Leamside sewage treatment works, run by Northumbrian Water, has 1 monitored storm overflow discharging to River Wear. In 2025 it recorded 37 spills totalling 417 hours, against 10 spills and 123 hours in 2024. By hours spilling, it ranks 44 of 183 Northumbrian Water works, where 1 spilled longest.

Works size: 2,394 population equivalent (WEST RAINTON (Leamside) STW, UWWTD 2018). Used for the spill volume estimate.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecLeamside Sewage…11 spills, 4.8 h, 19 Jul to 20 Jul14 spills, 4.5 h, 3 Oct to 4 Oct15 spills, 1.9 h, 20 Oct to 20 Oct12 spills, 65.4 h, 13 Nov to 15 Nov15 spills, 34 h, 19 Nov to 20 Nov99 spills, 44.2 h, 23 Nov to 27 Nov42 spills, 79.4 h, 28 Nov to 3 Dec151 spills, 120 h, 4 Dec to 11 Dec53 spills, 58.2 h, 15 Dec to 19 Dec20 Dec 2025 13:46 GMT, 2 min10 spills, 4.3 h, 22 Dec to 22 Dec

Estimated spill volume by month, 2025

Hours spilling each month × the estimated spill rate for a works of this size. The bars are central estimates and the whiskers show the low-high range. Method.

010k20k30kJan 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JanFeb 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)FebMar 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MarApr 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AprMay 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)MayJun 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)JunJul 2025: 4.8 h spilling ≈ 197 m³ (range 78-494 m³)JulAug 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)AugSep 2025: 0.0 h spilling ≈ 0.0 m³ (range 0.0-0.0 m³)SepOct 2025: 6.4 h spilling ≈ 263 m³ (range 105-659 m³)OctNov 2025: 187 h spilling ≈ 7,663 m³ (range 3,052-19,237 m³)NovDec 2025: 219 h spilling ≈ 8,979 m³ (range 3,577-22,543 m³)Dec
Cubic metres (m³), estimate. Hours are measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDurationEstimated volume
13 Nov 2025, 00:16Leamside Sewage Treatment Works2.0 days768 - 4,840 m³
17 Dec 2025, 18:24Leamside Sewage Treatment Works1.3 days508 - 3,203 m³
5 Dec 2025, 16:14Leamside Sewage Treatment Works1.3 days500 - 3,151 m³
9 Dec 2025, 05:28Leamside Sewage Treatment Works1.2 days490 - 3,086 m³
1 Dec 2025, 06:26Leamside Sewage Treatment Works1.2 days477 - 3,007 m³

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

Volume, central estimate17,097 m³range 6,810 - 42,923 m³
In litres17.1 millionrange 6.8 million - 42.9 million L
Olympic swimming pools6.8at 2,500 m³ each
Organic load, as people's raw sewage25,646person-days of untreated BOD

Assumed spill rate while spilling: 4.5 - 28.6 L/s (central 11.4 L/s), from a dry-weather flow of 4.5 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 272 kg1,539 kg8,585 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 715 kg7,266 kg30,947 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 13 kg108 kg399 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3-9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 8.2 kg44 kg232 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 681.0 billion organisms17.1 trillion organisms429.2 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Leamside Sewage Treatment Works

Storm tank at sewage works · discharges to River Wear

Spills 2025
37 (417 hours) · up 270% on 2024
Spills 2024
10 (123 hours)
Long-term average
38.8 spills a year (monitored since 2020)
Monitor uptime
61% of the year · Installation set-up/design issue
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing, Operational investigation completed
Improvement
No improvement action in reporting period
WFD catchment
Wear from Croxdale Beck to Lumley Park Burn (GB103024077621)
Outlet location
NZ2971146647 (OS grid reference) · View on Apple Maps
EA ID / permit
NWL01490 · 245/1271

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024-25 [EA]. Infiltration of groundwater into sewers is taken as 0-40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies - environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 - per capita consumption
  3. HBF: Foul sewer design - historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 - CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Northumbrian Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.