Storm overflow register · Northumbrian Water

Satley sewage works: storm overflow spills 2025

Satley sewage treatment works, run by Northumbrian Water, has 1 monitored storm overflow discharging to Steeley Burn. In 2025 it recorded 50 spills totalling 132 hours, against 59 spills and 352 hours in 2024. By hours spilling, it ranks 113 of 183 Northumbrian Water works, where 1 spilled longest.

Every spill in 2025

Each blue mark is one spill, placed by when it started and sized by how long it lasted. Hover over a mark for the date and duration.

JanFebMarAprMayJunJulAugSepOctNovDecSatley STW1 Jan 2025 04:29 GMT, 2.3 h13 Jan 2025 12:14 GMT, 12.3 h24 Jan 2025 06:14 GMT, 15 min27 Jan 2025 02:14 GMT, 4.3 h27 Jan 2025 06:44 GMT, 15 min27 Jan 2025 11:59 GMT, 45 min27 Jan 2025 12:59 GMT, 15 min28 Jan 2025 05:59 GMT, 15 min28 Jan 2025 06:29 GMT, 30 min28 Jan 2025 07:14 GMT, 15 min28 Jan 2025 15:59 GMT, 15 min28 Jan 2025 16:59 GMT, 15 min28 Jan 2025 18:29 GMT, 15 min28 Jan 2025 22:14 GMT, 15 min20 Feb 2025 13:29 GMT, 30 min12 Mar 2025 17:14 GMT, 15 min22 Mar 2025 17:21 GMT, 16 min22 Mar 2025 20:35 GMT, 32 min22 Mar 2025 21:15 GMT, 4 min22 Mar 2025 21:39 GMT, 34 min22 Mar 2025 23:11 GMT, 36 min22 Mar 2025 23:51 GMT, 4 min4 Jun 2025 22:47 GMT, 4 min5 Jun 2025 01:39 GMT, 6 min7 Jun 2025 12:01 GMT, 20 min14 Jun 2025 00:33 GMT, 4 min14 Jun 2025 13:49 GMT, 6 min14 Jun 2025 13:59 GMT, 6 min21 Jun 2025 19:55 GMT, 12 min6 Jul 2025 15:15 GMT, 15 min7 Jul 2025 20:15 GMT, 30 min14 Jul 2025 13:45 GMT, 15 min19 Jul 2025 13:12 GMT, 14 min19 Jul 2025 13:48 GMT, 2 h19 Jul 2025 17:20 GMT, 2 min19 Jul 2025 17:26 GMT, 4 min19 Jul 2025 17:32 GMT, 2 min19 Jul 2025 17:36 GMT, 4 min20 Jul 2025 16:18 GMT, 16 min11 Aug 2025 20:12 GMT, 26 min10 Sep 2025 18:20 GMT, 6 min10 Sep 2025 19:38 GMT, 20 min12 Sep 2025 20:38 GMT, 16 min14 Sep 2025 22:38 GMT, 22 min15 Sep 2025 02:18 GMT, 4 min15 Sep 2025 06:46 GMT, 26 min17 Sep 2025 04:50 GMT, 2 min20 Sep 2025 05:54 GMT, 24 min20 Sep 2025 07:04 GMT, 8 min20 Sep 2025 07:34 GMT, 36 min20 Sep 2025 08:12 GMT, 2 min20 Sep 2025 12:16 GMT, 8 min20 Sep 2025 12:58 GMT, 20 min20 Sep 2025 13:26 GMT, 4 min20 Sep 2025 14:00 GMT, 10.9 h3 Oct 2025 04:36 GMT, 4 min3 Oct 2025 13:32 GMT, 2.9 h3 Oct 2025 16:30 GMT, 4 min19 Oct 2025 21:20 GMT, 16 min28 Oct 2025 00:16 GMT, 8 min7 Nov 2025 19:36 GMT, 24 min11 Nov 2025 20:12 GMT, 40 min12 Nov 2025 21:42 GMT, 10.3 h13 Nov 2025 08:08 GMT, 10 min13 Nov 2025 08:34 GMT, 7.1 h13 Nov 2025 15:46 GMT, 4 min13 Nov 2025 15:52 GMT, 2 min13 Nov 2025 16:04 GMT, 4 min13 Nov 2025 16:44 GMT, 2 min13 Nov 2025 18:26 GMT, 6 min13 Nov 2025 18:52 GMT, 4 min13 Nov 2025 19:12 GMT, 12 min13 Nov 2025 19:38 GMT, 2 min13 Nov 2025 20:06 GMT, 28 min13 Nov 2025 20:38 GMT, 4 min13 Nov 2025 21:06 GMT, 2 min13 Nov 2025 22:40 GMT, 4 min13 Nov 2025 22:54 GMT, 2.9 h14 Nov 2025 01:52 GMT, 4 min14 Nov 2025 01:58 GMT, 3.1 h14 Nov 2025 05:06 GMT, 6 min14 Nov 2025 05:14 GMT, 4 min14 Nov 2025 05:38 GMT, 2 min14 Nov 2025 06:30 GMT, 2 min14 Nov 2025 07:54 GMT, 26 min14 Nov 2025 08:22 GMT, 4 min14 Nov 2025 08:48 GMT, 2 min14 Nov 2025 09:46 GMT, 2 min14 Nov 2025 10:44 GMT, 2 min14 Nov 2025 11:46 GMT, 2 min14 Nov 2025 12:52 GMT, 16 min14 Nov 2025 13:30 GMT, 30 min14 Nov 2025 14:28 GMT, 90 min14 Nov 2025 16:42 GMT, 4 min14 Nov 2025 17:10 GMT, 2 min14 Nov 2025 17:14 GMT, 4 min14 Nov 2025 17:32 GMT, 4 min14 Nov 2025 17:42 GMT, 30 min14 Nov 2025 18:26 GMT, 2 min14 Nov 2025 18:36 GMT, 2 min14 Nov 2025 19:16 GMT, 2 min14 Nov 2025 19:40 GMT, 4 min14 Nov 2025 19:46 GMT, 8 min14 Nov 2025 20:28 GMT, 44 min14 Nov 2025 21:14 GMT, 12 min14 Nov 2025 21:34 GMT, 2 min14 Nov 2025 21:58 GMT, 37.2 h23 Nov 2025 06:30 GMT, 60 min24 Nov 2025 06:56 GMT, 64 min28 Nov 2025 11:30 GMT, 62 min29 Nov 2025 15:54 GMT, 3.2 h29 Nov 2025 19:06 GMT, 4 min29 Nov 2025 19:24 GMT, 2 min1 Dec 2025 05:56 GMT, 6 min1 Dec 2025 14:38 GMT, 34 min1 Dec 2025 20:38 GMT, 2 min5 Dec 2025 18:34 GMT, 24 min5 Dec 2025 19:28 GMT, 2 min5 Dec 2025 20:40 GMT, 2 min5 Dec 2025 23:48 GMT, 2 min7 Dec 2025 14:04 GMT, 2 min7 Dec 2025 14:14 GMT, 2 min7 Dec 2025 14:38 GMT, 2 min7 Dec 2025 14:50 GMT, 24 min7 Dec 2025 15:20 GMT, 2.2 h7 Dec 2025 17:58 GMT, 22 min9 Dec 2025 05:14 GMT, 46 min9 Dec 2025 11:24 GMT, 30 min9 Dec 2025 11:56 GMT, 30 min9 Dec 2025 12:30 GMT, 2 min9 Dec 2025 12:54 GMT, 20 min9 Dec 2025 13:16 GMT, 68 min9 Dec 2025 14:26 GMT, 6 min10 Dec 2025 10:38 GMT, 12 min10 Dec 2025 11:20 GMT, 20 min10 Dec 2025 12:12 GMT, 2 min15 Dec 2025 11:08 GMT, 16 min17 Dec 2025 20:32 GMT, 18 min21 Dec 2025 23:58 GMT, 36 min

