Storm overflow register · Northumbrian Water

Blyth sewage works: storm overflow spills 2025

Blyth sewage treatment works, run by Northumbrian Water, has 1 monitored storm overflow discharging to River Blyth (Saline Estuary). In 2025 it recorded 31 spills totalling 381 hours, against 59 spills and 875 hours in 2024. By hours spilling, it ranks 52 of 183 Northumbrian Water works, where 1 spilled longest.

Works size: 37,321 population equivalent (BLYTH STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecBlyth (New) Sewage…1 Jan 2025 01:44 GMT, 8.8 h1 Jan 2025 13:59 GMT, 5.5 h1 Jan 2025 20:14 GMT, 3.3 h5 Jan 2025 11:14 GMT, 61.5 h19 Jul 2025 17:59 GMT, 2.7 h19 Jul 2025 20:41 GMT, 18 min19 Jul 2025 21:01 GMT, 8 min19 Jul 2025 21:11 GMT, 2 min19 Jul 2025 21:17 GMT, 24 min19 Jul 2025 21:43 GMT, 16 min15 Sep 2025 02:43 GMT, 102 min15 Sep 2025 04:27 GMT, 2 min15 Sep 2025 04:31 GMT, 2.9 h15 Sep 2025 07:29 GMT, 8 min15 Sep 2025 07:39 GMT, 2 min20 Sep 2025 15:19 GMT, 19 h21 Sep 2025 10:23 GMT, 22 min21 Sep 2025 10:47 GMT, 34 min21 Sep 2025 11:23 GMT, 2 min21 Sep 2025 11:27 GMT, 10 min21 Sep 2025 11:41 GMT, 22 min21 Sep 2025 12:05 GMT, 2 min3 Oct 2025 00:01 GMT, 2 min3 Oct 2025 00:05 GMT, 96 min3 Oct 2025 01:43 GMT, 4 min3 Oct 2025 01:55 GMT, 2 min3 Oct 2025 02:41 GMT, 2 min3 Oct 2025 15:33 GMT, 3.3 h3 Oct 2025 18:55 GMT, 86 min3 Oct 2025 20:23 GMT, 2 min3 Oct 2025 20:29 GMT, 2 min3 Oct 2025 20:35 GMT, 4 min3 Oct 2025 20:41 GMT, 2 min3 Oct 2025 20:53 GMT, 2 min3 Oct 2025 21:01 GMT, 2 min3 Oct 2025 21:43 GMT, 2 min3 Oct 2025 21:49 GMT, 2 min3 Oct 2025 21:53 GMT, 2 min3 Oct 2025 21:57 GMT, 2 min3 Oct 2025 22:09 GMT, 2 min3 Oct 2025 22:17 GMT, 2 min19 Oct 2025 22:03 GMT, 8.5 h20 Oct 2025 06:35 GMT, 8 min20 Oct 2025 07:01 GMT, 2 min13 Nov 2025 02:21 GMT, 2 min13 Nov 2025 02:38 GMT, 35.8 h19 Nov 2025 00:17 GMT, 27 h20 Nov 2025 20:49 GMT, 26.3 h23 Nov 2025 17:11 GMT, 57.9 h29 Nov 2025 19:29 GMT, 8.8 h1 Dec 2025 09:43 GMT, 29.7 h2 Dec 2025 15:29 GMT, 2 min2 Dec 2025 15:33 GMT, 2 min6 Dec 2025 04:29 GMT, 2 min6 Dec 2025 07:19 GMT, 6 min6 Dec 2025 07:27 GMT, 17.6 h7 Dec 2025 17:05 GMT, 30.8 h9 Dec 2025 06:57 GMT, 22.4 h

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low–high range. Method.

0100k200k300kJan 2025: 79 h spilling ≈ 50,518 m³ (range 20,123–126,829 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)JunJul 2025: 3.8 h spilling ≈ 2,430 m³ (range 968–6,101 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0–0.0 m³)AugSep 2025: 25 h spilling ≈ 16,243 m³ (range 6,470–40,778 m³)SepOct 2025: 16 h spilling ≈ 9,976 m³ (range 3,974–25,045 m³)OctNov 2025: 156 h spilling ≈ 99,630 m³ (range 39,685–250,125 m³)NovDec 2025: 101 h spilling ≈ 64,459 m³ (range 25,675–161,827 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
5 Jan 2025, 11:14Blyth (New) Sewage Treatment Works2.6 days15,665 – 98,734 m³
23 Nov 2025, 17:11Blyth (New) Sewage Treatment Works2.4 days14,748 – 92,954 m³
13 Nov 2025, 02:38Blyth (New) Sewage Treatment Works1.5 days9,119 – 57,474 m³
7 Dec 2025, 17:05Blyth (New) Sewage Treatment Works1.3 days7,854 – 49,501 m³
1 Dec 2025, 09:43Blyth (New) Sewage Treatment Works1.2 days7,574 – 47,735 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate243,320 m³range 96,919 – 610,864 m³
In litres243.3 millionrange 96.9 million – 610.9 million L
Olympic swimming pools97at 2,500 m³ each
Organic load, as people's raw sewage364,980person-days of untreated BOD

Assumed spill rate while spilling: 70.8 – 446.0 L/s (central 177.6 L/s), from a dry-weather flow of 70.8 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 3,877 kg21,899 kg122,173 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 10,177 kg103,411 kg440,433 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 184 kg1,533 kg5,681 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 116 kg633 kg3,299 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 9.7 trillion organisms243.3 trillion organisms6.1 × 10¹⁵ organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Blyth (New) Sewage Treatment Works

Storm tank at sewage works · discharges to River Blyth (Saline Estuary)

Spills 2025
31 (380 hours) · down 47% on 2024
Spills 2024
59 (875 hours)
Long-term average
68.3 spills a year (monitored since 2020)
Monitor uptime
98% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Operational investigation completed
Improvement
Operational improvement ongoing
WFD catchment
BLYTH (N) (GB510302203200)
Outlet location
NZ2948982336 (OS grid reference) · View on Apple Maps
EA ID / permit
NWL00162 · 226/1179 · company name: BLYTH SEWAGE TREATMENT WORKS

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Northumbrian Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.