Storm overflow register · 2025 annual return

Anglian Water storm overflows, 2025

Anglian Water reported 1,442 storm overflows in England for 2025. Together they recorded 17,322 spills over 105,806 hours, an average of 12.0 spills per overflow against 20.4 across England. That ranks 1 of 10 companies, where 1 is the fewest spills per overflow. Counting the same overflows in both years, spills were down 61% on 2024.

244 overflows did not spill · 38 spilled more than 60 times · 1,323 had monitors working for 90% of the year or more · 419 sewage treatment works with overflows

Hours spilling by month, 2025

010k20k30k40kJan 2025: 32,000 hours spillingJanFeb 2025: 10,152 hours spillingFebMar 2025: 1,794 hours spillingMarApr 2025: 1,375 hours spillingAprMay 2025: 789 hours spillingMayJun 2025: 1,209 hours spillingJunJul 2025: 3,556 hours spillingJulAug 2025: 359 hours spillingAugSep 2025: 1,848 hours spillingSepOct 2025: 2,287 hours spillingOctNov 2025: 24,856 hours spillingNovDec 2025: 25,568 hours spillingDec
Hours spilling, all Anglian Water overflows, from the start/stop records. Spills running across a month end are split between the months.

All Anglian Water storm overflows

Sorted by hours spilling. Open an overflow for its permit, location, reasons for high spills and improvement status.

OverflowDischarges toSpills 2025Hours 2025Spills vs 2024Monitor uptime
Great Easton(Leics) STW
Storm tank at sewage works
Sewage works
Great Easton
Company site name
GREAT EASTON STW (LEICS)
EA ID / permit
AWS00497 · AW5NF768
Outlet location
SP8534092510 (OS grid reference) · View on Apple Maps
WFD catchment
Welland - conf Langton Bk to conf Gwash (GB105031050580)
2024 spills / hours
183 / 3,776
Long-term average
123.4 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 1,895 hours spilling →
River Welland Nt 111 1,895 down 39% 100%
Foxton (Cambs) WRC
Inlet overflow at sewage works
Sewage works
Foxton
Company site name
Foxton WRC (Cambs)
EA ID / permit
AWS01557 · AW1NF/964
Outlet location
TL4014049560 (OS grid reference) · View on Apple Maps
WFD catchment
Rhee (DS Wendy) (GB105033037610)
2024 spills / hours
188 / 4,487
Long-term average
145.0 spills a year (monitored since 2024)
High-spill reason (company)
Performance - SW Infiltration
Monitor below 90%
Telemetry or data archiving failure / issue · Resolved - January after reporting year
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed, Bathing Water and/or Shellfish Water investigation ongoing
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,645 hours spilling →
River Rhee 102 1,645 down 46% 87%
Nettleham STW
Storm tank at sewage works
Sewage works
Nettleham
EA ID / permit
AWS00873 · ANNNF13387
Outlet location
TF0192075880 (OS grid reference) · View on Apple Maps
WFD catchment
Nettleham Beck (GB105030062210)
2024 spills / hours
114 / 2,090
Long-term average
105.5 spills a year (monitored since 2022)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 1,585 hours spilling →
Nettleham Beck 109 1,585 down 4% 100%
Great Oxendon STW
Storm tank at sewage works
Sewage works
Great Oxendon
EA ID / permit
AWS00505 · AWNNF13652
Outlet location
SP7360082300 (OS grid reference) · View on Apple Maps
WFD catchment
Ise - Upper (GB105032045200)
2024 spills / hours
154 / 3,206
Long-term average
109.0 spills a year (monitored since 2022)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 1,548 hours spilling →
River Ise 88 1,548 down 43% 95%
Ramsey Water Recycling Centre
Storm tank at sewage works
Sewage works
Ramsey
Company site name
RAMSEY STW
EA ID / permit
AWS01027 · AWCNF1171
Outlet location
TL2852086300 (OS grid reference) · View on Apple Maps
WFD catchment
Middle Level (GB205033000050)
2024 spills / hours
236 / 3,430
Long-term average