Hours spilling by month, 2025

020406080Jan 2025: 22 hours spillingJanFeb 2025: 0.5 hours spillingFebMar 2025: 2.4 hours spillingMarApr 2025: 0.0 hours spillingAprMay 2025: 0.0 hours spillingMayJun 2025: 1.0 hours spillingJunJul 2025: 3.7 hours spillingJulAug 2025: 0.4 hours spillingAugSep 2025: 14 hours spillingSepOct 2025: 3.5 hours spillingOctNov 2025: 75 hours spillingNovDec 2025: 9.4 hours spillingDec
Hours, measured by the event duration monitor.

Longest single spills

Started (GMT)OverflowDuration
14 Nov 2025, 21:58Satley STW1.6 days
13 Jan 2025, 12:14Satley STW12.3 h
20 Sep 2025, 14:00Satley STW10.9 h
12 Nov 2025, 21:42Satley STW10.3 h
13 Nov 2025, 08:34Satley STW7.1 h

Estimated 2025 spill volume and pollution

Estimate, not a measurement. Monitors record how long an overflow spills, not how much. This calculator back-calculates a spill rate from the size of the works, using the Environment Agency's permit formulae, and multiplies it by published storm-sewage concentrations. How it works.

This works serves fewer than 2,000 people, or was not matched to a UWWTD report, so its size is not published. The population equivalent above is a placeholder of 1,000. Enter the population served if you know it.

Volume, central estimate2,260 m³range 900 – 5,674 m³
In litres2.3 millionrange 900,218 – 5.7 million L
Olympic swimming pools0.9at 2,500 m³ each
Organic load, as people's raw sewage3,390person-days of untreated BOD

Assumed spill rate while spilling: 1.9 – 11.9 L/s (central 4.8 L/s), from a dry-weather flow of 1.9 L/s.

