Wath Upon Dearne sewage works: storm overflow spills 2025

Wath Upon Dearne sewage treatment works, run by Yorkshire Water, has 1 monitored storm overflow discharging to Brook Dike/River Dearne. In 2025 it recorded 27 spills totalling 361 hours, against 86 spills and 1,194 hours in 2024. By hours spilling, it ranks 123 of 283 Yorkshire Water works, where 1 spilled longest.

Works size: 19,499 population equivalent (WATH ON DEARNE, BRAMPTON STW", UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWath Upon Dearne WwTW1 Jan 2025 00:00 GMT, 25.5 h2 Jan 2025 03:30 GMT, 60 min2 Jan 2025 06:30 GMT, 60 min4 Jan 2025 17:45 GMT, 60 min4 Jan 2025 21:45 GMT, 60 min4 Jan 2025 23:30 GMT, 60 min5 Jan 2025 01:15 GMT, 105 min5 Jan 2025 03:30 GMT, 60 min5 Jan 2025 05:15 GMT, 105 min5 Jan 2025 07:30 GMT, 75 min5 Jan 2025 09:15 GMT, 139.8 h11 Jan 2025 05:30 GMT, 23.8 h12 Jan 2025 06:45 GMT, 17.8 h13 Jan 2025 01:00 GMT, 60 min13 Jan 2025 02:15 GMT, 2.5 h13 Jan 2025 05:30 GMT, 30 min13 Jan 2025 06:45 GMT, 19 h14 Jan 2025 02:15 GMT, 3.8 h14 Jan 2025 06:45 GMT, 17.8 h15 Jan 2025 01:45 GMT, 3.3 h15 Jan 2025 05:45 GMT, 15 min15 Jan 2025 06:45 GMT, 5.8 h15 Jan 2025 13:15 GMT, 105 min15 Jan 2025 16:00 GMT, 2 h15 Jan 2025 19:00 GMT, 90 min15 Jan 2025 22:00 GMT, 45 min27 Jan 2025 05:30 GMT, 7 h27 Jan 2025 13:30 GMT, 105 min27 Jan 2025 16:45 GMT, 75 min27 Jan 2025 19:45 GMT, 75 min27 Jan 2025 22:45 GMT, 4.8 h28 Jan 2025 04:30 GMT, 75 min28 Jan 2025 11:00 GMT, 8 h28 Jan 2025 19:30 GMT, 2.3 h28 Jan 2025 22:30 GMT, 105 min20 Sep 2025 19:00 GMT, 11.3 h21 Sep 2025 09:00 GMT, 15 min14 Nov 2025 22:45 GMT, 21.8 h9 Dec 2025 13:00 GMT, 6.8 h12 Dec 2025 11:15 GMT, 3.8 h15 Dec 2025 07:45 GMT, 8.3 h15 Dec 2025 18:30 GMT, 90 min17 Dec 2025 01:15 GMT, 30 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300kJan 2025: 307 h spilling ≈ 102,403 m³ (range 40,789–257,087 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 12 h spilling ≈ 3,842 m³ (range 1,530–9,646 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 22 h spilling ≈ 7,283 m³ (range 2,901–18,285 m³)NovDec 2025: 21 h spilling ≈ 6,949 m³ (range 2,768–17,447 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 09:15Wath Upon Dearne WwTW5.8 days18,598 – 117,220 m³
1 Jan 2025, 00:00Wath Upon Dearne WwTW1.1 days3,394 – 21,389 m³
11 Jan 2025, 05:30Wath Upon Dearne WwTW23.8 h3,161 – 19,921 m³
14 Nov 2025, 22:45Wath Upon Dearne WwTW21.8 h2,895 – 18,244 m³
13 Jan 2025, 06:45Wath Upon Dearne WwTW19.0 h2,529 – 15,937 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate120,445 m³range 47,976 – 302,381 m³
In litres120.4 millionrange 48.0 million – 302.4 million L
Olympic swimming pools48at 2,500 m³ each
Organic load, as people's raw sewage180,667person-days of untreated BOD

Assumed spill rate while spilling: 37.0 – 233.0 L/s (central 92.8 L/s), from a dry-weather flow of 37.0 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 1,919 kg10,840 kg60,476 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 5,037 kg51,189 kg218,017 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 91 kg759 kg2,812 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 58 kg313 kg1,633 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 4.8 trillion organisms120.4 trillion organisms3.0 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Wath Upon Dearne WwTW

Storm tank at sewage works · discharges to Brook Dike/River Dearne

Spills 2025
27 (361 hours) · down 69% on 2024
Spills 2024
86 (1,194 hours)
Long-term average
53.3 spills a year (monitored since 2020)
Monitor uptime
100% of the year
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
River Dearne Darfield STW to River Don (GB104027063173)
Outlet location
SE4449001120 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00091 · 2172 · company name: WATH ON DEARNE/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.