175.0 spills a year (monitored since 2023)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 1,432 hours spilling →
The Ramsey High Lode 145 1,432 down 39% 99%
Pertenhall STW
Storm tank at sewage works
Sewage works
Pertenhall
EA ID / permit
AWS00980 · AW1NF2724
Outlet location
TL0879864594 (OS grid reference) · View on Apple Maps
WFD catchment
Pertenhall Brook (GB105033042960)
2024 spills / hours
165 / 3,275
Long-term average
96.6 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,273 hours spilling →
Keysoe Brook. River Kym Nt 80 1,273 down 52% 99%
Whaddon Water Recycling Centre
Storm tank at sewage works
Sewage works
Whaddon
Company site name
WHADDON STW
EA ID / permit
AWS01486 · AWCNF11058
Outlet location
SP8114034430 (OS grid reference) · View on Apple Maps
WFD catchment
Weald Brook (GB105033037870)
2024 spills / hours
171 / 3,244
Long-term average
118.0 spills a year (monitored since 2020)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,250 hours spilling →
Calverton Brook 73 1,250 down 57% 100%
Welton N'Hant Water Recycling Cntr
Storm tank at sewage works
Sewage works
Welton N Hant Water Recycling Cntr
Company site name
WELTON STW (NORTHANTS)
EA ID / permit
AWS01466 · AW5NF204
Outlet location
SP5886065640 (OS grid reference) · View on Apple Maps
WFD catchment
Welton Village Trib, Whilton branch of R. Nene (GB105032045360)
2024 spills / hours
247 / 5,500
Long-term average
135.5 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 1,239 hours spilling →
Whilton Branch R Nene (Nt) 99 1,239 down 60% 99%
Hollowell Water Recycling Centre
Storm tank at sewage works
Sewage works
Hollowell
Company site name
HOLLOWELL STW
EA ID / permit
AWS00611 · AW5NF254
Outlet location
SP6947071890 (OS grid reference) · View on Apple Maps
WFD catchment
Hollowell Arm of Spratton Brook (GB105032045510)
2024 spills / hours
191 / 3,585
Long-term average
103.0 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,190 hours spilling →
Brampton Branch R.Nene Nt 61 1,190 down 68% 100%
Hallaton STW
Storm tank at sewage works (with treatment)
Sewage works
Hallaton
EA ID / permit
AWS00552 · AWNNF1287
Outlet location
SP7950096000 (OS grid reference) · View on Apple Maps
WFD catchment
Medbourne Brook (GB105031050520)
Treatment
Reed bed
2024 spills / hours
220 / 2,994
Long-term average
162.5 spills a year (monitored since 2022)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 1,126 hours spilling →
Medbourne Brook River Welland 155 1,126 down 30% 100%
Newnham(Northants) WRC
Storm tank at sewage works
Sewage works
Newnham
Company site name
NEWNHAM STW (NORTHANTS)
EA ID / permit
AWS00878 · AW5NF400
Outlet location
SP5827059150 (OS grid reference) · View on Apple Maps
WFD catchment
Nene - headwaters to conf Whilton Branch (GB105032045310)
2024 spills / hours
137 / 2,455
Long-term average
82.0 spills a year (monitored since 2020)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
UWWTR improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 1,099 hours spilling →
Kislingbury Branch R.Nene Nt 76 1,099 down 45% 100%
Hanslope STW
Storm tank at sewage works
Sewage works
Hanslope
EA ID / permit
AWS00554 · AW1NF1066
Outlet location
SP7945047290 (OS grid reference) · View on Apple Maps
WFD catchment
Tove (DS Greens Norton) (GB105033038180)
2024 spills / hours
152 / 2,515
Long-term average
103.0 spills a year (monitored since 2023)
High-spill reason (company)
Performance - Partial / no capacity due to blockage or restriction (e.g. roots / grid) - maintenance issue
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 984 hours spilling →
River Tove 69 984 down 55% 99%
Leadenham STW
Storm tank at sewage works
Sewage works
Leadenham
EA ID / permit
AWS00718 · ANNNF13061
Outlet location
SK9540053220 (OS grid reference) · View on Apple Maps
WFD catchment