Pollutant releasedLowCentralHighConcentration used (low / typical / high)
BOD₅ (organic load) 36 kg203 kg1,135 kg 40 / 90 / 200 mg/L
Low/high: Europe range, Ellis & Jenkins 2005; typical: UK, Ellis & Jenkins 2005 (both via botturi)
Suspended solids 95 kg961 kg4,091 kg 105 / 425 / 721 mg/L
Low/high: Europe range; typical: UK, Ellis & Jenkins 2005 (via botturi)
Ammonium-N 1.7 kg14 kg53 kg 1.9 / 6.3 / 9.3 mg/L
Low: Germany, Brombach 2005; typical/high: Paris range 3.3–9.3 midpoint and top, Gasperi 2012 (via botturi); no UK value found
Total phosphorus 1.1 kg5.9 kg31 kg 1.2 / 2.6 / 5.4 mg/L
Low/high: Paris, Gasperi 2012; typical: Slovakia (via botturi). UK figure of 10 mg/L treated as an outlier
E. coli 90.0 billion organisms2.3 trillion organisms56.7 trillion organisms 10,000 / 100,000 / 1.0 million per 100 mL
Median range at CSO and retention-tank outlets, Stott et al. 2018 (via botturi); typical = log midpoint

Low combines the low spill rate with low concentrations, and high combines high with high, so the true figure is very likely inside the range. Long spills become more diluted as they go on, so the central figure tends to overstate the load of long events. The calculator does not estimate the effect on the receiving water, which depends on river flow or tide at the time of the spill.

Satley STW

Inlet overflow at sewage works · discharges to Steeley Burn

Spills 2025
50 (132 hours) · down 15% on 2024
Spills 2024
59 (352 hours)
Long-term average
55.6 spills a year (monitored since 2021)
Monitor uptime
95% of the year
High-spill reason (company)
Not asset maintenance - Hydraulic capacity
Investigation
Env Act (SODRP) investigation ongoing
Improvement
No improvement action in reporting period
WFD catchment
Browney from Source to Pan Burn (GB103024077310)
Outlet location
NZ1200943833 (OS grid reference) · View on Apple Maps
EA ID / permit
NWL01143 · 244/0042

How the estimate works

  1. Dry-weather flow (DWF) = population × water use per person × (1 + infiltration). Water use is 136.5 L per person per day, England's per-capita consumption for 2024–25 [EA]. Infiltration of groundwater into sewers is taken as 0–40% of that flow [Escritt, via HBF]. The Environment Agency defines DWF as PG + I + E [EA].
  2. Population. The size of each works comes from the load entering it as reported under the Urban Waste Water Treatment Directive, in population equivalents (1 p.e. = 60 g of BOD a day) [UWWTD]. We treat population equivalent as population. That overstates flow where trade effluent adds load, and no official source links the two. Works serving fewer than 2,000 p.e. are not reported, so their size has to be entered by hand.
  3. Low spill rate = DWF. This is the method used by Giakoumis & Voulvoulis (2026), which they note likely underestimates storm loads [G&V].
  4. High spill rate = Formula A − flow to full treatment = (DWF + 1360P) − 3DWF. This is the largest flow the permit expects the storm tanks to handle before it passes on to treatment or overflows [EA]. The central rate is the geometric mean of the low and high rates.
  5. Volume = spill rate × hours spilling, with hours taken from the event duration monitor.
  6. Pollution = volume × published storm-sewage concentrations [Botturi et al.] [US EPA]. Organic load is also shown as person-days of untreated sewage at 60 g of BOD per person per day [UWWTD].

What this cannot tell you. It gives no real flow for any single spill, and no effect on the river or sea, which depends on the flow, tide and the other pressures on the water at the time. It gives no figure for spills from overflows on the sewer network, which serve catchments of unknown size. It is a way to put hours into rough physical terms, not a substitute for flow monitoring.

Sources

  1. EA: Water companies – environmental permits for storm overflows and emergency overflows
  2. EA: Water resources 2024 to 2025 – per capita consumption
  3. HBF: Foul sewer design – historic conventions (citing Escritt 1984 on infiltration)
  4. Giakoumis & Voulvoulis (2026), Environ. Sci.: Water Res. Technol., doi:10.1039/D5EW00860C
  5. Botturi et al. (2021), Crit. Rev. Environ. Sci. Technol. 51:1585 – CSO quality review, Table 2
  6. US EPA (2004) Report to Congress on CSOs and SSOs, chapter 4
  7. Urban Waste Water Treatment Directive, Article 2(6): 1 p.e. = 60 g BOD5/day
  8. Olympic-size swimming pool: 2,500 m³ at the nominal 2 m depth

← All Northumbrian Water works · Contains Environment Agency data licensed under the Open Government Licence v3.0. Spill start and stop times: © Environment Agency copyright and/or database right 2026. All rights reserved. They are water-company data and have not been verified by the Environment Agency. Works size: EEA Waterbase UWWTD. How to read the data.