Storm overflow register · Anglian Water

Copford Water Recycling Ccentre sewage works: storm overflow spills 2025

Copford Water Recycling Ccentre sewage treatment works, run by Anglian Water, has 1 monitored storm overflow discharging to The Roman River. In 2025 it recorded 10 spills totalling 46 hours, against 18 spills and 73 hours in 2024. By hours spilling, it ranks 236 of 419 Anglian Water works, where 1 spilled longest.

Works size: 4,424 population equivalent (COPFORD STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecCopford Water…5 Jan 2025 05:32 GMT, 18.5 h6 Jan 2025 00:00 GMT, 3.6 h6 Jan 2025 03:38 GMT, 58 min6 Jan 2025 04:36 GMT, 74 min6 Jan 2025 05:50 GMT, 72 min6 Jan 2025 07:04 GMT, 48 min6 Jan 2025 09:04 GMT, 6 min6 Jan 2025 09:10 GMT, 4 min6 Jan 2025 09:28 GMT, 2 min6 Jan 2025 09:30 GMT, 20 min6 Jan 2025 10:00 GMT, 10 min6 Jan 2025 10:10 GMT, 2 min6 Jan 2025 10:26 GMT, 6 min6 Jan 2025 10:42 GMT, 2 min6 Jan 2025 11:10 GMT, 2 min6 Jan 2025 11:12 GMT, 8 min26 Jan 2025 15:46 GMT, 32 min26 Jan 2025 16:18 GMT, 10 min26 Jan 2025 16:28 GMT, 108 min1 Mar 2025 13:52 GMT, 2.5 h14 Nov 2025 15:32 GMT, 6.7 h19 Nov 2025 11:00 GMT, 2 min19 Nov 2025 11:02 GMT, 2 min23 Nov 2025 10:40 GMT, 2.8 h23 Nov 2025 13:28 GMT, 2 min4 Dec 2025 16:34 GMT, 2 min9 Dec 2025 14:26 GMT, 2 min18 Dec 2025 16:20 GMT, 8 min18 Dec 2025 16:28 GMT, 2 min18 Dec 2025 16:30 GMT, 2 min18 Dec 2025 16:36 GMT, 24 min18 Dec 2025 17:00 GMT, 2 min18 Dec 2025 17:02 GMT, 88 min18 Dec 2025 18:30 GMT, 2 min18 Dec 2025 18:32 GMT, 2 min18 Dec 2025 18:34 GMT, 2 min18 Dec 2025 18:36 GMT, 2 min18 Dec 2025 18:38 GMT, 24 min18 Dec 2025 19:02 GMT, 2 min18 Dec 2025 19:04 GMT, 2 min18 Dec 2025 19:06 GMT, 2 min18 Dec 2025 19:08 GMT, 2 min18 Dec 2025 19:10 GMT, 2 min18 Dec 2025 19:12 GMT, 6 min18 Dec 2025 19:18 GMT, 30 min18 Dec 2025 19:48 GMT, 2 min18 Dec 2025 19:50 GMT, 18 min18 Dec 2025 20:08 GMT, 2 min18 Dec 2025 20:12 GMT, 2 min18 Dec 2025 20:14 GMT, 2 min18 Dec 2025 20:30 GMT, 4 min18 Dec 2025 20:34 GMT, 2 min18 Dec 2025 20:36 GMT, 4 min18 Dec 2025 20:40 GMT, 2 min

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

02,0004,0006,000Jan 2025: 30 h spilling ≈ 2,259 m³ (range 900–5,671 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 2.5 h spilling ≈ 190 m³ (range 75–476 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)SepOct 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)OctNov 2025: 9.6 h spilling ≈ 728 m³ (range 290–1,827 m³)NovDec 2025: 4.1 h spilling ≈ 311 m³ (range 124–780 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 05:32Copford Water Recycling Ccentre18.5 h558 – 3,514 m³
14 Nov 2025, 15:32Copford Water Recycling Ccentre6.7 h201 – 1,269 m³
6 Jan 2025, 00:00Copford Water Recycling Ccentre3.6 h110 – 691 m³
23 Nov 2025, 10:40Copford Water Recycling Ccentre2.8 h85 – 533 m³
1 Mar 2025, 13:52Copford Water Recycling Ccentre2.5 h76 – 482 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate3,487 m³range 1,389 – 8,754 m³
In litres3.5 millionrange 1.4 million – 8.8 million L
Olympic swimming pools1.4at 2,500 m³ each
Organic load, as people's raw sewage5,230person-days of untreated BOD

Assumed spill rate while spilling: 8.4 – 52.9 L/s (central 21.1 L/s), from a dry-weather flow of 8.4 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 56 kg314 kg1,751 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 146 kg1,482 kg6,312 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 2.6 kg22 kg81 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1.7 kg9.1 kg47 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 138.9 billion organisms3.5 trillion organisms87.5 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Copford Water Recycling Ccentre

Storm tank at sewage works · discharges to The Roman River

Spills 2025
10 (46 hours) · down 44% on 2024
Spills 2024
18 (73 hours)
Long-term average
15.7 spills a year (monitored since 2023)
Monitor uptime
100% of the year
Investigation
Env Act (SODRP) investigation ongoing, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Roman River (GB105037034150)
Outlet location
TL9330023500 (OS grid reference) · View on Apple Maps
EA ID / permit
AWS00276 · ASENF1050 · company name: COPFORD STW

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Anglian Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.