Brant - Lower (GB105030056770)
2024 spills / hours
118 / 2,117
Long-term average
64.8 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Other maintenance / capital works (e.g. jetting)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 935 hours spilling →
unnamed tributary R Brant 49 935 down 58% 100%
Marston Moretaine WRC
Storm tank at sewage works
Sewage works
Marston Moretaine
Company site name
MARSTON MORETAINE STW
EA ID / permit
AWS00823 · AW1NF3013
Outlet location
TL0024041960 (OS grid reference) · View on Apple Maps
WFD catchment
Elstow Brook (US Shortstown) (GB105033038050)
2024 spills / hours
147 / 2,253
Long-term average
108.7 spills a year (monitored since 2023)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 914 hours spilling →
Marston Brook 76 914 down 48% 100%
Deeping Water Recycling Centre
Storm tank at sewage works
Sewage works
Deeping
Company site name
Deeping Water Recycling Centre
EA ID / permit
AWS00324 · ANNNF13012
Outlet location
TF1711008150 (OS grid reference) · View on Apple Maps
WFD catchment
Welland - conf Greatford Cut to tidal (GB205031050685)
2024 spills / hours
131 / 1,473
Long-term average
67.6 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 789 hours spilling →
River Welland 53 789 down 60% 99%
Knossington STW
Inlet overflow at sewage works
Sewage works
Knossington
EA ID / permit
AWS00706 · AWNNF13148
Outlet location
SK8070007820 (OS grid reference) · View on Apple Maps
WFD catchment
South Gwash (GB105031050480)
2024 spills / hours
5 / 44
Long-term average
41.0 spills a year (monitored since 2021)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 780 hours spilling →
unnamed stream River Gwash 93 780 up 1760% 100%
Thealby STW
Inlet overflow at sewage works
Sewage works
Thealby
EA ID / permit
AWS01362 · AW3NF383
Outlet location
SE8950018200 (OS grid reference) · View on Apple Maps
WFD catchment
Winterton Beck from Source to the Humber (GB104029067660)
2024 spills / hours
90 / 766
Long-term average
85.0 spills a year (monitored since 2024)
High-spill reason (company)
Performance - Other maintenance / capital works (e.g. jetting)
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 770 hours spilling →
Unknown trib. 80 770 down 11% 99%
Harlestone PS
Storm discharge at pumping station
Company site name
HARLESTONE SP
EA ID / permit
AWS00562 · AWENF2360
Outlet location
SP7130066200 (OS grid reference) · View on Apple Maps
WFD catchment
Church Brampton Arm (GB105032045380)
2024 spills / hours
157 / 3,379
Long-term average
103.5 spills a year (monitored since 2024)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 762 hours spilling →
R Nene (Whilton Branch) 50 762 down 68% 100%
Thorpe Malsor STW
Inlet overflow at sewage works
Sewage works
Thorpe Malsor
EA ID / permit
AWS01373 · AWNNF13638
Outlet location
SP8366078750 (OS grid reference) · View on Apple Maps
WFD catchment
Loddington Arm (Ise) (GB105032045150)
2024 spills / hours
192 / 2,015
Long-term average
146.3 spills a year (monitored since 2023)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 757 hours spilling →
Shutlanger Brook 118 757 down 39% 98%
Buckden Water Recycling Centre
Storm tank at sewage works
Sewage works
Buckden
Company site name
BUCKDEN STW
EA ID / permit
AWS00164 · AWCNF11413
Outlet location
TL1997067050 (OS grid reference) · View on Apple Maps
WFD catchment
Diddington Brook (GB105033043310)
2024 spills / hours
162 / 3,033
Long-term average
116.0 spills a year (monitored since 2023)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 731 hours spilling →
Tributary of Diddington Brook 66 731 down 59% 100%
Bozeat STW
Storm tank at sewage works
Sewage works
Bozeat
EA ID / permit
AWS00110 · AW5NF421
Outlet location
SP9020759231 (OS grid reference) · View on Apple Maps
WFD catchment
