 min16 Jan 2025 06:15 GMT, 15 min16 Jan 2025 06:30 GMT, 15 min16 Jan 2025 06:45 GMT, 15 min16 Jan 2025 07:00 GMT, 15 min16 Jan 2025 07:15 GMT, 30 min16 Jan 2025 07:45 GMT, 30 min16 Jan 2025 08:15 GMT, 45 min16 Jan 2025 09:00 GMT, 90 min16 Jan 2025 10:30 GMT, 2.8 h16 Jan 2025 13:15 GMT, 15 min16 Jan 2025 14:15 GMT, 15 min16 Jan 2025 15:30 GMT, 30 min16 Jan 2025 16:15 GMT, 15 min16 Jan 2025 16:30 GMT, 15 min16 Jan 2025 17:30 GMT, 15 min16 Jan 2025 17:45 GMT, 15 min16 Jan 2025 18:45 GMT, 15 min16 Jan 2025 19:00 GMT, 15 min16 Jan 2025 19:15 GMT, 15 min16 Jan 2025 19:30 GMT, 15 min16 Jan 2025 19:45 GMT, 45 min16 Jan 2025 20:30 GMT, 15 min16 Jan 2025 21:00 GMT, 15 min17 Jan 2025 01:15 GMT, 15 min24 Jan 2025 05:30 GMT, 2.8 h24 Jan 2025 08:15 GMT, 60 min24 Jan 2025 09:30 GMT, 15 min27 Jan 2025 03:00 GMT, 46 h29 Jan 2025 01:15 GMT, 90 min29 Jan 2025 02:45 GMT, 15 min29 Jan 2025 03:00 GMT, 3.5 h29 Jan 2025 06:30 GMT, 15 min29 Jan 2025 06:45 GMT, 6.3 h29 Jan 2025 13:00 GMT, 60 min29 Jan 2025 15:45 GMT, 15 min29 Jan 2025 16:45 GMT, 15 min29 Jan 2025 17:00 GMT, 15 min29 Jan 2025 17:30 GMT, 60 min29 Jan 2025 18:30 GMT, 15 min29 Jan 2025 18:45 GMT, 2 h29 Jan 2025 20:45 GMT, 15 min29 Jan 2025 21:00 GMT, 45 min29 Jan 2025 22:30 GMT, 15 min30 Jan 2025 08:30 GMT, 15 min30 Jan 2025 09:45 GMT, 15 min30 Jan 2025 10:45 GMT, 15 min31 Jan 2025 04:45 GMT, 30 min23 Mar 2025 11:00 GMT, 15 min29 May 2025 09:45 GMT, 60 min29 May 2025 11:45 GMT, 75 min15 Jul 2025 18:45 GMT, 75 min15 Jul 2025 21:00 GMT, 75 min19 Jul 2025 16:15 GMT, 60 min20 Jul 2025 16:15 GMT, 3.5 h11 Sep 2025 15:15 GMT, 15 min11 Sep 2025 15:30 GMT, 30 min12 Sep 2025 14:00 GMT, 30 min12 Sep 2025 14:30 GMT, 45 min15 Sep 2025 15:30 GMT, 9.3 h16 Sep 2025 03:15 GMT, 60 min20 Sep 2025 08:30 GMT, 49.3 h28 Sep 2025 02:15 GMT, 2 h3 Oct 2025 00:15 GMT, 2 h3 Oct 2025 14:15 GMT, 48 h5 Oct 2025 14:45 GMT, 30 min19 Oct 2025 18:00 GMT, 15 h20 Oct 2025 09:15 GMT, 30 min5 Nov 2025 07:45 GMT, 6.3 h5 Nov 2025 14:15 GMT, 45 min7 Nov 2025 18:30 GMT, 2 h11 Nov 2025 11:15 GMT, 3.8 h11 Nov 2025 21:00 GMT, 195.5 h20 Nov 2025 00:30 GMT, 30 min20 Nov 2025 01:00 GMT, 15 min20 Nov 2025 09:00 GMT, 2.3 h20 Nov 2025 11:45 GMT, 15 min22 Nov 2025 06:00 GMT, 45 min22 Nov 2025 07:30 GMT, 15 min22 Nov 2025 08:45 GMT, 15 min22 Nov 2025 09:45 GMT, 30 min22 Nov 2025 10:30 GMT, 30 min22 Nov 2025 11:00 GMT, 15 min23 Nov 2025 12:15 GMT, 105 min23 Nov 2025 14:15 GMT, 2 h23 Nov 2025 16:30 GMT, 45 min23 Nov 2025 21:15 GMT, 2.8 h24 Nov 2025 00:30 GMT, 15 min24 Nov 2025 00:45 GMT, 15 min24 Nov 2025 08:15 GMT, 5.8 h24 Nov 2025 14:00 GMT, 30 min24 Nov 2025 14:30 GMT, 15 min24 Nov 2025 15:00 GMT, 105 min24 Nov 2025 17:00 GMT, 15 min24 Nov 2025 17:15 GMT, 45 min24 Nov 2025 18:00 GMT, 15 min24 Nov 2025 18:30 GMT, 45 min24 Nov 2025 19:15 GMT, 60 min24 Nov 2025 20:15 GMT, 15 min24 Nov 2025 20:45 GMT, 15 min24 Nov 2025 21:00 GMT, 15 min24 Nov 2025 21:30 GMT, 15 min24 Nov 2025 21:45 GMT, 30 min28 Nov 2025 13:45 GMT, 11.3 h29 Nov 2025 01:30 GMT, 15 min29 Nov 2025 12:15 GMT, 32 h30 Nov 2025 20:15 GMT, 104 h5 Dec 2025 04:15 GMT, 15 min5 Dec 2025 04:30 GMT, 75 min5 Dec 2025 05:45 GMT, 15 min5 Dec 2025 06:00 GMT, 15 min5 Dec 2025 06:15 GMT, 45 min5 Dec 2025 07:00 GMT, 15 min5 Dec 2025 07:15 GMT, 8.3 h5 Dec 2025 16:00 GMT, 45 min5 Dec 2025 17:00 GMT, 224.5 h15 Dec 2025 02:00 GMT, 43 h16 Dec 2025 21:30 GMT, 15 min17 Dec 2025 18:45 GMT, 131.5 h23 Dec 2025 06:30 GMT, 18.5 h24 Dec 2025 01:45 GMT, 15 min24 Dec 2025 10:00 GMT, 2.5 h24 Dec 2025 12:45 GMT, 30 minPateley Bridge STW1 Jan 2025 03:00 GMT, 8.8 h20 Sep 2025 18:00 GMT, 10.5 h3 Oct 2025 15:00 GMT, 3.3 h3 Oct 2025 19:30 GMT, 45 min14 Nov 2025 12:45 GMT, 3 h14 Nov 2025 19:30 GMT, 33 h29 Nov 2025 19:45 GMT, 90 min1 Dec 2025 06:15 GMT, 3.8 h6 Dec 2025 18:30 GMT, 3.3 h6 Dec 2025 22:30 GMT, 15 min7 Dec 2025 15:00 GMT, 6.5 h9 Dec 2025 05:30 GMT, 37.3 h10 Dec 2025 19:15 GMT, 15 min18 Dec 2025 17:00 GMT, 45 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

