Storm overflow register · Yorkshire Water

Wentworth sewage works: storm overflow spills 2025

Wentworth sewage treatment works, run by Yorkshire Water, has 1 monitored storm overflow discharging to Unnamed Trib. of Harley Dyke. In 2025 it recorded 99 spills totalling 1,638 hours, against 191 spills and 3,553 hours in 2024. By hours spilling, it ranks 13 of 283 Yorkshire Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecWentworth STW1 Jan 2025 00:00 GMT, 293.5 h13 Jan 2025 05:45 GMT, 2.3 h13 Jan 2025 08:15 GMT, 95.8 h17 Jan 2025 08:45 GMT, 13.3 h17 Jan 2025 22:15 GMT, 12.3 h18 Jan 2025 10:45 GMT, 14 h19 Jan 2025 01:00 GMT, 35 h22 Jan 2025 14:45 GMT, 60 min24 Jan 2025 04:00 GMT, 29.5 h26 Jan 2025 16:00 GMT, 103.8 h10 Feb 2025 16:00 GMT, 56.3 h13 Feb 2025 10:15 GMT, 60 min23 Feb 2025 21:30 GMT, 7.3 h24 Feb 2025 08:15 GMT, 9.8 h24 Feb 2025 19:45 GMT, 105 min26 Feb 2025 10:15 GMT, 8.5 h26 Feb 2025 19:00 GMT, 2 h26 Feb 2025 21:15 GMT, 3.8 h27 Feb 2025 01:15 GMT, 45 min27 Feb 2025 02:45 GMT, 30 min27 Feb 2025 08:15 GMT, 3.3 h22 Mar 2025 16:00 GMT, 27.8 h23 Mar 2025 20:15 GMT, 15 min23 Mar 2025 21:00 GMT, 25 h24 Mar 2025 22:15 GMT, 15 min3 Jun 2025 07:45 GMT, 30 min5 Jun 2025 18:30 GMT, 60 min8 Jun 2025 03:00 GMT, 30 min15 Jun 2025 23:45 GMT, 105 min6 Jul 2025 18:45 GMT, 3.3 h6 Jul 2025 23:30 GMT, 45 min7 Jul 2025 00:45 GMT, 45 min19 Jul 2025 13:30 GMT, 30 min20 Jul 2025 12:45 GMT, 105 min20 Jul 2025 20:45 GMT, 60 min27 Aug 2025 14:00 GMT, 30 min27 Aug 2025 16:45 GMT, 45 min17 Sep 2025 06:15 GMT, 2.5 h20 Sep 2025 15:00 GMT, 13.3 h28 Sep 2025 01:30 GMT, 2 h3 Oct 2025 00:30 GMT, 75 min3 Oct 2025 14:15 GMT, 7 h19 Oct 2025 22:00 GMT, 2 h23 Oct 2025 01:00 GMT, 6.5 h31 Oct 2025 18:45 GMT, 15 min4 Nov 2025 19:45 GMT, 105 min10 Nov 2025 15:00 GMT, 3.8 h14 Nov 2025 01:45 GMT, 79 h17 Nov 2025 13:45 GMT, 8.3 h18 Nov 2025 15:45 GMT, 9.3 h19 Nov 2025 02:30 GMT, 21.5 h20 Nov 2025 12:45 GMT, 75 min23 Nov 2025 06:30 GMT, 28.8 h24 Nov 2025 12:30 GMT, 10.5 h28 Nov 2025 13:30 GMT, 2.8 h29 Nov 2025 04:00 GMT, 119 h4 Dec 2025 03:15 GMT, 8.8 h4 Dec 2025 12:15 GMT, 24.5 h5 Dec 2025 13:15 GMT, 6 h5 Dec 2025 19:30 GMT, 442.8 h24 Dec 2025 06:30 GMT, 7.8 h24 Dec 2025 14:45 GMT, 30 min24 Dec 2025 16:00 GMT, 15 min24 Dec 2025 17:30 GMT, 66 h

Hours spilling by month, 2025

0200400600800Jan 2025: 600 hours spillingJanFeb 2025: 95 hours spillingFebMar 2025: 53 hours spillingMarApr 2025: 0.0 hours spillingAprMay 2025: 0.0 hours spillingMayJun 2025: 3.8 hours spillingJunJul 2025: 8.0 hours spillingJulAug 2025: 1.2 hours spillingAugSep 2025: 18 hours spillingSepOct 2025: 17 hours spillingOctNov 2025: 211 hours spillingNovDec 2025: 632 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
5 Dec 2025, 19:30Wentworth STW18.4 days
1 Jan 2025, 00:00Wentworth STW12.2 days
29 Nov 2025, 04:00Wentworth STW5.0 days
26 Jan 2025, 16:00Wentworth STW4.3 days
13 Jan 2025, 08:15Wentworth STW4.0 days

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate28,070 m³range 11,181 – 70,470 m³
In litres28.1 millionrange 11.2 million – 70.5 million L
Olympic swimming pools11at 2,500 m³ each
Organic load, as people's raw sewage42,104person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 447 kg2,526 kg14,094 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 1,174 kg11,930 kg50,809 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 21 kg177 kg655 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 13 kg73 kg381 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 1.1 trillion organisms28.1 trillion organisms704.7 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Wentworth STW

Storm tank at sewage works · discharges to Unnamed Trib. of Harley Dyke

Spills 2025
99 (1,638 hours) · down 48% on 2024
Spills 2024
191 (3,553 hours)
Long-term average
163.0 spills a year (monitored since 2020)
Monitor uptime
100% of the year
High-spill reason (company)
Not asset maintenance - hydraulic capacity
Investigation
UWWTR investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Knoll Beck from Source to River Dearne (GB104027057470)
Outlet location
SK3797098910 (OS grid reference) · View on Apple Maps
EA ID / permit
YWS00916 · E702(SS) · company name: WENTWORTH/STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Yorkshire Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.