Grendon Brook (GB105032045040)
2024 spills / hours
98 / 1,494
Long-term average
60.2 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 720 hours spilling →
Grendon Brook River Nene 60 720 down 39% 94%
Ryhall Water Recycling Centre
Storm tank at sewage works
Sewage works
Ryhall
Company site name
RYHALL STW
EA ID / permit
AWS01084 · AW5NF5213
Outlet location
TF0404010700 (OS grid reference) · View on Apple Maps
WFD catchment
Gwash (GB105031050610)
2024 spills / hours
81 / 1,002
Long-term average
42.0 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 706 hours spilling →
River Gwash 62 706 down 23% 100%
South Rauceby Water Recycling Centr
Inlet overflow at sewage works
Sewage works
South Rauceby Water Recycling Centr
Company site name
South Rauceby Water Recycling Centre
EA ID / permit
AWS01160 · AW3NF148
Outlet location
TF0316044850 (OS grid reference) · View on Apple Maps
WFD catchment
Slea (GB105030056670)
2024 spills / hours
91 / 388
Long-term average
81.0 spills a year (monitored since 2024)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 672 hours spilling →
The Beck to a Trib of River Sl 71 672 down 22% 98%
Metheringham STW
Storm tank at sewage works
Sewage works
Metheringham
EA ID / permit
AWS00839 · AW3NFF821
Outlet location
TF0799061390 (OS grid reference) · View on Apple Maps
WFD catchment
Metheringham Beck (GB105030056210)
2024 spills / hours
93 / 1,237
Long-term average
76.2 spills a year (monitored since 2021)
High-spill reason (company)
Performance - Other maintenance / capital works (e.g. jetting)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 668 hours spilling →
Car Dyke Meth'gham Delph Rive 55 668 down 41% 100%
Silverstone STW
Storm tank at sewage works
Sewage works
Silverstone
EA ID / permit
AWS01136 · AWCNF1191
Outlet location
SP6708045490 (OS grid reference) · View on Apple Maps
WFD catchment
Silverstone Brook (GB105033038250)
2024 spills / hours
152 / 2,071
Long-term average
107.2 spills a year (monitored since 2020)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 660 hours spilling →
Tributary River Tove River Gre 69 660 down 55% 100%
Akeley (Ex STW) PS
Storm discharge at pumping station
Company site name
AKELEY (EX STW) SP
EA ID / permit
AWS00010 · AWCNF417/10279
Outlet location
SP7106038010 (OS grid reference) · View on Apple Maps
WFD catchment
Leckhampstead Brook (GB105033037960)
2024 spills / hours
110 / 1,937
Long-term average
67.4 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 653 hours spilling →
Leckhampstead Brook 47 653 down 57% 100%
Market Harborough-Riverside Road
Storm tank at sewage works
Sewage works
Market Harborough Riverside Road
Company site name
MARKET HARBOROUGH STW
EA ID / permit
AWS00816 · AW5NF739A
Outlet location
SP7588088840 (OS grid reference) · View on Apple Maps
WFD catchment
Welland - conf Jordan to conf Langton Bk (GB105031045610)
2024 spills / hours
65 / 933
Long-term average
61.8 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 653 hours spilling →
River Welland Nt 48 653 down 26% 99%
Elm Hill Overflow
Overflow on sewer network
Company site name
NORWICH-FYE BRIDGE (N) SSO
EA ID / permit
AWS00398 · AW4NF519XK
Outlet location
TG2330009000 (OS grid reference) · View on Apple Maps
WFD catchment
Wensum DS Norwich (GB105034055882)
2024 spills / hours
79 / 617
Long-term average
65.0 spills a year (monitored since 2023)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 643 hours spilling →
Wensum Ds Norwich 70 643 down 11% 100%
Chelveston - Water Lane PS
Storm discharge at pumping station
Company site name
CHELVESTON-WATER LANE SP
EA ID / permit
AWS00224 · AWNNF2203
Outlet location
SP9873069530 (OS grid reference) · View on Apple Maps
WFD catchment
Chelveston Brook (GB105032045090)
2024 spills / hours
124 / 2,445
Long-term average