020k40k60kJan 2025: 268 h spilling ≈ 10,812 m³ (range 4,307–27,144 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.2 h spilling ≈ 8.1 m³ (range 3.2–20 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 2.2 h spilling ≈ 89 m³ (range 35–223 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 7.0 h spilling ≈ 283 m³ (range 113–710 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 74 h spilling ≈ 2,990 m³ (range 1,191–7,506 m³)SepOct 2025: 70 h spilling ≈ 2,828 m³ (range 1,127–7,100 m³)OctNov 2025: 319 h spilling ≈ 12,901 m³ (range 5,139–32,388 m³)NovDec 2025: 585 h spilling ≈ 23,644 m³ (range 9,418–59,359 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Dec 2025, 17:00Pateley Bridge STW9.4 days3,613 – 22,772 m³
11 Nov 2025, 21:00Pateley Bridge STW8.1 days3,146 – 19,830 m³
17 Dec 2025, 18:45Pateley Bridge STW5.5 days2,116 – 13,338 m³
30 Nov 2025, 20:15Pateley Bridge STW4.3 days1,674 – 10,549 m³
13 Jan 2025, 16:00Pateley Bridge STW2.5 days962 – 6,061 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate53,554 m³range 21,332 – 134,450 m³
In litres53.6 millionrange 21.3 million – 134.4 million L
Olympic swimming pools21at 2,500 m³ each
Organic load, as people's raw sewage80,331person-days of untreated BOD

Assumed spill rate while spilling: 4.5 – 28.2 L/s (central 11.2 L/s), from a dry-weather flow of 4.5 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 853 kg4,820 kg26,890 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 2,240 kg22,761 kg96,938 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 41 kg337 kg1,250 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 26 kg139 kg726 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 2.1 trillion organisms53.6 trillion organisms1.3 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Pateley Bridge STW

Storm tank at sewage works · discharges to River Nidd

Spills 2025
79 (1,213 hours) · down 40% on 2024
Spills 2024
132 (2,332 hours)
Long-term average
110.3 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Performance - SW Infiltration
Investigation
UWWTR investigation ongoing, Operational investigation completed, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Nidd from Ashfoldside Beck to Birstwith (GB104027068295)
Outlet location
SE1771064060 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00225 · 27/21/0088 · company name: PATELEY BRIDGE/STW

Pateley Bridge STW

Inlet overflow at sewage works · discharges to River Nidd

Spills 2025
15 (113 hours) · up 114% on 2024
Spills 2024
7 (17 hours)
Long-term average
37.8 spills a year (monitored since 2020)
Monitor uptime
100% of the year
Investigation
UWWTR investigation ongoing, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Nidd from Ashfoldside Beck to Birstwith (GB104027068295)
Outlet location
SE1768064070 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00226 · 27/21/0088 · company name: PATELEY BRIDGE/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.