69.4 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 625 hours spilling →
River Nene 44 625 down 65% 100%
Fiskerton STW
Storm tank at sewage works
Sewage works
Fiskerton
EA ID / permit
AWS00439 · ANNNF13086
Outlet location
TF0535071800 (OS grid reference) · View on Apple Maps
WFD catchment
Witham - conf Catchwater Drain to conf Bain (GB205030062425)
2024 spills / hours
59 / 871
Long-term average
57.7 spills a year (monitored since 2023)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 620 hours spilling →
tributary North Delph 42 620 down 29% 100%
Witcham STW
Storm tank at sewage works
Sewage works
Witcham
Company site name
WITCHAM WRC
EA ID / permit
AWS01521 · AECNF1958
Outlet location
TL4707079610 (OS grid reference) · View on Apple Maps
WFD catchment
Old Bedford River / River Delph (inc The Hundred Foot Washes) (GB205033000060)
2024 spills / hours
29 / 344
Long-term average
33.0 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 615 hours spilling →
Witcham Catchwater River Ouse 42 615 up 45% 98%
Bolnhurst STW
Storm tank at sewage works
Sewage works
Bolnhurst
Company site name
Bolnhurst WRC
EA ID / permit
AWS00096 · AW1NF2802
Outlet location
TL0900060460 (OS grid reference) · View on Apple Maps
WFD catchment
Duloe Brook (GB105033043260)
2024 spills / hours
82 / 1,286
Long-term average
38.3 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Other maintenance / capital works (e.g. jetting)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 611 hours spilling →
Duloe Brook 40 611 down 51% 100%
Titchmarsh Water Recycling Centre
Storm tank at sewage works
Sewage works
Titchmarsh
Company site name
TITCHMARSH STW
EA ID / permit
AWS01389 · AW5NF/5212
Outlet location
TL0321079760 (OS grid reference) · View on Apple Maps
WFD catchment
Thorpe Waterville Brook (GB105032045190)
2024 spills / hours
124 / 2,221
Long-term average
81.3 spills a year (monitored since 2022)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 611 hours spilling →
Thorpe Brook River Nene Nt 42 611 down 66% 100%
Whaddon PS
Storm discharge at pumping station
Company site name
NASH-WHADDON ROAD (NEW) SP
EA ID / permit
AWS01553 · AWENF/2485
Outlet location
SP7853034500 (OS grid reference) · View on Apple Maps
WFD catchment
Beachampton Brook (GB105033037850)
2024 spills / hours
70 / 1,013
Long-term average
52.3 spills a year (monitored since 2023)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 571 hours spilling →
Beachampton Brook 36 571 down 49% 100%
Dickleburgh Water Recycling Centre
Storm tank at sewage works
Sewage works
Dickleburgh
Company site name
DICKLEBURGH-RECTORY RD STW
EA ID / permit
AWS00337 · AEENF2055
Outlet location
TM1714082750 (OS grid reference) · View on Apple Maps
WFD catchment
Dickleburgh Stream (GB105034045850)
2024 spills / hours
69 / 1,243
Long-term average
50.4 spills a year (monitored since 2021)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 564 hours spilling →
River Frenze River Waveney Nt 47 564 down 32% 100%
Barton-Upon-Humber WRC
Storm tank at sewage works
Sewage works
Barton Upon Humber
Company site name
BARTON ON HUMBER STW
EA ID / permit
AWS00062 · ANNTS13006
Outlet location
TA0352023530 (OS grid reference) · View on Apple Maps
WFD catchment
HUMBER MIDDLE (GB530402609202)
2024 spills / hours
25 / 566
Long-term average
38.8 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Pump failure / issue
Monitor below 90%
Telemetry or data archiving failure / issue · Resolved - Aug
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 559 hours spilling →
R Humber 46 559 up 84% 38%
Stanbridgeford WRC
Storm tank at sewage works
Sewage works
Stanbridgeford
Company site name
STANBRIDGEFORD STW
EA ID / permit
AWS01274 · AW1NF2574
Outlet location
SP9609022800 (OS grid reference) · View on Apple Maps
WFD catchment
Ouzel Brook (GB105033030530)
2024 spills / hours
160 / 3,249
Long-term average
108.3 spills a year (monitored since 2023)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 554 hours spilling →
Ouzel Brook & Trib Ouzel Bk Nt 39 554 down 76% 100%
Pumping Stn at Ivinghoe Aston STW
Storm discharge at pumping station
Company site name
IVINGHOE ASTON STW
EA ID / permit
AWS01016 · AWCNF10310
Outlet location
SP9467018690 (OS grid reference) · View on Apple Maps
WFD catchment
Whistle Brook (GB105033030490)
2024 spills / hours
131 / 2,081
Long-term average
88.0 spills a year (monitored since 2024)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 550 hours spilling →
Coombe Bottom Brook, R Ouzel 45 550 down 66% 100%
Hibaldstow Water Recycling Centre
Storm tank at sewage works
Sewage works
Hibaldstow
Company site name
HIBALDSTOW STW
EA ID / permit
AWS00592 · AW3NFF200
Outlet location
SE9800004700 (OS grid reference) · View on Apple Maps
WFD catchment
Ancholme from Bishopbridge to the Humber (GB104029067520)
2024 spills / hours
54 / 1,036
Long-term average
33.5 spills a year (monitored since 2022)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 540 hours spilling →
Hibaldstow Catchwater River An 26 540 down 52% 100%
Dunholme Water Recycling Centre
Storm tank at sewage works
Sewage works
Dunholme
Company site name
DUNHOLME STW
EA ID / permit
AWS00359 · ANNNF10274
Outlet location
TF0346079630 (OS grid reference) · View on Apple Maps
WFD catchment
Barlings Eau (GB105030062290)
2024 spills / hours
55 / 749
Long-term average
47.6 spills a year (monitored since 2021)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 539 hours spilling →
Dunholme Beck 42 539 down 24% 100%
Coningsby Water Recycling Centre
Storm tank at sewage works
Sewage works
Coningsby
Company site name
CONINGSBY STW
EA ID / permit
AWS00274 · ANNNF1049
Outlet location
TF2144056720 (OS grid reference) · View on Apple Maps
WFD catchment
Bain - Lower (GB105030062450)
2024 spills / hours
87 / 1,423
Long-term average
67.2 spills a year (monitored since 2020)
High-spill reason (company)
Data collection - Tidal / river inundation
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 537 hours spilling →
River Bain 38 537 down 56% 100%
Everdon STW
Inlet overflow at sewage works
Sewage works
Everdon
EA ID / permit
AWS00416 · AWNNF13345
Outlet location
SP6031057730 (OS grid reference) · View on Apple Maps
WFD catchment
Everdon Brook (GB105032045290)
2024 spills / hours
183 / 1,925
Long-term average
96.4 spills a year (monitored since 2021)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Monitor below 90%
Comms failure / issue · Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 531 hours spilling →
Everden Brook River Nene 62 531 down 66% 84%
Grimsby Pyewipe WRC and TPS
Inlet overflow at sewage works
Sewage works
Grimsby Pyewipe And Tps
Company site name
GRIMSBY-PYEWIPE SO WRC
EA ID / permit
AWS00529 · AW3TS519
Outlet location
TA2828013140 (OS grid reference) · View on Apple Maps
WFD catchment
HUMBER LOWER (GB530402609201)
2024 spills / hours
198 / 932
Long-term average
171.5 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Asset configuration (e.g. PS/rising main/storm tanks)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Env Act (SODRP) improvement ongoing, Operational improvement completed
Volume & pollution
Estimate from 506 hours spilling →
The River Humber 155 506 down 22% 100%
Ulceby STW
Storm tank at sewage works
Sewage works
Ulceby
EA ID / permit
AWS01414 · ANNNF13085
Outlet location
TA1115016540 (OS grid reference) · View on Apple Maps
WFD catchment
Skitter Beck / East Halton Beck (GB104029067655)
2024 spills / hours
40 / 551
Long-term average
58.0 spills a year (monitored since 2022)
High-spill reason (company)
Performance - Partial / no capacity due to blockage or restriction (e.g. roots / grid) - maintenance issue
Investigation
Env Act (SODRP) investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 506 hours spilling →
tributary Skitter Beck 36 506 down 10% 100%
Towcester Water Recycling Centre
Storm tank at sewage works
Sewage works
Towcester
Company site name
TOWCESTER STW
EA ID / permit
AWS01401 · AW1NF63
Outlet location
SP7155048690 (OS grid reference) · View on Apple Maps
WFD catchment
Tove (DS Greens Norton) (GB105033038180)
2024 spills / hours
119 / 2,305
Long-term average
53.0 spills a year (monitored since 2020)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement completed
Volume & pollution
Estimate from 504 hours spilling →
River Tove River Great Ouse N 31 504 down 74% 94%
Glooston Water Recycling Centre
Inlet overflow at sewage works
Sewage works
Glooston
Company site name
Glooston Water Recycling Centre
EA ID / permit
AWS00471 · AW5NF425
Outlet location
SP7452095590 (OS grid reference) · View on Apple Maps
WFD catchment
Stonton Brook (GB105031050460)
2024 spills / hours
132 / 1,814
Long-term average
88.0 spills a year (monitored since 2024)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 499 hours spilling →
Tributary of the River Welland 44 499 down 67% 100%
Horncastle Water Recycling Centre
Storm tank at sewage works
Sewage works
Horncastle
Company site name
HORNCASTLE STW
EA ID / permit
AWS00617 · ANNNF10519
Outlet location
TF2595067440 (OS grid reference) · View on Apple Maps
WFD catchment
Bain - Lower (GB105030062450)
2024 spills / hours
69 / 1,331
Long-term average
52.0 spills a year (monitored since 2023)
High-spill reason (company)
Performance - SW Infiltration
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 493 hours spilling →
Old River Bain 34 493 down 51% 100%
Corby STW
Storm tank at sewage works
Sewage works
Corby
EA ID / permit
AWS00278 · AW5NF5179
Outlet location
SP9076088840 (OS grid reference) · View on Apple Maps
WFD catchment
Southern Stream (GB105032045580)
2024 spills / hours
82 / 1,250
Long-term average
64.3 spills a year (monitored since 2023)
High-spill reason (company)
Not Applicable - Ongoing investigation
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
Volume & pollution
Estimate from 489 hours spilling →
Willow Brook (Southern Stream) 35 489 down 57% 99%
Hemswell Raf Camp STW
Storm tank at sewage works
Sewage works
Hemswell Raf Camp
Company site name
Hemswell (RAF) Camp Sewage Treatment Works
EA ID / permit
AWS00588 · ANNNF2068
Outlet location
SK9569089940 (OS grid reference) · View on Apple Maps
WFD catchment
Black Dyke (trib of Ancholme) (GB104029061890)
2024 spills / hours
42 / 442
Long-term average
33.2 spills a year (monitored since 2021)
High-spill reason (company)
Performance - Other maintenance / capital works (e.g. jetting)
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
Operational improvement ongoing
Volume & pollution
Estimate from 488 hours spilling →
Trib. of Black Dyke Nt 48 488 up 14% 100%
Louth STW
Storm tank at sewage works
Sewage works
Louth
EA ID / permit
AWS00772 · ANNNF1131
Outlet location
TF3589090320 (OS grid reference) · View on Apple Maps
WFD catchment
Louth Canal (GB104029061990)
2024 spills / hours
53 / 494
Long-term average
49.8 spills a year (monitored since 2020)
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation ongoing
Improvement
Env Act (SODRP) improvement ongoing
Volume & pollution
Estimate from 486 hours spilling →
Louth Canal 40 486 down 25% 100%

Sewage treatment works

Storm tanks and inlet overflows at each Anglian Water sewage works. The figures are 2025 spills.

← All water companies · Contains Environment Agency data licensed under the Open Government Licence v3.0. How to read the data.